5
Views
0
CrossRef citations to date
0
Altmetric
Original Articles

Constrained Optimal Production Lot Sizes for Several Products

, , &
Pages 199-228 | Published online: 14 Aug 2013

  • BoctorF.F. (1982). The two-product, single machine, static demand, infinite horizon lot scheduling problem. Management Science, 28, 798–807.
  • CookW.D., SaipeA.L., and SeifordL.M. (1980). Production runs for multiple products: the full-capacity heuristic. Journal of the Operational Research Society, 31, 405–412.
  • DelporteC.M. and ThomasL.J. (1977). Lot sizing and sequencing for N products on one facility. Management Science, 23, 1070–1079.
  • ElmaghrabyS.E. (1978). The economic lot scheduling problem (ELSP): review and extensions. Management Science, 24, 587–598.
  • GoyalS.K. (1984). Determination of economic production quantities for a two product single machine system. International Journal of Production Research, 22, 121–126.
  • HaesslerR. and HogueS.L. (1976). A note on the single machine multi-product lot size scheduling. Management Science, 22, 909–912.
  • HartleyR. and ThomasL.C. (1982). The deterministic, two-product inventory system with capacity constraint. Journal of the Operational Research Society, 23, 1013–1020.
  • HsuW.L. (1983). On the general feasibility test of scheduling lot sizes for several products on one machine. Management Science, 29, 93–105.
  • ParkK.S. and YunD.K. (1984). A stepwise partial enumeration algorithm for the economic lot scheduling problem. IIE Transactions, 16, 363–370.
  • ParkK.S. and YunD.K. (1985). Optimal scheduling of periodic activities. Operations Research, 33, 690–695.
  • SaipeA.L. (1977). Production runs for multiple products: the two product heuristic. Management Science, 23, 1321–1327.
  • VemugantiR.R. (1976). On the feasibility of scheduling lot sizes for several products on one machine. Technical Report. University of Baltimore.
  • VemugantiR.R. (1978). On the feasibility of scheduling lot sizes for two products on one machine. Management Science, 34, 1668–1673.
  • VemugantiR.R. and DianichD.F. (1984). The maximum inventory levels in production lot size systems. Technical Report. University of Baltimore.
  • VemugantiR.R. (1986). The maximum value of inventory and shortages in production lot size systems. IIE Transactions, to appear.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.