RISK ANALYSIS IN CONSTRUCTION NETWORKS USING A MODIFIED STOCHASTIC ASSIGNMENT MODEL

, &
Pages 215-241 | Received 27 Sep 1999, Accepted 28 Jul 2000, Published online: 20 Sep 2007

References

  • Arsham , H. ( 1999 ). Stability analysis of the critical path in project activity networks , Civil Engineering and Environmental Systems , 15 , 305 – 334 .
  • Kelley , J. E. Jr. and Walker , M. R. , Critical path planning and scheduling , Proceedings of the Eastern Joint Computer Conference , Association for Computing Machinery , December , 1959 , pp. 160 – 173 .
  • O'Brien , J. ( 1984 ). CPM in construction management , McGraw-Hill Book Co. , New York .
  • Malcolm , D. G. , Roseboom , J. H. , Clark , C. E. and Fazar , W. ( 1959 ). Application of a technique for research and development program evaluation , Operations Research , 7 ( 5 ), 646 – 669 .
  • Fulkerson , D. R. ( 1962 ). Expected critical path lengths in PERT network , Operations Research , 10 , 808 – 817 .
  • MacCrimmon , K. R. and Ryavec , C. A. ( 1964 ). An analytical study of the PERT assumptions , Operations Research , 12 , 16 – 37 .
  • Hartley , H. O. and Wortham , A. W. ( 1966 ). A statistical theory for PERT critical path analysis , Management Science , 12 ( 10 ), pB469-B481 p.
  • Moder , J. J. and Rodgers , E. G. ( 1968 ). Judgement estimates of the moments of PERT type distributions , Management Science , 15 , pB76–83 p.
  • Ang , A. H.-S. , Abdelnour , J. and Chaker , A. A. , Analysis of activity networks under uncertainty , Journal of The Engineering Mechanics Division, Proceedings of the American Society of Civil Engineers , August , 1975 , 101 ( EM4 ), 373 – 387 .
  • Diaz , C. F. and Hadipriono , F. C. , Nondetenninistic networking methods , Journal of Construction Engineering and Management , 119 ( 1 ), March , 1993 , 40 – 57 .
  • Al-Sadek , O. and Carmichael , D. G. ( 1992 ). On simulation in planning networks , Civil Engineering Systems , 9 , 59 – 68 .
  • Ranasinghe , M. ( 1994 ). Quantification and management of uncertainty in activity duration networks , Construction Management and Economics , 12 ( 1 ), 15 – 29 .
  • Van Slyke , R. M. ( 1963 ). Monte Carlo methods and the PERT problem , Operations Research , 10 ( 5 ), 839 – 860 .
  • Maher , M. J. ( 1992 ). SAM - A stochastic assignment model , Mathematics in Transport Planning and Control , Griffiths, J. D. (Editor) , Clarendon Press , Oxford , pp. 121 – 132 .
  • Clark , C. E. ( 1961 ). The greatest of a finite set of random variables , Operations Research , 9 , 145 – 162 .
  • Maher , M. J. and Hughes , P. C. ( 1997 ). A Probit-based stochastic user equilibrium assignment model , Transportation Research , 31 ( 4 ), 341 – 355 .
  • Cass , T. ( 1969 ). Statistical methods in management , Cassell , London .
  • Sculii , D. ( 1983 ). The completion time of PERT networks , Journal of Operational Research Society , 34 ( 2 ), 155 – 158 .
  • Kamburowski , J. ( 1985 ). Normally distributed activity durations in PERT networks , Journal of Operational Research Society , 36 ( 11 ), 1051 – 1057 .
  • Putcha , C. S. and Rao , S. J. K. ( 1991 ). Probabilistic network analysis for project completion time , Civil Engineering Systems , 8 , 179 – 184 .
  • @Risk Risk Analysis for Spreadsheets Guide to using @Risk for Project, Risk Analysis and Simulation Add-In for Microsoft Project, Window Version Release 1.0 , Palisade Corporation , January , 1994 .
  • Brook , A. C. , Leahy , J. P. and Shaffer , L. R. , A man - machine CPM system for decision making in the construction industry , Civil Engineering Studies , Construc tion Research Series, No. 9 , University of Illinois , Urbana , Illinois , June , 1967 .
  • Brand , J. D. , Meyer , W. L. and Shaffer , L. R. , The resource scheduling problem in construction , Civil Engineering Studies , Construction Research Series, No. 5 , University of Illinois , Urbana , Illinois , June , 1964 .
  • Mendell , N. R. and Elston , R. C. ( 1974 ). Multifactorial qualitative traits genetic analysis and prediction of recurrence risks , Biometrics , 30 , 41 – 57 .
  • Kamakura , W. A. ( 1989 ). The estimation of multinomial probit models a new calibration algorithm , Transportation Science , 23 ( 4 ), 253 – 265 .
  • Langdon , M. G. ( 1984 a). Improved algorithms for estimating choice probabilities in the multinomial probit model , Transportation Science , 18 ( 3 ), 267 – 299 .
  • Langdon , M. G. ( 1984 b). Methods of determining choice probability in utility maximising multiple alternative models , Transportation Research , B18 ( 3 ), 209 – 234 .
  • Ahuja Hira , N. , Dozzi , S. P. and Abourizk , S. M. ( 1994 ). Project management techniques in planning and controlling construction projects , John Wiley & Sons , New York , pp. 310 .
  • Risk Decisions Ltd. ( 1992 ). Predict! Application report - project risk , Oxford , pp. 3 .
  • Smith , S. D. , Osborne , J. R. and Forde , M. C. ( 1996 ). The use of a discrete-event simulation model with Erlang probability distributions in the estimation of earthmoving production , Civil Engineering Systems , 13 ( 1 ), 25 – 44 .
  • Law , A. M. and Kelton , W. D. ( 1991 ). Simulation modelling and analysis, 2nd edn. McGraw-Hill , New York .
  • Naylor , T. H. and Finger , J. M. ( 1967 ). Verification of computer simulation models , Management Science , 14 ( 2 ), 92 – 101 .
  • Naylor , T. H. ( 1971 ). Computer simulation experiments with models of economic systems , John Wiley and Sons , New York .
  • Smith , S. D. , Osborne , J. R. and Forde , M. C. ( 1995a ). Productivity estimation in back-acter/dump-truck earth-moving operations , Proceeding of Institute Civil Engineers, Transportation , 111 ( 2 ), 125 – 131 .
  • Smith , S. D. , Osborne , J. R. and Forde , M. C. , Analysis of earth-moving systems using discrete-event simulation , Journal of Construction Engineering and Manage ment , 121 ( 4 ), December , 1995 b, 388 – 396 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.