References
- Arora, A., F. Jin, and H.-A. Choi. 2006. “Scheduling Resource Allocation with Timeslot Penalty for Changeover.” Theoretical Computer Science 369: 323–337. doi: 10.1016/j.tcs.2006.09.016
- Bhatnagar, R., V. Saddikutti, and A. Rajgopalan. 2007. “Contingent Manpower Planning in a High Clock Speed Industry.” International Journal of Production Research 45: 2051–2072. doi: 10.1080/00207540600665802
- Chang, S. Y., Y. Hong, J. H. Kim, and X. Kim. 1999. “A Heuristic Algorithm for Minimising Maintenance Workforce Level.” Production Planning & Control 10: 778–786. doi: 10.1080/095372899232605
- Cornuéjols, G., M. Karamanov, and Y. Li. 2006. “Early Estimates of the Size of Branch-and-Bound Trees.” INFORMS Journal on Computing 18: 86–96. doi: 10.1287/ijoc.1040.0107
- Derrac, J., S. García, D. Molina, and F. Herrera. 2011. “A Practical Tutorial on the Use of Nonparametric Statistical Tests as a Methodology for Comparing Evolutionary and Swarm Intelligence Algorithms.” Swarm and Evolutionary Computation 1: 3–18. doi: 10.1016/j.swevo.2011.02.002
- Doganis, P., and H. Sarimveis. 2008. “Mixed Integer Linear Programming Scheduling in the Food Industry.” In Optimization in Food Engineering, edited by F. Erdogdu, 305–326. CRC Press.
- Eiselt, H. A., and V. Marianov. 2008. “Workload Assignment with Training, Hiring and Firing.” Engineering Optimization 40: 1051–1066. doi: 10.1080/03052150802293369
- Garey, R. M., and D. C. Johnson. 1979. Computers and Intractability. New York: Freeman and Company.
- Lagodimos, A. G., and V. Leopoulos. 2000. “Greedy Heuristic Algorithms for Manpower Shift Planning.” International Journal of Production Economics 68: 95–106. doi: 10.1016/S0925-5273(99)00099-7
- Lagodimos, A. G., and A. N. Mihiotis. 2006. “Overtime vs. Regular Shift Planning Decisions in Packing Shops.” International Journal of Production Economics 101: 246–258. doi: 10.1016/j.ijpe.2004.12.028
- Lagodimos, A. G., and A. N. Mihiotis. 2010. “Efficient Overtime Planning in Packing Shops with Lines of Identical Manning.” International Journal of Production Economics 124: 453–462. doi: 10.1016/j.ijpe.2009.12.008
- Lagodimos, A. G., and J. A. Paravantis. 2006. “Improved Heuristic for Manpower Shift Planning with Modified Shift Priorities.” Production Planning & Control 17: 301–310. doi: 10.1080/09537280500285631
- Lee, Z. W., D. N. Ford, and N. Joglekar. 2007. “Effects of Resource Allocation Policies for Reducing Project Durations: A Systems Modelling Approach.” Systems Research and Behavioral Science 24: 551–566. doi: 10.1002/sres.809
- Nearchou, A. C., and A. G. Lagodimos. 2013. “Heuristic Solutions for the Economic Manpower Shift Planning Problem.” European Journal of Industrial Engineering 7 (6): 657–686. doi: 10.1504/EJIE.2013.058390
- Pan, Q.-K., P. N. Suganthan, T. J. Chua, and T. X. Cai. 2010. “Solving Manpower Scheduling Problem in Manufacturing Using Mixed-Integer Programming with a Two-stage Heuristic Algorithm.” International Journal of Advanced Manufacturing Technology 46: 1229–1237. doi: 10.1007/s00170-009-2175-8
- Shaffer, J. P. 1986. “Modified Sequentially Rejective Multiple Test Procedures.” Journal of the American Statistical Association 81: 826–831. doi: 10.1080/01621459.1986.10478341
- Sprent, P., and N. Smeeton. 2007. Applied Nonparametric Statistical Methods. 4th ed. Boca Raton, FL: Chapman & Hall/CRC Texts in Statistical Science.
- Yannibelli, V., and A. Amandi. 2013. “Project Scheduling: A Multi-Objective Evolutionary Algorithm that Optimizes the Effectiveness of Human Resources and the Project Makespan.” Engineering Optimization 45: 45–65. doi: 10.1080/0305215X.2012.658782