References
- Ahuja, H. N., and V. Nandakumar. 1985. “Simulation Model to Forecast Project Completion Time.” Journal of Construction Engineering and Management 111 (4): 325–342. doi:10.1061/(ASCE)0733-9364(1985)111:4(325).
- Al-Gahtani, K. S. 2009. “Float Allocation Using the Total Risk Approach.” Journal of Construction Engineering and Management 135 (2): 88–95. doi:10.1061/(ASCE)0733-9364(2009)135:2(88).
- Al-Gahtani, K. S. 2010. Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and IT Solution. Saarbrücken: Lambert.
- Al-Gahtani, K. S., and S. B. Mohan. 2007. “Total Float Management for Delay Analysis.” Cost Engineering 49 (2): 32–37.
- Alkass, S., M. Mazerolle, and F. Harris. 1996. “Construction Delay Analysis Techniques.” Construction Management and Economics 14 (5): 375–394. doi:10.1080/014461996373250.
- Arditi, D., and T. Pattanakitchamroon. 2006. “Selecting a Delay Analysis Method in Resolving Construction Claims.” International Journal of Project Management 24 (2): 145–155. doi:10.1016/j.ijproman.2005.08.005.
- Bramble, B. B., and M. T. Callahan. 2000. Construction Delay Claims. 3rd ed. New York: Wiley Law.
- De La Garza, J. M., A. Prateapusanond, and N. Ambani. 2007. “Preallocation of Total Float in the Application of a Critical Path Method Based Construction Contract.” Journal of Construction Engineering and Management 133 (11): 836–845. doi:10.1061/(Asce)0733-9364(2007)133:11(836).
- De La Garza, J. M., M. C. Vorster, and C. M. Parvin. 1991. “Total Float Traded as Commodity.” Journal of Construction Engineering and Management 117 (4): 716–727. doi:10.1061/(ASCE)0733-9364(1991)117:4(716).
- Eggleston, B. 2009. Liquidated Damages and Extensions of Time in Construction Contracts. Ames: Wiley-Blackwell.
- Finke, M. R. 2000. “Schedule Density as a Tool for Pricing Compensable Float Consumption.” Cost Engineering 42 (6): 34–37.
- Gibson, R. 2008. Construction Delays: Extensions of Time and Prolongation Claims. London: Routledge.
- Gong, D., and R. Hugsted. 1993. “Time-uncertainty Analysis in Project Networks with a New Merge-event Time-estimation Technique.” International Journal of Project Management 11 (3): 165–173. doi:10.1016/0263-7863(93)90049-s.
- Gong, D., and J. E. Rowings Jr. 1995. “Calculation of Safe Float Use in Risk-analysis-oriented Network Scheduling.” International Journal of Project Management 13 (3): 187–194. doi:10.1016/0263-7863(94)00004-V.
- Hegazy, T., and K. Zhang. 2005. “Daily Windows Delay Analysis.” Journal of Construction Engineering and Management 131 (5): 505–512. doi:10.1061/(ASCE)0733-9364(2005)131:5(505).
- Householder, J. L., and H. E. Rutland. 1990. “Who Owns Float?” Journal of Construction Engineering and Management 116 (1): 130–133. doi:10.1061/(ASCE)0733-9364(1990)116:1(130).
- Ibbs, W., L. D. Nguyen, and L. Simonian. 2011. “Concurrent Delays and Apportionment of Damages.” Journal of Construction Engineering and Management 137 (2): 119–126. doi:10.1061/(ASCE)CO.1943-7862.0000259.
- Kao, C.-K., and J.-B. Yang. 2009. “Comparison of Windows-based Delay Analysis Methods.” International Journal of Project Management 27 (4): 408–418. doi:10.1016/j.ijproman.2008.05.016.
- Keane, P. J., and A. F. Caletka. 2008. Delay Analysis in Construction Contracts. Oxford: Wiley-Blackwell.10.1002/9781444301144
- Kraiem, Z. M., and J. E. Diekmann. 1987. “Concurrent Delays in Construction Projects.” Journal of Construction Engineering and Management 113 (4): 591–602. doi:10.1061/(ASCE)0733-9364(1987)113:4(591).
- Lifschitz, J., and M. A. Scott. 2005. “Who Owns the Float?” Construction Briefings 2005–2: 1–10.
- Mubarak, S. A. 2010. Construction Project Scheduling and Control. 2nd ed. Hoboken, NJ: Wiley.10.1002/9780470912171
- Ndekugri, I., N. Braimah, and R. Gameson. 2008. “Delay Analysis within Construction Contracting Organizations.” Journal of Construction Engineering and Management 134 (9): 692–700. doi:10.1061/(ASCE)0733-9364(2008)134:9(692).
- Nguyen, L. D., and W. Ibbs. 2008. “FLORA: New Forensic Schedule Analysis Technique.” Journal of Construction Engineering and Management 134 (7): 483–491. doi:10.1061/(ASCE)0733-9364(2008)134:7(483).
- Pasiphol, S., and C. M. Popescu. 1994. “Qualitative Criteria Combination for Total Float Distribution.” In 1994 AACE Transactions, 1994: DCL03.1-03.6. Morgantown, WV: AACE International.
- Pickavance, K. 2000. Delay and Disruption in Construction Contracts. 2nd ed. London: LLP.
- Sakka, Z. I., and S. M. El-Sayegh. 2007. “Float Consumption Impact on Cost and Schedule in the Construction Industry.” Journal of Construction Engineering and Management 133 (2): 124–130. doi:10.1061/(ASCE)0733-9364(2007)133:2(124).
- SCL. 2002. The Society of Construction Law: Delay and Disruption Protocol. Oxfordshire: Society of Construction Law.
- Tobin, P. 2007. “Concurrent and Sequential Causes of Delay.” The International Construction Law Review 24: 142–167.
- Wang, W.-C., and L. A. Demsetz. 2000. “Application Example for Evaluating Networks Considering Correlation.” Journal of Construction Engineering and Management 126 (6): 467–474. doi:10.1061/(ASCE)0733-9364(2000)126:6(467).
- Yang, J.-B., and C.-K. Kao. 2012. “Critical Path Effect Based Delay Analysis Method for Construction Projects.” International Journal of Project Management 30 (3): 385–397. doi:10.1016/j.ijproman.2011.06.003.