References
- Abujiya, M. R., M. H. Lee, and M. Riaz. 2014. “Improving the Performance of Exponentially Weighted Moving Average Control Charts.” Quality and Reliability Engineering International 30 (4): 571–590. doi:10.1002/qre.1509.
- Ahmad, S., S. A. Abbasi, M. Riaz, and N. Abbas. 2014. “On Efficient Use of Auxiliary Information for Control Charting in Spc.” Computers and Industrial Engineering 67: 173–184. doi:10.1016/j.cie.2013.11.004.
- Ali, S., and M. Riaz. 2014. “On the Generalized Process Capability under Simple and Mixture Models.” Journal of Applied Statistics 41 (4): 832–852. doi:10.1080/02664763.2013.856386.
- Boyles, R. A. 1991. “The Taguchi Capability Index.” Journal of Quality Technology 23: 17–26.
- Chan, L. K., S. W. Cheng, and F. A. Spiring. 1988. “A New Measure of Process Capability: Cpm.” Journal of Quality Technology 20 (3): 162–175.
- Chang, P. L., and K. H. Lu. 1994. “Pci Calculations for Any Shape of Distributions with Percentiles.” Quality World ( Technical section) 20: 110–114. London.
- Does, R. J. M. M., K. C. B. Roes, and A. Trip. 1999. Statistical Process Control in Industry. Dordrecht: Kluwer Academic.
- Greenwich, M., and B. L. Jahr-Schaffrath. 1995. “A Process Incapability Index.” International Journal of Quality and Reliability Management 12 (4): 58–71. doi:10.1108/02656719510087328.
- Juran, J. M., F. M. Gryna, and R. S. Bingham. 1979. Quality Control Handbook. New York: Mc Graw-Hill.
- Kane, V. E. 1986. “Process Capability Indices.” Journal of Quality Technology 18 (1): 41–52.
- Mehmood, R., M. Riaz, and R. J. M. M. Does. 2013. “Control Charts for Location Based on Different Sampling Schemes.” Journal of Applied Statistics 40 (3): 483–494. doi:10.1080/02664763.2012.740624.
- Montgomery, D. C. 2008. Introduction to Statistical Quality Control. 6th ed. New York: Wiley.
- Nazir, H. Z., M. Schoonhoven, M. Riaz, and R. J. M. M. Does. 2013. “Quality Quandaries: How to Set up a Robust Shewhart Control Chart for Dispersion?” Quality Engineering 26 (1): 130–136. doi:10.1080/08982112.2013.848367.
- Pearn, W. L., and K. S. Chen. 1995. “Estimating Process Capability Indices for Non-normal Pearson Populations.” Quality and Reliability Engineering International 11 (5): 386–388. doi:10.1002/qre.4680110510.
- Pearn, W. L., and K. S. Chen. 1997. “Capability Indices for Non-normal Distributions with an Application in Electrolytic Capacitor Manufacturing.” Microelectronics Reliability 37 (12): 1853–1858. doi:10.1016/S0026-2714(97)00023-1.
- Schneider, H., J. Pruett, and C. Lagrange. 1995. “Use of Process Capability Indices in the Supplier Certification Process.” Quality Engineering 8 (2): 225–235. doi:10.1080/08982119508904621.
- Spiring, F. A. 1991. “The Cpm Index.” Quality Progress 24 (2): 57–61.
- Spiring, F. 2011. “Exploring Process Capability with Mathematica.” Quality and Reliability Engineering International 27 (3): 369–387. doi:10.1002/qre.1112.
- Taguchi, G. 1985. A Tutorial on Quality and Assurance: The Taguchi Methods (Index). Las Vegas, NV: ASA Annual Meeting.
- Tong, L. I., and J. P. Chen. 1998. “Lower Confidence Limits of Process Capability Indices for Non-Normal Process Distributions.” International Journal of Quality and Reliability Management 15 (8–9): 907–919. doi:10.1108/02656719810199006.
- Vännman, K., and M. Albing. 2007. “Process Capability Indices for One-sided Specification Intervals and Skewed Distributions.” Quality and Reliability Engineering International 23 (6): 755–765. doi:10.1002/qre.877.
- Vännman, K., and N. F. Hubele. 2003. “Distributional Properties of Estimated Capability Indices Based on Subsamples.” Quality and Reliability Engineering International 19 (2): 111–128. doi:10.1002/qre.514.
- Yum, B. J., and K. W. Kim. 2011. “A Bibliography of the Literature on Process Capability Indices: 2000–2009.” Quality and Reliability Engineering International 27 (3): 251–268. doi:10.1002/qre.1115.
- Zwick, D. 1995. “A Hybrid Method for Fitting Distributions to Data and Its Use in Computing Process Capability Indices.” Quality Engineering 7 (3): 601–613. doi:10.1080/08982119508918806.