References
- Agra, A., & Oliveira, M. (2018). MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem. European Journal of Operational Research, 264(1), 138–148. https://doi.org/https://doi.org/10.1016/j.ejor.2017.05.040
- Al-Dhaheri, N., Jebali, A., & Diabat, A. (2016). A simulation-based Genetic Algorithm approach for the quay crane scheduling under uncertainty. Simulation Modelling Practice and Theory, 66, 122–138. https://doi.org/https://doi.org/10.1016/j.simpat.2016.01.009
- Alsoufi, G., Yang, X., & Salhi, A. (2018). Combined quay crane assignment and quay crane scheduling with crane inter-vessel movement and non-interference constraints. Journal of the Operational Research Society, 69(3), 372–383. https://doi.org/https://doi.org/10.1057/s41274-017-0226-3
- Bierwirth, C., & Meisel, F. (2010). A survey of berth allocation and quay crane scheduling problems in container terminals. European Journal of Operational Research, 202(3), 615–627. https://doi.org/https://doi.org/10.1016/j.ejor.2009.05.031
- Bierwirth, C., & Meisel, F. (2015). A follow-up survey of berth allocation and quay crane scheduling problems in container terminals. European Journal of Operational Research, 244(3), 675–689. https://doi.org/https://doi.org/10.1016/j.ejor.2014.12.030
- Blazewicz, J., Cheng, T. C. E., Machowiak, M., & Oguz, C. (2011). Berth and quay crane allocation: A moldable task scheduling model. Journal of the Operational Research Society, 62(7), 1189–1197. https://doi.org/https://doi.org/10.1057/jors.2010.54
- Cahyono, R. T., Flonk, E. J., & Jayawardhana, B. (2020). Discrete-event systems modeling and the model predictive allocation algorithm for integrated berth and quay crane allocation. IEEE Transactions on Intelligent Transportation Systems, 21(3), 1321–1331. https://doi.org/https://doi.org/10.1109/TITS.2019.2910283
- Carlo, H. J., Vis, I. F. A., & Roodbergen, K. J. (2014). Transport operations in container terminals: Literature overview, trends, research directions and classification scheme. European Journal of Operational Research, 236(1), 1–13. https://doi.org/https://doi.org/10.1016/j.ejor.2013.11.023
- Chargui, T., Bekrar, A., Reghioui, M., & Trentesaux, D. (2019). Tabu search robustness for cross-dock and pi-hub scheduling under possible internal transportation breakdowns. In T. Borangiu, D. Trentesaux, A. Thomas, & S. Cavalieri (Eds.), Service orientation in holonic and multi-agent manufacturing (pp. 295–307). Springer International Publishing.
- Chargui, T., Bekrar, A., Reghioui, M., & Trentesaux, D. (2020). Scheduling trucks and storage operations in a multiple-door cross-docking terminal considering multiple storage zones. International Journal of Production Research, 1–25. https://doi.org/https://doi.org/10.1080/00207543.2020.1853843
- Cossari, A., Ho, J. C., Paletta, G., & Ruiz-Torres, A. J. (2013). Minimizing workload balancing criteria on identical parallel machines. Journal of Industrial and Production Engineering, 30(3), 160–172. https://doi.org/https://doi.org/10.1080/21681015.2013.795504
- Demir, E., Bektaş, T., & Laporte, G. (2014). The bi-objective pollution-routing problem. European Journal of Operational Research, 232(3), 464–478. https://doi.org/https://doi.org/10.1016/j.ejor.2013.08.002
- Denis, L., Grzeskowiak, H., Trias, D., & Delaux, D. (2017). 1 - Accelerated life testing. In A. El Hami, D. Delaux, & H. Grzeskowiak (Eds.), Reliability of high-power mechatronic systems (Vol. 2, pp. 1–56). Elsevier.
- Emde, S., & Boysen, N. (2016). Berth allocation in container terminals that service feeder ships and deep-sea vessels. Journal of the Operational Research Society, 67(4), 551–563. https://doi.org/https://doi.org/10.1057/jors.2015.78
- Francesco, M. D., Fancello, G., Serra, P., & Zuddas, P. (2015). Optimal management of human resources in transhipment container ports. Maritime Policy & Management, 42(2), 127–144. https://doi.org/https://doi.org/10.1080/03088839.2013.870355
- Grodzevich, O., & Romanko, O. (2006). Normalization and other topics in multi-objective optimization. Study Group Report.
- Ho, J. C., Tseng, T.-L B., Ruiz-Torres, A. J., & López, F. J. (2009). Minimizing the normalized sum of square for workload deviations on m parallel processors. Computers & Industrial Engineering, 56(1), 186–192. https://doi.org/https://doi.org/10.1016/j.cie.2008.05.003
- Iris, A., & Lam, J. S. L. (2019). Recoverable robustness in weekly berth and quay crane planning. Transportation Research Part B: Methodological, 122, 365–389. https://doi.org/https://doi.org/10.1016/j.trb.2019.02.013
- Kim, K. H., Kim, K. W., Hwang, H., & Ko, C. S. (2004). Operator-scheduling using a constraint satisfaction technique in port container terminals. Computers & Industrial Engineering, 46(2), 373–381. https://doi.org/https://doi.org/10.1016/j.cie.2003.12.017
- Ladier, A.-L. (2014). Scheduling cross-docking operations: Integration of operational uncertainties and resource capacities. PhD thesis, Université de Grenoble.
- Legato, P., & Monaco, M. (2004). Human resources management at a marine container terminal. European Journal of Operational Research, 156(3), 769–781. https://doi.org/https://doi.org/10.1016/S0377-2217(03)00134-6
- Lim, A., Rodrigues, B., & Song, L. (2004). Manpower allocation with time windows. Journal of the Operational Research Society, 55(11), 1178–1186. https://doi.org/https://doi.org/10.1057/palgrave.jors.2601782
- Liu, C., Zheng, L., & Zhang, C. (2016). Behavior perception-based disruption models for berth allocation and quay crane assignment problems. Computers & Industrial Engineering, 97, 258–275. https://doi.org/https://doi.org/10.1016/j.cie.2016.04.008
- Li, W., Wu, Y., & Goh, M. (2015). Maritime terminal operational problems. In W. Li, Y. Wu, & M. Goh (Eds.), Planning and scheduling for maritime container yards: Supporting and facilitating the global supply network (pp. 5–29). Springer International Publishing.
- Li, X., Zhu, L., Baki, F., & Chaouch, A. B. (2018). Tabu search and iterated local search for the cyclic bottleneck assignment problem. Computers & Operations Research, 96, 120–130. https://doi.org/https://doi.org/10.1016/j.cor.2018.04.004
- Li, P., Yang, Y., Du, X., Qu, X., Wang, K., & Liu, B. (2017). Iterated local search for distributed multiple assembly no-wait flowshop scheduling. 2017 IEEE Congress on Evolutionary Computation (CEC), pp. 1565–1571.
- Lourenço, H. R., Martin, O. C., & Stützle, T. (2010). Iterated local search: Framework and applications (pp. 363–397). Springer US.
- Lu, Y., Huang, Y., & Yang, B. (2016). The integrated optimization of quay crane-yard truck scheduling in the container terminal with uncertain factors. International Journal of Hybrid Information Technology, 9(2), 163–176. https://doi.org/https://doi.org/10.14257/ijhit.2016.9.2.14
- Nguyen, D. T., Dijoux, Y., & Fouladirad, M. (2017). Analytical properties of an imperfect repair model and application in preventive maintenance scheduling. European Journal of Operational Research, 256(2), 439–453. https://doi.org/https://doi.org/10.1016/j.ejor.2016.06.026
- Popović, V. (2015). Operator scheduling using min-conflicts and tabu search based heuristic in container terminals. 2nd Logistics International Conference.
- Schepler, X., Absi, N., Feillet, D., & Sanlaville, E. (2019). The stochastic discrete berth allocation problem. EURO Journal on Transportation and Logistics, 8(4), 363–396. https://doi.org/https://doi.org/10.1007/s13676-018-0128-9
- Schulz, S., Neufeld, J. S., & Buscher, U. (2019). A multi-objective iterated local search algorithm for comprehensive energy-aware hybrid flow shop scheduling. Journal of Cleaner Production, 224, 421–434. https://doi.org/https://doi.org/10.1016/j.jclepro.2019.03.155
- Schwerdfeger, S., & Walter, R. (2018). Improved algorithms to minimize workload balancing criteria on identical parallel machines. Computers & Operations Research, 93, 123–134. https://doi.org/https://doi.org/10.1016/j.cor.2018.01.018
- Serra, P., Fadda, P., & Fancello, G. (2016). Evaluation of alternative scenarios of labour flexibility for dockworkers in maritime container terminals. Maritime Policy & Management, 43(3), 371–385. https://doi.org/https://doi.org/10.1080/03088839.2015.1043752
- Shang, X. T., Cao, J. X., & Ren, J. (2016). A robust optimization approach to the integrated berth allocation and quay crane assignment problem. Transportation Research Part E: Logistics and Transportation Review, 94, 44–65. https://doi.org/https://doi.org/10.1016/j.tre.2016.06.011
- Song, Y., Zhang, J., Liu, M., & Chu, C. (2019). The berth allocation optimisation with the consideration of time-varying water depths. International Journal of Production Research, 57(2), 488–516. https://doi.org/https://doi.org/10.1080/00207543.2018.1449975
- Stahlbock, R., & Voß, S. (2007). Operations research at container terminals: A literature update. OR Spectrum, 30(1), 1–52. https://doi.org/https://doi.org/10.1007/s00291-007-0100-9
- Steenken, D., Voß, S. & Stahlbock, R. (2004). Container terminal operation and operations research - A classification and literature review. OR Spectrum, 26, 3–49. https://doi.org/https://doi.org/10.1007/s00291-003-0157-z
- Stützle, T. (2006). Iterated local search for the quadratic assignment problem. European Journal of Operational Research, 174(3), 1519–1539. https://doi.org/https://doi.org/10.1016/j.ejor.2005.01.066
- Stützle, T., & Ruiz, R. (2017). Iterated local search. In R. Martí, P. Panos, & M. G. C. Resende (Eds.), Handbook of heuristics (pp. 1–27). Springer International Publishing.
- Subramanian, A., Battarra, M., & Potts, C. N. (2014). An Iterated Local Search heuristic for the single machine total weighted tardiness scheduling problem with sequence-dependent setup times. International Journal of Production Research, 52(9), 2729–2742. https://doi.org/https://doi.org/10.1080/00207543.2014.883472
- Thomasson, O., Battarra, M., Erdoğan, G., & Laporte, G. (2018). Scheduling twin robots in a palletising problem. International Journal of Production Research, 56(1–2), 518–542. https://doi.org/https://doi.org/10.1080/00207543.2017.1401249
- UNCTAD. (2018). Review of maritime transport 2018. United Nations.
- Wang, S., Tomovic, M., & Liu, H. (2016). Chapter 3 - Comprehensive reliability design of aircraft hydraulic system. In S. Wang, M. Tomovic, & H. Liu (Eds.), Commercial aircraft hydraulic systems, aerospace engineering (pp. 115–169). Academic Press.
- Xu, J., Liu, S.-C., Zhao, C., Wu, J., Lin, W.-C., & Yu, P.-W. (2019). An iterated local search and tabu search for two-parallel machine scheduling problem to minimize the maximum total completion time. Journal of Information and Optimization Sciences, 40(3), 751–766. https://doi.org/https://doi.org/10.1080/02522667.2018.1468610
- Xu, J., Wu, C.-C., Yin, Y., & Lin, W.-C. (2017). An iterated local search for the multi-objective permutation flowshop scheduling problem with sequence-dependent setup times. Applied Soft Computing, 52, 39–47. https://doi.org/https://doi.org/10.1016/j.asoc.2016.11.031
- Zampelli, S., Vergados, Y., Van Schaeren, R., Dullaert, W., & Raa, B. (2013). The berth allocation and quay crane assignment problem using a CP approach. In C. Schulte (Ed.), Principles and practice of constraint programming, Lecture notes in computer science (pp. 880–896). Springer.
- Zheng, F., Li, Y., Chu, F., Liu, M., & Xu, Y. (2019a). Integrated berth allocation and quay crane assignment with maintenance activities. International Journal of Production Research, 57(11), 3478–3503. https://doi.org/https://doi.org/10.1080/00207543.2018.1539265
- Zheng, F., Man, X., Chu, F., Liu, M., & Chu, C. (2019b). A two-stage stochastic programming for single yard crane scheduling with uncertain release times of retrieval tasks. International Journal of Production Research, 57(13), 4132–4147. https://doi.org/https://doi.org/10.1080/00207543.2018.1516903