Solving the resource-constrained multi-project scheduling problem with an improved critical chain method

ORCID Icon, &
Pages 1243-1258 | Received 13 Apr 2018, Accepted 13 Apr 2019, Published online: 14 Jun 2019

References

  • Araszkiewicz, K. (2017). Application of critical chain management in construction projects schedules in a multi-project environment: A case study. Procedia Engineering, 182, 33–41. doi: 10.1016/j.proeng.2017.03.108
  • Bie, L., & Cui, N. F. (2011). Capacity constraint buffer sizing method for critical chain multi-project scheduling. Computer Integrated Manufacturing Systems, 17(7), 1534–1540.
  • Browning, T., & Yassine, A. (2010). Resource-constrained multi-project scheduling: Priority rule performance revisited. International Journal of Production Economics, 126(2), 212–228. doi: 10.1016/j.ijpe.2010.03.009
  • Cohen, I., Mandelbaum, A., & Shtub, A. (2004). Multi-project scheduling and control: A process-based comparative study of the critical chain methodology and some alternatives. Project Management Journal, 35(2), 39–50. doi: 10.1177/875697280403500206
  • Demeulemeester, E., & Herroelen, W. (2011). Robust project scheduling. Foundations and Trends® in Technology, Information and Operations Management, 3(3–4), 201–376. doi: 10.1561/0200000021
  • Goldratt, E. M. (1997). Critical chain. Great Barrington, MA: The North River Press.
  • Hazır, Ö., Haouari, M., & Erel, E. (2010). Robust scheduling and robustness measures for the discrete time/cost trade-off problem. European Journal of Operational Research, 207(2), 633–643. doi: 10.1016/j.ejor.2010.05.046
  • Herroelen, W., & Leus, R. (2000). On the merits and pitfalls of critical chain scheduling. Journal of Operations Management, 19(5), 559–577. doi: 10.1016/S0272-6963(01)00054-7
  • Hu, X., Cui, N., Demeulemeester, E., & Bie, L. (2016). Incorporation of activity sensitivity measures into buffer management to manage project schedule risk. European Journal of Operational Research, 249(2), 717–727. doi: 10.1016/j.ejor.2015.08.066
  • Leach, L. (2004). Critical chain project management (2nd ed.). London: Artech House.
  • Leach, L. P. (1999). Critical chain project management improves project performance. Project Management Journal, 30(2), 39–51. doi: 10.1177/875697289903000207
  • Lechler, T. G., Ronen, B., & Stohr, E. A. (2015). Critical chain: A new project management paradigm or old wine in new bottles? Engineering Management Journal, 17(4), 45–58. doi: 10.1080/10429247.2005.11431672
  • Li, X. B., Nie, M., Yang, G. H., & Wang, X. (2017). The study of multi-project resource management method suitable for research institutes from application perspective. Procedia Engineering, 174, 155–160. doi: 10.1016/j.proeng.2017.01.191
  • Mehdizadeh, E., & Akbari, H. (2017). A novel vibration damping optimization algorithm for resource constrained multi-project scheduling problem. Economic Computation & Economic Cybernetics Studies & Research, 51(2), 291–309.
  • Newbold, R. C. (1998). Project management in the fast lane: Applying the theory of constraints. New York: St Lucie Press.
  • Pamay, M. B., Bülbül, K., & Ulusoy, G. (2014). Dynamic resource constrained multi-project scheduling problem with weighted earliness/tardiness costs. Boston, MA: Springer.
  • Payne, J. H. (1995). Management of multiple simultaneous projects: A state-of-the-art review. International Journal of Project Management, 13(3), 163–168. doi: 10.1016/0263-7863(94)00019-9
  • Peng, W., & Huang, M. (2014). A critical chain project scheduling method based on a differential evolution algorithm. International Journal of Production Research, 52(13), 3940–3949. doi: 10.1080/00207543.2013.865091
  • Roghanian, E., Alipour, M., & Rezaei, M. (2017). An improved fuzzy critical chain approach in order to face uncertainty in project scheduling. International Journal of Construction Management, 18(1), 1–13. doi: 10.1080/15623599.2016.1225327
  • Tian, W., Hu, M., & Cui, N. (2014). Review of studies on robust project scheduling under uncertainty. Journal of Systems Engineering, 29(1), 135–144.
  • Tukel, O., Rom, W., & Eksioglu, S. (2006). An investigation of buffer sizing techniques in critical chain scheduling. European Journal of Operational Research, 172(2), 401–416. doi: 10.1016/j.ejor.2004.10.019
  • Vanhoucke, M. (2013). Project management with dynamic scheduling. New York: Springer.
  • Vonder, S. V. D., Demeulemeester, E., Herroelen, W., & Leus, R. (2006). The trade-off between stability and makespan in resource-constrained project scheduling. International Journal of Production Research, 44(2), 215–236. doi: 10.1080/00207540500140914
  • Wang, H. P., Liu, B. N., & Dong, X. F. (2013). The recognition and optimization of the critical chain. Heidelberg, Berlin: Springer.
  • Wang, W., Wang, X., Ge, X., & Deng, L. (2014). Multi-objective optimization model for multi-project scheduling on critical chain. Advances in Engineering Software, 68, 33–39. doi: 10.1016/j.advengsoft.2013.11.004
  • Wang, Y. (2011 August). Study on critical chain project portfolio management. In: J. M. Shaeffer & C. C. Chan (Eds.). Paper presented at 2011 International Conference on Management and Service Science (pp. 1–4). Wuhan, China: IEEE.
  • Yang, S., & Fu, L. (2014). Critical chain and evidence reasoning applied to multi-project resource schedule in automobile R&D process. International Journal of Project Management, 32(1), 166–177. doi: 10.1016/j.ijproman.2013.01.010
  • Zhang, J. G., Song, X. W., Chen, H. Y., & Shi, R. X. (2016). Determination of critical chain project buffer based on information flow interactions. Journal of the Operational Research Society, 67(9), 1146–1157. doi: 10.1057/jors.2016.9.
  • Zhang, J. G., Song, X. W., & Díaz, E. (2016). Project buffer sizing of a critical chain based on comprehensive resource tightness. European Journal of Operational Research, 248(1), 174–182. doi: 10.1016/j.ejor.2015.07.009
  • Zheng, Z., Guo, Z., Zhu, Y., & Zhang, X. (2014). A critical chains based distributed multi-project scheduling approach. Neurocomputing, 143, 282–293. doi: 10.1016/j.neucom.2014.04.056

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.