197
Views
3
CrossRef citations to date
0
Altmetric
Original Articles

Distribution analysis of train interval journey time employing the censored model with shifting character

, , , &
Pages 715-733 | Received 03 Aug 2015, Accepted 20 Apr 2016, Published online: 27 May 2016

References

  • M. Abril, F. Barber, L. Ingolotti, M.A. Salido, P. Tormos, and A. Lova, An assessment of railway capacity, Transp. Res. E-Log 44 (2008), pp. 774–806. doi: 10.1016/j.tre.2007.04.001
  • K. Bury, Statistical Distributions in Engineering, Cambridge University Press, Cambridge, 1999.
  • V. Cacchiani and P. Toth, Nominal and robust train timetabling problems, Eur. J. Oper. Res. 219 (2012), pp. 727–737. doi: 10.1016/j.ejor.2011.11.003
  • A. Caprara, L. Kroon, M. Monaci, M. Peeters, and P. Toth, Passenger railway optimization, in Discrete optimization, K. Aardal, G.L. Nemhauser, and R. Weismantel, eds., Elsevier Science, pp. 29–187. Available at http://hdl.handle.net/1765/14204
  • E. Castillo, I. Gallego, J.M. Ureña, and J.M. Coronado, Timetabling optimization of a mixed double- and single-tracked railway network, Appl. Math. Model. 35 (2011), pp. 859–878. doi: 10.1016/j.apm.2010.07.041
  • J.W. Goossens, S.V. Hoesel, and L. Kroon, On solving multi-type railway line planning problems, Eur. J. Oper. Res. 168 (2006), pp. 403–424. doi: 10.1016/j.ejor.2004.04.036
  • R.M.P. Goverde, Punctuality of railway operations and timetable stability analysis, Trail thesis series No.T2005/10, The Netherlands TRAIL Research School.
  • S.S. Harrod, A tutorial on fundamental model structures for railway timetable optimization, Surv. Oper. Res. Manag. Sci. 17 (2012), pp. 85–96.
  • A. Higgins and E. Kozan, Modeling train delays in urban networks, Transp. Sci. 32 (1998), pp. 346–358. doi: 10.1287/trsc.32.4.346
  • T. Huisman and J.B. Richard, Running times on railway sections with heterogeneous train traffic, Transp. Res. B-Meth. 35 (2001), pp. 271–292. doi: 10.1016/S0191-2615(99)00051-X
  • L. Kroon, R. Dekker, G. Maroti, M.R. Helmrich, and M. Vromans, Stochastic improvement of cyclic railway timetables, Transp. Res. B-Meth. 42 (2008), pp. 553–570. doi: 10.1016/j.trb.2007.11.002
  • S. Kurt, Limited dependent variable models, Lecture Notes in Microeconometrics in Pompeu Fabra University, 2007. Available at http://kurt.schmidheiny.name/teaching/limiteddependent2up.pdf.
  • F. Li, Z.Y. Gao, K.P. Li, and L.X. Yang, Efficient scheduling of railway traffic based on global information of train, Transp. Res. B-Meth. 42 (2008), pp. 1008–1030. doi: 10.1016/j.trb.2008.03.003
  • G.S. Maddala, Limited-Dependent and Qualitative Variables in Econometrics, Cambridge University Press, Cambridge, 1983.
  • L.E. Meester and S. Muns, Stochastic delay propagation in railway networks and phase-type distribution, Transp. Res. B-Meth. 41 (2007), pp. 218–230. doi: 10.1016/j.trb.2006.02.007
  • M.A. Salido, F. Barber, and L. Ingolotti, Robustness for a single railway line: Analytical and simulation methods, Expert Syst. Appl. 39 (2012), pp. 13305–13327. doi: 10.1016/j.eswa.2012.05.071
  • M.A. Shafia, S.J. Sadjadi, A. Jamili, R. Tavakkoli-Moghaddam, and M. Pourseyed-Aghaee, The periodicity and robustness in a single-track train scheduling problem, Appl. Soft Comput. 12 (2012), pp. 440–452. doi: 10.1016/j.asoc.2011.08.026
  • N. Tomii, Robustness indices for train rescheduling, 1st International Seminar on Railway Operations Modeling and Analysis in Delft University of Technology, Netherlands, 2005.
  • M.J.C.M. Vromans, R. Dekker, and L.G. Kroon, Reliability and heterogeneity of railway service, Eur. J. Oper. Res. 172 (2006), pp. 647–665. doi: 10.1016/j.ejor.2004.10.010
  • J.M. Wooldridge, Econometric Analysis of Cross Section and Panel Data, MIT Press, Cambridge, 2002, pp. 451.
  • C. Yu-Hern, Y. Chung-Hsing, and S. Ching-Cheng, A multi-objective model for passenger train services planning: Application to Taiwan’s high-speed rail line, Transp. Res. B-Meth. 34 (2000), pp. 91–106. doi: 10.1016/S0191-2615(99)00013-2
  • Z. Yugang, M. Baohua, and J. Yu-kun, Study on the buffer time of metro train diagram based on train running time deviation, China Railway Sci. 32 (2011), pp. 118–121. (In Chinese)

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.