397
Views
3
CrossRef citations to date
0
Altmetric
Original Articles

Sublevel stope layout planning through a greedy heuristic approach based on dynamic programming

&
Pages 554-563 | Received 16 Jul 2018, Accepted 04 Nov 2019, Published online: 27 Jan 2020

References

  • Afshin Mansouri, S., & Aktas, E. (2016). Minimizing energy consumption and makespan in a two-machine flowshop scheduling problem. Journal of the Operational Research Society, 67(11), 1382–1394. doi:10.1057/jors.2016.4
  • Alford, C. (1995). Optimization in underground mine design. 25th International Application of Computers and Operations Research in the Mineral Industry Symposium Proceedings. Brisbane, Australia: AusIMM.
  • Anjomshoa, H., Albrecht, A. R., Lee, D. H., & Pudney, P. J. (2013). Optimising passing bay locations and vehicle schedules in underground mines. Journal of the Operational Research Society, 64(2), 241–249. doi:10.1057/jors.2012.42
  • Ataee-Pour, M. (1997). A new heuristic algorithm to optimise stope boundaries. Proceeding of the 2nd Regional APCOM Symposium on Computer Applications in the Mineral Industry. Moscow, Russia: Moscow State Mining University.
  • Bai, X., Marcotte, D., & Simon, R. (2013). Underground stope optimization with network flow method. Computers & Geosciences, 52, 361–371. doi:10.1016/j.cageo.2012.10.019
  • Bai, X., Marcotte, D., & Simon, R. (2014). A heuristic sublevel stope optimizer with multiple raises. Journal of the Southern African Institute of Mining and Metallurgy, 114(6), 427–434.
  • Cheimanoff, N., Deliac, E., & Mallet, J. (1989). GEOCAD: An alternative CAD and artificial intelligence tool that helps moving from geological resources to mineable reserves. In 21st International Symposium on the Application of Computers and Operations Research in the Mineral Industry. Colorado, USA: SME.
  • Cressie, N. (1990). The origins of kriging. Mathematical Geology, 22(3), 239–252. doi:10.1007/BF00889887
  • Foroughi, S., Hamidi, J. K., Monjezi, M., & Nehring, M. (2019). The integrated optimization of underground stope layout designing and production scheduling incorporating a non-dominated sorting genetic algorithm (NSGA-II). Resources Policy, 63, 101408. doi:10.1016/j.resourpol.2019.101408
  • Kovalyov, M. Y., Ng, C., & Cheng, T. E. (2007). Fixed interval scheduling: Models, applications, computational complexity and algorithms. European Journal of Operational Research, 178(2), 331–342. doi:10.1016/j.ejor.2006.01.049
  • Kumral, M. (2011). Incorporating geo-metallurgical information into mine production scheduling. Journal of the Operational Research Society, 62(1), 60–68. doi:10.1057/jors.2009.174
  • Kumral, M. (2012). Production planning of mines: Optimisation of block sequencing and destination. International Journal of Mining, Reclamation and Environment, 26(2), 93–103. doi:10.1080/17480930.2011.644474
  • Lovász, L. (1994). Stable sets and polynomials. Discrete Mathematics, 124(1-3), 137–153. doi:10.1016/0012-365X(92)00057-X
  • Menabde, M., Froyland, G., Stone, P., & Yeates, G. (2018). Mining schedule optimisation for conditionally simulated orebodies. In Advances in applied strategic mine planning (pp. 91–100. Cham, Switzerland: Springer.
  • Nelis, G., Gamache, M., Marcotte, D., & Bai, X. (2016). Stope optimization with vertical convexity constraints. Optimization and Engineering, 17(4), 813–832. doi:10.1007/s11081-016-9321-6
  • Nezhadshahmohammad, F., Aghababaei, H., & Pourrahimian, Y. (2018). Draw rate management system using mathematical programming in extraction sequence optimisation of block cave mining. International Journal of Mining and Mineral Engineering, 9(1), 32–53. doi:10.1504/IJMME.2018.091217
  • Ng, C. T., Cheng, T. C. E., Bandalouski, A. M., Kovalyov, M. Y., & Lam, S. S. (2014). A graph-theoretic approach to interval scheduling on dedicated unrelated parallel machines. Journal of the Operational Research Society, 65(10), 1571–1579. doi:10.1057/jors.2013.109
  • Nhleko, A. S., Tholana, T., & Neingo, P. N. (2018). A review of underground stope boundary optimization algorithms. Resources Policy, 56, 59–69. doi:10.1016/j.resourpol.2017.12.004
  • Nikbin, V., Ataeepour, M., Shahriar, K., Pourrahimian, Y., & MirHassani, S. A. (2019). Stope boundary optimization: A mathematical model and efficient heuristics. Resources Policy, 62, 515–526. doi:10.1016/j.resourpol.2018.10.007
  • Ovanic, J., & Young, D. (1995). Economic optimisation of stope geometry using separable programming with special branch and bound techniques. In Third Canadian conference on computer applications in the mineral industry. Rotterdam, Netherlands: Balkema.
  • Pourrahimian, Y. (2013). Mathematical programming for sequence optimization in block cave mining (Doctoral Dissertation). Edmonton, AB: University of Alberta.
  • Remy, N., Boucher, A., & Wu, J. (2009). Applied geostatistics with SGeMS: A user's guide. Cambridge: Cambridge University Press.
  • Sakai, S., Togasaki, M., & Yamazaki, K. (2003). A note on greedy algorithms for the maximum weighted independent set problem. Discrete Applied Mathematics, 126(2–3), 313–322. doi:10.1016/S0166-218X(02)00205-6
  • Sandanayake, D. S. S., Topal, E., & Asad, M. W. A. (2015). A heuristic approach to optimal design of an underground mine stope layout. Applied Soft Computing, 30, 595–603. doi:10.1016/j.asoc.2015.01.060
  • Sari, Y. A. (2019). Novel Optimization Models for Surface and Underground Mine Planning (Doctoral Dissertation). Montreal, QC: McGill University.
  • Topal, E., & Sens, J. (2010). A new algorithm for stope boundary optimization. Journal of Coal Science and Engineering (China), 16(2), 113–119. doi:10.1007/s12404-010-0201-y
  • Villalba Matamoros, M. E., & Kumral, M. (2017). Heuristic stope layout optimisation accounting for variable stope dimensions and dilution management. International Journal of Mining and Mineral Engineering, 8(1), 1–18. doi:10.1504/IJMME.2017.10003210
  • Villalba Matamoros, M. E., & Kumral, M. (2018). Underground mine planning: Stope layout optimisation under grade uncertainty using genetic algorithms. International Journal of Mining, Reclamation and Environment, 33(5), 353–370. doi:10.1080/17480930.2018.1486692

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.