75
Views
2
CrossRef citations to date
0
Altmetric
Original Articles

Economic design of multiple inspection plans via the expectation-maximization algorithm

Pages 762-776 | Received 05 May 2020, Accepted 21 Feb 2022, Published online: 30 Mar 2022

References

  • Aslam, M., Balamurali, S., & Jun, C.-H. (2021). A new multiple dependent state sampling plan based on the process capability index. Communications in Statistics–Simulation and Computation, 50(6), 1711–1727. https://doi.org/10.1080/03610918.2019.1588307
  • Aslam, M., Wang, F.-K., Khan, N., & Jun, C.-H. (2018). A multiple dependent state repetitive sampling plans for linear profiles. Journal of the Operational Research Society, 69(3), 467–473. https://doi.org/10.1057/s41274-017-0227-2
  • Avinadav, T., & Raz, T. (2003). Economic optimization in a fixed sequence of unreliable inspections. Journal of the Operational Research Society, 54(6), 605–613. https://doi.org/10.1057/palgrave.jors.2601543
  • Bonett, D. G., & Woodward, A. A. (1994). Sequential defect removal sampling. Management Science, 40(7), 898–945. https://doi.org/10.1287/mnsc.40.7.898
  • Brooks, S. P. (1998). Markov chain Monte Carlo method and its application. Journal of the Royal Statistical Society: Series D (the Statistician), 47(1), 69–100. https://doi.org/10.1111/1467-9884.00117
  • Christer, A. H. (1994). Modelling the quality of automatic quality checks. Journal of the Operational Research Society, 45(7), 806–816. https://doi.org/10.1057/jors.1994.124
  • Chun, Y. H. (2005). Serial inspection plan in the presence of inspection errors: Maximum likelihood and maximum entropy approaches. Quality Engineering, 17(4), 627–632. https://doi.org/10.1080/08982110500225463
  • Chun, Y. H. (2008a). Bayesian analysis of the sequential inspection plan via the Gibbs sampler. Operations Research, 56(1), 235–246. https://doi.org/10.1287/opre.1070.0501
  • Chun, Y. H. (2008b). Economic optimization of off-line inspection procedures with inspection errors. Journal of the Operational Research Society, 59(6), 863–870. https://doi.org/10.1057/palgrave.jors.2602547
  • Chun, Y. H. (2009). Improving product quality by multiple inspections: Prior and posterior planning of serial inspection procedures. IIE Transactions, 41(9), 831–842. https://doi.org/10.1080/07408170802389324
  • Chun, Y. H. (2016a). Designing repetitive screening procedures with imperfect inspections: An empirical Bayes approach. European Journal of Operational Research, 253(3), 639–647. https://doi.org/10.1016/j.ejor.2016.03.003
  • Chun, Y. H. (2016b). Improved method of estimating the product quality after multiple inspections. International Journal of Production Research, 54(19), 5686–5696. https://doi.org/10.1080/00207543.2015.1128128
  • Chun, Y. H. (2020). Information economics approach to the performance evaluation of error-prone internal auditors. Journal of the Operational Research Society, 71(2), 264–279. https://doi.org/10.1080/01605682.2018.1516176
  • Chun, Y. H., & Joo, S.-J. (2021). Repetitive inspection scheme based on the run length of test results, a Markov chain Monte Carlo approach. Quality Engineering, 33(1), 113–127. https://doi.org/10.1080/08982112.2020.1777427
  • Chun, Y. H., & Sumichrast, R. T. (2007). Bayesian inspection model with the negative binomial prior in the presence of inspection errors. European Journal of Operational Research, 182(3), 1188–1202. https://doi.org/10.1016/j.ejor.2006.09.081
  • Dempster, A. P., Laird, N. M., & Rubin, D. B. (1977). Maximum likelihood from incomplete data via the EM algorithm. Journal of the Royal Statistical Society - Series B, 39(1), 1–38.
  • Ding, J., & Gong, L. (2008). The effect of testing equipment shift on optimal decisions in a repetitive testing process. European Journal of Operational Research, 186(1), 330–350. https://doi.org/10.1016/j.ejor.2007.01.024
  • Ding, J., Greenberg, B. S., & Matsuo, H. (1998). Repetitive testing strategies when the testing process is imperfect. Management Science, 44(10), 1367–1378. https://doi.org/10.1287/mnsc.44.10.1367
  • Duffuaa, S. O., & Khan, M. (2008). A general repeat inspection plan for dependent multicharacteristic critical components. European Journal of Operational Research, 191(2), 374–385. https://doi.org/10.1016/j.ejor.2007.02.033
  • Elshafei, M., Khan, M., & Duffuaa, S. O. (2006). Repeat inspection planning using dynamic programming. International Journal of Production Research, 44(2), 257–270. https://doi.org/10.1080/13528160500245749
  • Fallah Nezhad, M. S., & Zahmatkesh Saredorahi, F. (2018). Designing an economically optimal repetitive group-sampling plan based on loss functions. Communications in Statistics - Simulation and Computation, 47(3), 783–799. https://doi.org/10.1080/03610918.2017.1291964
  • Gasparini, M., Nusser, H., & Eisele, J. (2004). Repeated screening with inspection error and no false positive results with application to pharmaceutical pill production. Applied Statistics, 53, 51–62.
  • Gong, L. (2012). The effect of testing errors on a repetitive testing process. European Journal of Operational Research, 220(1), 115–124. https://doi.org/10.1016/j.ejor.2012.01.003
  • Greenberg, B. S., & Stokes, S. L. (1995). Repetitive testing in the presence of inspection errors. Technometrics, 37(1), 102–111. https://doi.org/10.1080/00401706.1995.10485893
  • Gupta, M. R., & Chen, Y. (2010). Theory and use of the EM algorithm. Foundations and Trends® in Signal Processing, 4(3), 223–296. https://doi.org/10.1561/2000000034
  • Lindsay, B. G. (1985). Errors in inspection: Integer parameter maximum likelihood in a finite population. Journal of the American Statistical Association, 80(392), 879–885. https://doi.org/10.1080/01621459.1985.10478197
  • Maleyeff, J., Kaminsky, F. C., & Farris, J. P. (2003). Minimum cost 100% inspection systems with inspection error. Quality Engineering, 15(4), 557–563. https://doi.org/10.1081/QEN-120018388
  • Moon, T. K. (1996). The expectation-maximization algorithm. IEEE Signal Processing Magazine, 13(6), 47–60. https://doi.org/10.1109/79.543975
  • Ng, V. M. (1989). On an estimation problem in multiple inspections. Journal of the Royal Statistical Society - Series D, 38(4), 217–219. https://doi.org/10.2307/2349054
  • Quinino, R. C., & Ho, L. L. (2004). Repetitive tests as an economic alternative procedure to control attributes with diagnosis errors. European Journal of Operational Research, 155(1), 209–225. https://doi.org/10.1016/S0377-2217(02)00857-3
  • Quinino, R. C., Ho, L. L., & Trindade, A. L. G. (2005). Bayesian judgment of a dichotomous inspection system when the true state of an evaluated item is unknown. Computers & Industrial Engineering, 49(4), 591–599. https://doi.org/10.1016/j.cie.2005.07.006
  • Rallis, N. E., & Lansdowne, Z. F. (2001). Reliability estimation for a software system with sequential independent reviews. IEEE Transactions on Software Engineering, 27(12), 1057–1061. https://doi.org/10.1109/32.988707
  • Unluyurt, T. (2004). Sequential testing of complex systems: A review. Discrete Applied Mathematics, 142, 189–205.
  • Vander Wiel, S. A., & Vardeman, S. B. (1994). A discussion of all-or-none inspection policies. Technometrics, 36(1), 102–109. https://doi.org/10.1080/00401706.1994.10485405
  • Vos, H. J. (2010). Sequential testing. In P. Peterson, E. Baker, & B. McGaw (Eds.), International encyclopedia of education. Elsevier. 401–406.
  • Wald, A. (1945). Sequential tests of statistical hypotheses. The Annals of Mathematical Statistics, 16(2), 117–186. https://doi.org/10.1214/aoms/1177731118
  • Xu, J.-L., Fagerstrom, R. M., Prorok, P., & Kramer, B. S. (2004). Estimating the cumulative risk of a false-positive test in a repeated screening program. Biometrics, 60(3), 651–660. https://doi.org/10.1111/j.0006-341X.2004.00214.x

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.