225
Views
0
CrossRef citations to date
0
Altmetric
Mechanical Engineering

Design and implementation of an extensive-process method for improving the processing efficiency and capacity of the production logistics system

, ORCID Icon, , , , , & show all
Pages 86-105 | Received 26 Mar 2022, Accepted 04 Oct 2022, Published online: 15 Nov 2022

References

  • Agrebi, I., M. Jemmali, H. Alquhayz, and T. Ladhari. 2021. “Metaheuristic Algorithms for the Two-Machine Flowshop Scheduling Problem with Release Dates and Blocking Constraint.” Journal of the Chinese Institute of Engineers 44 (6): 573–582. doi:10.1080/02533839.2021.1933600.
  • Al-Jabri, I. M. 2015. “Antecedents of User Satisfaction with ERP Systems: Mediation Analyses.” Kybernetes 44 (1): 107–123. doi:10.1108/K-05-2014-0101.
  • Chen, Y., G. X. Wu, and F. L. Lin. 2009. “Multi-Agent Modeling on Scheduling of Multi-Variety and Multi-Process Job-Shop.” Journal of Zhejiang University 43 (9): 1672–1678. doi:10.3785/j.1008-973X.2009.09.022.
  • Domagała, A., K. Grobler-Dębska, J. Wąs, and E. Kucharska. 2021. “Post-Implementation ERP Software Development: Upgrade or Reimplementation.” Applied Sciences 11 (11): 4937. doi:10.3390/app11114937.
  • Ehie, I. C., and M. Madsen. 2005. “Identifying Critical Issues in Enterprise Resource Planning (ERP) Implementation.” Computers in Industry 56 (6): 545–557. doi:10.1016/j.compind.2005.02.006.
  • Erkayman, B. 2018. “Transition to A JIT Production System through ERP Implementation: A Case from the Automotive Industry.” International Journal of Production Research 57 (17): 5467–5477. doi:10.1080/00207543.2018.1527048.
  • Folinas, D. K., and E. H. Daniel. 2012. “Estimating the Impact of ERP Systems on Logistics System.” International Journal of Enterprise Information Systems 8 (3): 1–14. doi:10.4018/jeis.2012070101.
  • Gong, D. C., P. H. Li, P. S. Chen, and F. Wang. 2020. “Supply Chain Network Design with Multi-Time-Period Stochastic Demands for Optimizing Dual Objectives on Economic and Environmental Factors.” Journal of the Chinese Institute of Engineers 43 (1): 93–100. doi:10.1080/02533839.2019.1676651.
  • Hao, G., and J. Zhang. 2018. “Design and Practice of the Competition Schedule Arrangement System of Swimming Sports Based on Artificial Intelligence.” Lecture Notes in Real-Time Intelligent System 613: 440–454. doi:10.1007/978-3-319-60744-3_48.
  • Islam, M. M., and M. Arakawa. 2021. “Rolling Planning Method for Two-Stage Logistics System under Unsteady Demand.” Journal of Advanced Mechanical Design Systems and Manufacturing 15 (3): 3. doi:10.1299/jamdsm.2021jamdsm0030.
  • Jia, X. L., Z. M. Zhang, X. T. Tian, and J. X. Xu. 2006. “The Research of Manufacturing Process Planning Data Management Adopts MBOM as Core.” Manufacturing Automation 5: 20–23.
  • Liu, M. Z., F. Cao, and L. Ren. 2004. “Study of Organization Model of Product-Oriented Process Data BOM.” Graphics 2: 21–26.
  • Liu, W. L., Y. J. Gong, W. N. Chen, Z. Q. Liu, H. Wang, and J. Zhang. 2020. “Coordinated Charging Scheduling of Electric Vehicles: A Mixed-Variable Differential Evolution Approach.” IEEE Transactions on Intelligent Transportation Systems 21 (12): 5094–5109. doi:10.1109/TITS.2019.2948596.
  • Liu, F., Z. D. Shan, M. P. Hou, and X. Y. Xu. 2011. “The Application of Sand-Mold Milling Technology in the Rapid Manufacturing of Automotive Parts.” In 2011 IEE International Conference on Advanced Manufacturing Technology 2011 (ATDM), Changzhou, China, 3-5 November 2011: 62–64. New York: IEEE.
  • Lou, P., S. K. Ong, and A. Y. C. Nee. 2010. “Agent-Based Distributed Scheduling for Virtual Job Shops.” International Journal of Production Research 48 (13): 3889–3910. doi:10.1080/00207540902927918.
  • Lyu, C., X. Ou, and X. Zhang. 2015. “China Automotive Energy Consumption and Greenhouse Gas Emissions Outlook to 2050.” Mitigation and Adaptation Strategies for Global Change 20 (5): 627–650. doi:10.1007/s11027-014-9620-1.
  • Mahar, F., S. I. Ali, A. K. Jumani, and M. O. Khan. 2020. “ERP System Implementation: Planning, Management, and Administrative Issues.” Indian Journal of Science and Technology 13 (1): 1–22. doi:10.17485/ijst/2020/v13i01/148982.
  • Matsumoto, S., N. Ueno, K. Okuhara, and H. Ishii. 2007. “Proposal of Load Leveling Model for Implementing Mass Customization in Automobile Industry.” Journal of Advanced Mechanical Design Systems and Manufacturing 1 (2): 194–204. doi:10.1299/jamdsm.1.194.
  • Muscatello, J. R., D. H. Parente, and M. Swinarski. 2016. “The Impact of ERP Alignment on Logistics Costs: A Work System Theoretical Approach.” International Journal of Enterprise Information Systems 12 (3): 1–17. doi:10.4018/IJEIS.2016070101.
  • O’Leary, D. E. 2002. “Knowledge Management across the Enterprise Resource Planning Systems Life Cycle.” International Journal of Accounting Information Systems 3 (2): 99–110. doi:10.1016/S1467-0895(02)00038-6.
  • Redondo, R., A. Herrero, E. Corchado, and J. Sedano. 2020. “A Decision-Making Tool Based on Exploratory Visualization for the Automotive Industry.” Applied Sciences 10 (12): 4355. doi:10.3390/app10124355.
  • Saniuk, S., D. Caganova, and A. Saniuk. 2021. “Knowledge and Skills of Industrial Employees and Managerial Staff for the Industry 4.0 Implementation.” Mobile Networks and Applications. doi:10.1007/s11036-021-01788-4.
  • Shimizu, Y., and D. Fatrias. 2013. “Daily Planning for Three Echelon Logistics considering Inventory Conditions.” Journal of Advanced Mechanical Design, Systems, and Manufacturing 7 (3): 3. doi:10.1299/jamdsm.7.485.
  • Su, Y. Y., L. J. Han, H. M. Wang, and J. N. Wang. 2022. “The Workshop Scheduling Problems Based on Data Mining and Particle Swarm Optimisation Algorithm in Machine Learning Areas.” Enterprise Information Systems 16 (2): 363–378. doi:10.1080/17517575.2019.1700551.
  • Tadayonirad, S., H. Seidgar, H. Fazlollahtabar, and R. Shafaei. 2019. “Robust Scheduling in Two-Stage Assembly Flow Shop Problem with Random Machine Breakdowns: Integrated Metaheuristic Algorithms and Simulation Approach.” Assembly Automation 39 (5): 944–962. doi:10.1108/aa-10-2018-0165.
  • Varadarajan, R. 2020. “Customer Information Resources Advantage, Marketing Strategy and Business Performance: A Market Resources Based View.” Industrial Marketing Management 89: 89–97. doi:10.1016/j.indmarman.2020.03.003.
  • Wu, Z. N. 2021. “Intelligent Logistics Based on the Internet of Things and Cloud Computing.” 2020 International Conference on Data Processing Techniques and Applications for Cyber-Physical Systems, Laibin, China, 11 December 2020: 1643–1651. Springer-Singapore.
  • Zhang, S. D., P. Gao, and Z. Y. Ge. 2013. “Factors Impacting End-Users’ Usage of ERP in China.” Kybernetes 42 (7): 1029–1043. doi:10.1108/K-11-2012-0099.
  • Zhang, K., T. Qu, Y. H. Zhang, R. Y. Zhong, and G. Huang. 2021. “Big Data-Enabled Intelligent Synchronisation for the Complex Production Logistics System under the Opti-State Control Strategy.” International Journal of Production Research 60 (13): 4159–4175. doi:10.1080/00207543.2021.2000657.
  • Zhang, J., F. Zhang, and L. Tu. 2018. “A Cloud Based Intelligent Logistics Planning System.” Algorithms and Networks (I-SPAN) 292–295. doi:10.1109/I-SPAN.2018.00056.
  • Zhao, F. Q., X. He, and L. Wang. 2021. “A Two-Stage Cooperative Evolutionary Algorithm with Problem-Specific Knowledge for Energy-Efficient Scheduling of No-Wait Flow-Shop Problem.” IEEE Transactions on Cybernetics 51 (11): 5291–5303. doi:10.1109/TCYB.2020.3025662.
  • Zhao, F., R. Ma, and L. Wang. 2021. “A Self-Learning Discrete Jaya Algorithm for Multiobjective Energy-Efficient Distributed No-Idle Flow-Shop Scheduling Problem in Heterogeneous Factory System.” IEEE Transactions on Cybernetics. doi:10.1109/TCYB.2021.3086181.
  • Zhao, F. Q., L. Zhao, L. Wang, and H. Song. 2020. “An Ensemble Discrete Differential Evolution for the Distributed Blocking Flowshop Scheduling with Minimizing Makespan Criterion.” Expert Systems with Applications 160: 113678. doi:10.1016/j.eswa.2020.113678.
  • Zhou, S., L. N. Xing, X. Zheng, N. Du, L. Wang, and Q. Zhang. 2021. “A Self-Adaptive Differential Evolution Algorithm for Scheduling A Single Batch-Processing Machine with Arbitrary Job Sizes and Release Times.” IEEE Transactions on Cybernetics 51 (3): 1430–1442. doi:10.1109/TCYB.2019.2939219.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.