References
- Baziw.J. and Scherer, Ch.R. “Wastewater Treatment Capacity Expansion with Time-Varying Assimilative Constraints”, Water Resources Res.,V.15, pp. 219–227, 1979.
- Benayoun.B. et al.“Linear Programming with Multiple Objective Functions: Step Method (STEM;”, Mathematical Programming, V.1, pp. 366–375, 1971.
- Despontin, M. “Some Reflections on STEM-Type Interactive Methods”, 9th Triennial Conf.dn Operational Res.-IFORS’81.Hamburg, July 1981.
- Mulvihill.M.E. and Dracup.J.A. “Optimal Timing and Sizing of a Conjunctive Urban Water Supply and Wastewater System with Nonlinear Programming”, Water Resources Res.,V.10,pp, 170175, 1974.
- Kausser,G.C. and Willis,C.E. “Investment Sequencing Allocation and Learning in the Design of Water Resources Systems: An Empirical Application”, Water Resources Res.,V.12, PP.317–330, 1976.
- Siowiriski,R. “Modelling of Preferences in Multicriteria Decision Problems”, Fasc.Tech. Univ. of Silesia, V.67, pp.95–111, 1983.
- Slowinski.R. Urbaniak.A. and Weglarz,J. “Bicriterion Capacity Expansion Planning of a Water Supply System”, Methods of iterations Research, V.46, pp.735–744, 1984.
- Thampapillai.D.J. and Sinden, J.A. “Tradeoffs for Multiple objective Planning Through Linear Programming”, Water Resources Res. V.15, pp.1028–1034, 1979.