27,778
Views
101
CrossRef citations to date
0
Altmetric
Articles

Cooperative filling approaches for the Grand Ethiopian Renaissance Dam

, , , , , , , & show all
Pages 611-634 | Received 11 Dec 2015, Accepted 01 Apr 2016, Published online: 11 May 2016

References

  • Arjoon, D., Mohamed, Y., Goor, Q., & Tilmant, A. (2014). Hydro-economic risk assessment in the eastern Nile River basin. Water Resources and Economics, 8, 16–31. doi:10.1016/j.wre.2014.10.004
  • Bates, A., Tuncok, K., Barbour, T., & Klimpt, J.-É. (2013). First joint multipurpose program identification: Strategic perspectives and options assessment on the Blue Nile multipurpose development - Working Paper 2. Addis Ababa: Author Report to Nile Basin Initiative.
  • Beyene, A. (2013). Reflections on the Grand Ethiopian Renaissance Dam. Retrieved April 2, 2016, from http://www.opride.com/oromsis/news/horn-of-africa/3664-reflections-on-the-grand-ethiopian-renaissance-dam
  • Blackmore, D., & Whittington, D. (2008). Opportunities for cooperative water resources development on the eastern Nile: Risks and rewards, Final Report - An Independent Report of the Scoping Study Team to the Eastern Nile Council of Ministers. Washington, DC: World Bank.
  • Block, P. J., & Strzepek, K. (2010). Economic analysis of large-scale upstream river basin development on the Blue Nile in Ethiopia considering transient conditions, climate variability, and climate change. Journal of Water Resources Planning and Management, 136(2), 156–166. doi:10.1061/(ASCE)WR.1943-5452.0000022
  • Brown, C. M., Lund, J. R., Cai, X., Reed, P. M., Zagona, E. A., Ostfeld, A., … Brekke, L. (2015). The future of water resources systems analysis: Toward a scientific framework for sustainable water management. Water Resources Research, 51(8), 6110–6124. doi:10.1002/2015WR017114
  • Carron, J., Parkin, G., O’Donnell, G. M., & O’Connell, P. E. (2011). NBI water resources planning and management project, Nile Basin Decision Support System (DSS): Data processing and quality assurance, pilot application of the Nile Basin decision support system: Stage 1 - Development of pilot case models. Boulder: Author Report to Nile Basin Initiative.
  • Cash, D. W., Clark, W. C., Alcock, F., Dickson, N. M., Eckley, N., Guston, D. H., … Mitchell, R. B. (2003). Knowledge systems for sustainable development. Proceedings of the National Academy of Sciences, 100(14), 8086–8091. doi:10.1073/pnas.1231332100
  • Craig, G. M. (1991). The agriculture of the Sudan. Oxford: Oxford University Press.
  • DoP. (2015). Agreement on declaration of principles between the Arab Republic of Egypt, the Federal Democratic Republic of Ethiopia and the Republic of the Sudan on the Grand Ethiopian Renaissance Dam Project (GERDP). Khartoum: State Information Service.
  • EDF, & Scott Wilson. (2007). Eastern Nile power trade program study: Pre-feasibility study of border hydropower project, Ethiopia. Addis Ababa: Author report to Nile Basin Initiative.
  • Egypt MWRI. (2005). Water for the future: National water resources plan for Egypt - 2017. Cairo: Ministry of Water Resources and Irrigation.
  • Egyptian Chronicles. (2013). Group of the Nile Basin: Cairo University’s report on Ethiopia’s Great Renaissance Dam. Retrieved April 2, 2016, from http://egyptianchronicles.blogspot.com/2013/06/cairo-universitys-report-on-ethiopias.html
  • ENTRO. (2013). Eastern Nile planning model - Analytical and modeling tools [CD-ROM] Nile Cooperation for Results (NCORE) workshop. Eastern Nile Technical Regional Office, Addis Ababa: Nile Basin Initiative.
  • Ethiopian NPoE. (2013). Unwarranted anxiety. The Grand Ethiopian Renaissance Dam (GERD) and some Egyptian experts hyperbole. Retrieved April 4, 2016, from http://www.mowr.gov.et/index.php?pagenum=0.1&ContentID=88
  • Guariso, G., & Whittington, D. (1987). Implications of ethiopian water development for Egypt and Sudan. International Journal of Water Resources Development, 3(2), 105–114. doi:10.1080/07900628708722338
  • Hassan, A. (2012). Eastern Nile Planning Model (ENPM) project: Water balance model for the Eastern Nile Basin. Dhaka: Author report to Nile Basin Initiative.
  • Hurst, H. E., Black, R. P., & Simaika, Y. M. (1965). Long-term storage: An experimental study. London: Constable.
  • IPoE. (2013). International panel of experts on the Grand Ethiopian Renaissance Dam project final report. Addis Ababa: Author.
  • Jeuland, M. (2010). Economic implications of climate change for infrastructure planning in transboundary water systems: An example from the Blue Nile. Water Resources Research, 46(11), W11556. doi:10.1029/2010WR009428
  • Jeuland, M., & Whittington, D. (2014). Water resources planning under climate change: Assessing the robustness of real options for the Blue Nile. Water Resources Research, 50(3), 2086–2107. doi:10.1002/2013WR013705
  • Jonker, V., Beuster, H., Sparks, A., Dobinson, L., Mullins, D., Palmer, R., … Tuncok, K. (2012). Data compilation and pilot application of the Nile Basin Decision Support System (NB-DSS): Scenario analysis report: Work package 2: Stage 2 scenario analysis report: Integrated Nile Basin (Report No. 7327/107486). Cape Town: Author Report to Nile Basin Initiative.
  • King, A., & Block, P. (2014). An assessment of reservoir filling policies for the Grand Ethiopian Renaissance Dam. Journal of Water and Climate Change, 5(2), 233–243. doi:10.2166/wcc.2014.043
  • Lahmeyer International. (2005). Feasible study for the merowe irrigation project. Khartoum: Author report to Republic of Sudan Dams Implementation Unit.
  • McCartney, M. P., & Girma, M. M. (2012). Evaluating the downstream implications of planned water resource development in the Ethiopian portion of the Blue Nile River. Water International, 37(4), 362–379. doi:10.1080/02508060.2012.706384
  • Milly, P. C. D., Betancourt, J., Falkenmark, M., Hirsch, R. M., Kundzewicz, Z. W., Lettenmaier, D. P., & Stouffer, R. J. (2008). Climate change: stationarity is dead: Whither water management? Science, 319(5863), 573–574. doi:10.1126/science.1151915
  • MIT. (2014). The Grand Ethiopian Renaissance Dam: An opportunity for collaboration and shared benefits in the Eastern Nile Basin: An amicus brief to the Riparian Nations of Ethiopia, Sudan and Egypt from the international, non-partisan Eastern Nile working group. Boston: Massachusetts Institute of Technology.
  • Moriasi, D. N., Arnold, J. G., Van Liew, M. W., Bingner, R. L., Harmel, R. D., & Veith, T. L. (2007). Model evaluation guidelines for systematic quantification of accuracy in watershed simulations. Transactions of the American Society of Agricultural and Biological Engineers, 50(3), 885–900. doi:10.13031/2013.23153
  • Mulat, A. G., & Moges, S. A. (2014). Assessment of the impact of the Grand Ethiopian Renaissance Dam on the performance of the High Aswan Dam. Journal of Water Resource and Protection, 06(6), 583–598. doi:10.4236/jwarp.2014.66057
  • NBI. (2012). State of the river Nile Basin 2012. Entebbe: Nile Basin Initiative.
  • NBI. (2014). Nile Basin decision support system DSS: Modeling tools training module. Entebbe: Nile Basin Initiative.
  • Nile Control Staff. (1933-Present). Nile encyclopedia [Data set]. Retrieved August 2014, from Nile Basin Initiative.
  • Nile Treaty. (1959). Agreement between the Arab Republic of Egypt and the Republic of the Sudan for the full utilization of the Nile waters (p. 453). United Nations Treaty Series 64 1963.Retrieved from http://www.fao.org/docrep/w7414b/w7414b00.htm
  • Olsson, J. A., & Andersson, L. (2007). Possibilities and problems with the use of models as a communication tool in water resource management. Water Resources Management, 21(1), 97–110. doi:10.1007/s11269-006-9043-1
  • Ouarda, T. B. M. J., Labadie, J. W., & Fontane, D. G. (1997). Indexed sequential hydrologic modeling for hydropower capacity estimation. Journal of the American Water Resources Association, 33(6), 1337–1349. doi:10.1111/j.1752-1688.1997.tb03557.x
  • PB Power. (2003). Building of electricity sector database and long-term power system planning study, interim report 3. Newcastle: Author report to National Electricity Corporation of Sudan.
  • Sadoff, C. W., & Grey, D. (2005). Cooperation on international rivers: A continuum for securing and sharing benefits. Water International, 30(4), 420–427. doi:10.1080/02508060508691886
  • Salini Costructtori. (2006). Beles multipurpose project level 1 design general report. Rome: Author report to Ethiopian Electric Power Corporation.
  • Salman, S. M. A. (2016). The Grand Ethiopian Renaissance Dam: the road to the declaration of principles and the Khartoum document. Water International. doi:10.1080/02508060.2016.1170374
  • SMEC International. (2012). Rosaries Dam Heightening Project (RDHP) reservoir operation study - revision 1 - draft. Dar es Salaam: Author report to Republic of Sudan Dams Implementation Unit.
  • Strzepek, K. M., Yohe, G. W., Tol, R. S. J., & Rosegrant, M. W. (2008). The value of the high Aswan Dam to the Egyptian economy. Ecological Economics, 66(1), 117–126. doi:10.1016/j.ecolecon.2007.08.019
  • Sudan MoIHP. (1968). Regulation rules for the working of the reservoirs at Rosaries and Sennar. Khartoum: Ministry of Irrigation and Hydro-Electric Power.
  • Sudan MoWE. (2015). Gaging stations of the Blue Nile, White Nile, Main Nile, Upper Atbara, South of Sudan, Rahad and Dinder [Data set]. Retrieved September 3, 2014.
  • Sutcliffe, J., & Parks, Y. (1999). The hydrology of the Nile. Wallingford: IAHS Press.
  • Tawfik, R. (2016). The Grand Ethiopian Renaissance Dam: a benefit-sharing project in the Eastern Nile? Water International, 1–19. doi:10.1080/02508060.2016.1170397
  • Tvedt, T. (2004). The river Nile in the age of the British: Political ecology and the quest for economic power. London: I.B.Tauris & Co. Ltd.
  • United States of America and United Mexican States. (2012). Minute 319 of the utilization of waters of the Colorado and Jijuana rivers and of the Rio Grande, treaty between the United States of America and Mexico. Washington, DC: Government Printing Office.
  • USBR. (1964). Land and water resources of the Blue Nile Basin: Ethiopia: Main report and Appendices I–V. Washington, DC: US Government Printing Office.
  • van der Krogt, W., & Ogink, H. (2013). Development of the Eastern Nile water simulation model (Report No. 1206020-000-VEB-0010). Delft: Author report to Nile Basin Initiative.
  • Wheeler, K., & Setzer, S. (2012). Eastern Nile RiverWare planning model. Addis Ababa: Author report to Nile Basin Initiative.
  • Whittington, D., Waterbury, J., & Jeuland, M. (2014). The Grand Renaissance Dam and prospects for cooperation on the Eastern Nile. Water Policy, 16(4), 595–608. doi:10.2166/wp.2014.011
  • Yao, H., & Georgakakos, A. P. (2003). The Nile decision support tool, river simulation and management (Report No. GCP/INT/752/ITA). Atlanta: Georgia Institute of Technology.
  • Yates, D., Sieber, J., Purkey, D., & Huber-Lee, A. (2005). WEAP21—A demand-, priority-, and preference-driven water planning model. Water International, 30(4), 487–500. doi:10.1080/02508060508691893
  • Yihdego, Z. (in press). The fairness of sharing Blue Nile waters: The GERD’s case. Water International.
  • Zagona, E. A., Fulp, T. J., Shane, R., Magee, T., & Goranflo, H. M. (2001). RiverWare: A generalized tool for complex reservoir systems modeling. Journal of the American Water Resources Association, 37(4), 913–929. doi:10.1111/j.1752-1688.2001.tb05522.x
  • Zhang, Y., Block, P., Hammond, M., & King, A. (2015). Ethiopia’s Grand Renaissance Dam: Implications for downstream riparian countries. Journal of Water Resources Planning and Management. doi:10.1061/(ASCE)WR.1943-5452.0000520