32
Views
13
CrossRef citations to date
0
Altmetric
Original Articles

TREATMENT OF CORRELATION FOR RISK ANALYSIS OF ENGINEERING PROJECTS

&
Pages 17-39 | Published online: 20 Sep 2007

References

  • Amos , D.E. , and Daniel , S.L. ( 1971 ), “ Tables of Percentage Points of Standardized Pearson Distributions ”, Research Report#SC-RR-710348 , NTIS , Virginia , U.S.A.
  • Ang , A.H.-S. , and Tang , W.H. ( 1975 ), Probability Concepts in Engineering Planning and Design , John Wiley & Sons , New York .
  • Bury , K.V. ( 1975 ), Statistical Models in Applied Science , John Wiley & Sons , New York .
  • Caselton , W.F. , Kan , L. , and Zidek , J. V. ( 1990 ), “ Quality Data Networks that Minimize Entropy ”, Statistics in the Environmental and Earth Science , Griffin Books , U.K (in press).
  • Cooper , D.F. , and Chapman , C.B. ( 1987 ), Risk Analysis for Large Projects, Models, Methods and Cases , John Wiley & Sons , N.Y.
  • Der Kiureghian , A. , and Liu , P-L. ( 1986 ), “ Structural Reliability under Incomplete Probability Information ”, J. Engrg. Mech., ASCE , 112 ( 1 ), 85 – 104 .
  • Eilon , S. and Fowkes , T.R. ( 1973 ), “ Sampling Procedures for Risk Simulation ”, Opert. Resrch. Quart. , 24 ( 2 ), 241 – 252 .
  • Foschi , R.O. , Folz , B.R. , and Yao , F.Z. ( 1989 ), “ Reliability Based Design of Wood Structures ”, Structural Report Series, Report#34, Dept. of Civ. Engrg. , The Univ of British Columbia , Vancouver , Canada .
  • Hendrickson , C , Martinelli , D. , and Rehak , D. ( 1987 ), “ Hierarchical Rule-Based Activity Duration Estimation ”, J. Const. Engrg. & Mgmt. , 113 ( 2 ), 288 – 301 .
  • Hilliard , J.E. , and Leitch , R.A. ( 1975 ), “ Cost Volume Profit Analysis under Uncertainty ”, Accounting Review , 50 ( 1 ), 69 – 80 .
  • Howard , R.A. ( 1971 ), “ Proximal Decision Analysis ”, Mgmt. Sci. , 17 ( 9 ), 507 – 541 .
  • Hull , J.C. ( 1977 ), “ Dealing with Dependence in Risk Simulation ”, Opert. Resrch. Quart. , 28 ( iii ), 201 – 213 .
  • Hull , J.C. ( 1980 ), The Evaluation of Risk in Business Investment , Pergamon Press .
  • Inyang , E.D. ( 1983 ), Some Aspects of Risk Analysis for Decision Making in Engineering Project Management , thesis presented to The University of Manchester, UMIST, U.K in partial fulfillment of the requirements for the Ph.D.
  • Jaafari , A. ( 1984 ), “ Criticism of CPM for Project Planning Analysis ”, J. Const. Engrg. & Mgmt , 110 ( 2 ), 222 – 233 .
  • Jaafari , A. ( 1988 ), “ Project Viability and Economic Risk Analysis ”, J. Mgmt. Engrg , 4 ( 1 ), 29 – 45 .
  • Jaedicke , R.K. , and Robichek , A. A. ( 1964 ), “ Cost Volume Profit Analysis under Uncertainty ”, Accounting Review 39 ( 4 ), 917 – 926 .
  • Johnson , N.L. , Nixon , E. , and Amos , D.E. ( 1963 ), “ Table of Percentage Points of Pearson Curves, for Given √β1 and (32, Expressed in Standard Measure ”, Biometrika , 50 ( 3 & 4 ), 459 – 498 .
  • Kadane , J.B. , Dickey , J.M. , Winkler , R.L. , Smith , W.S. , and Peters , S.C. ( 1980 ), “ Interactive Elicitation of Opinion for a Normal Linear MSect. , 75 ( 372 ), 845 – 854 .
  • Keefer , D.L. , and Bodily , S.E. ( 1983 ), “ Three-Point Approximations for Continuous Random Variables ”, Mgmt. Sci. , 29 ( 5 ), 595 – 609 .
  • Kendall , M.G. , and Stuart , A. ( 1969 ), The Advanced Theory of Statistics , Vol. 1 , Third Edition , Hafher Publishing Co. , New York .
  • Kottas , J.F. , and Lau , H-S. ( 1978 ), “ Stochastic Break-even Analysis ”, J. Opert. Resrch. Soc , 29 ( 3 ), 251 – 257 .
  • Kryzanowski , L. , Lusztig , P. , and Schwab , B. ( 1972 ), “ Monte Carlo Simulation and Capital Expenditure Decisions7P7A Case Study ”, Engrg. Econ. , 18 ( 1 ), 31 – 48 .
  • Perry , J.G. , and Hayes , R.W. ( 1985 ), “ Risk and its Management in Construction Projects ”, Procd., Inst, of Civ. Engr., U.K. 78 ( 1 ), 499 – 521 .
  • Ranasinghe , K.A.M.K. ( 1990 ), Analytical Method for Quantification of Economic Risks during Feasibility Analysis for Large Engineering Projects , thesis presented to The University of British Columbia, at Vancouver, Canada in partial fulfillment of the requirements for the Ph.D.
  • Russell , A.D. , and Ranasinghe , M. ( 1990 ), “ Analytical Approach for Economic Risk Quantification of Large Engineering Projects ”, Submitted J. Const. Mgmt. & Econ. , U.K.
  • Siddall , J.N. ( 1972 ), Analytical Decision-Making in Engineering Design , Prentice-Hall , Englewood Cliffs , N.J.
  • Starr , M.K. , Tapiero , C.S. ( 1975 ), “ Linear Breakeven Analysis Under Risk ”, J. Opert. Resrch. Soc , 26 ( 4 ), 847 – 856 .
  • Thompson , P.A. and Wilmer , G. ( 1985 ), “ CASPAR - A Program for Engineering Project Appraisal and Management ”, 2nd Int. Conf Civ. & Struct. Engrg Comput. , 1 , 75 – 81 .
  • Wagle , B. ( 1967 ), “ A Statistical Analysis of Risk in Capital Investment Projects ”, Opert. Resrch. Quart. , 18 ( 1 ), 13 – 33 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.