17
Views
0
CrossRef citations to date
0
Altmetric
Articles

The integrated supply chain model considering process mean, replenishment cycle time and credit period

&
Pages 823-833 | Received 01 Mar 2020, Published online: 17 Nov 2020

References

  • Dajmaludim, V. D., Murthy, N. P., and Wilson, R. J., 1994. Quality control through lot sizing for items sold with warranty, International Journal of Production Economics, 33: 97-107. doi: 10.1016/0925-5273(94)90123-6
  • Yeh, R. H. and Lo, H. C., 1998. Quality control products under free-repair warranty, International Journal of Operations and Quantitative Management, 4: 265-275.
  • Yeh, R. H., Ho, W. T., and Tseng, S. T., 2000. Optimal production length for products sold with warranty, European Journal of Operational Research, 120: 575-582. doi: 10.1016/S0377-2217(99)00004-1
  • Wang, C. H. and Sheu, S. H., 2000. Fast approach to the optimal production/PM Policy, Computer and Mathematics with Applications, 40: 1297-1314. doi: 10.1016/S0898-1221(00)00240-6
  • Wang, C. H. and Sheu, S. H., 2003. Optimal lot sizing for products sold under free-repair warranty, European Journal of Operation Research, 49: 131-141. doi: 10.1016/S0377-2217(02)00429-0
  • Wang, C. H., 2004. The impact of a free-repair warranty policy on EMQ model for imperfect production systems, Computers & Operations Research, 31; 2021-2035. doi: 10.1016/S0305-0548(03)00161-8
  • Wang, C. H., 2006. Optimal production and maintenance policy for imperfect production systems, Naval Research Logistics, 53: 151-156. doi: 10.1002/nav.20124
  • Yeh, R. H. and Chen, T. H., 2206. Optimal lot size and inspection policy for products sold with warranty, European Journal of Operational Research, 174: 766-776. doi: 10.1016/j.ejor.2005.02.049
  • Mujahid, S. N. and Rahim, M. A., 2010. Optimal preventive maintenance warranty policy for repairable products with periodically increasing failure rate, International Journal of Operational Research, 9: 227-240. doi: 10.1504/IJOR.2010.035046
  • Rahim, M. A. and Fareeduddin, M., 2011. Optimal production run length for product sold with warranty in a deteriorating production system with a time varying defective rate under allowable shortages, International Journal of Industrial and Systems Engineering, 8: 298-325. doi: 10.1504/IJISE.2011.041540
  • Akram, M. A., Al-Saif, A. W., and Rahim, M. A., 2012. Rahim, Quality monitoring and process adjustment by integrating SPC and APC: A review, International Journal of Industrial and Systems Engineering, 11: 375-405. doi: 10.1504/IJISE.2012.047543
  • Sarkar, B., Sana, S. S., and Chaudhuri, K., 2010. Optimal reliability, production lot size and safety stock in an imperfect production system, International Journal of Mathematics in Operational Research, 2: 467-490. doi: 10.1504/IJMOR.2010.033441
  • Sana, S. S.. Goyal, S. K., and Chaudhuri, K., 2007. On a volume flexible inventory model for items with an imperfect production system, International Journal of Production Economics, 105: 64-80. doi: 10.1016/j.ijpe.2006.05.005
  • Sana, S. S., 2010. An economic production lot size model in an imperfect production system, European Journal of Operational Research, 201: 158-170. doi: 10.1016/j.ejor.2009.02.027
  • Lin, G. C. and Gong, D. C., 2018. A manufacturer-buyer model with random breakdowns, Proceeding of the Asia Pacific Industrial Engineering & Management Systems Conference, Hong Kong.
  • Chung, K. J., Cárdenas-Barrón, L. E., Liao, J. J., and Ting, P. S., 2018. The simplified solution procedures for solving replenishment lot size problem with discontinuous issuing policy and rework, Journal of Information and Optimization Sciences, 39: 1665-1672. doi: 10.1080/02522667.2017.1395148
  • Banu, A. and Mondal, S. K., 2018. an integrated inventory model with warranty dependent credit period under two policies of a manufacturer, Opsearch, 55: 677-702. doi: 10.1007/s12597-018-0345-x
  • Taguchi G., 2018, Introduction to Quality Engineering, Asian Productivity Organization, Tokyo.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.