234
Views
12
CrossRef citations to date
0
Altmetric
Original Articles

An inexact stochastic–fuzzy jointed chance-constrained programming for regional energy system management under uncertainty

, &
Pages 788-804 | Received 27 Nov 2013, Accepted 15 Apr 2014, Published online: 30 Jun 2014

References

  • Cai, Y. P., G. H. Huang, Z. F. Yang, Q. G. Lin, B. Bass, and Q. Tan. 2008. “Development of an Optimization Model for Energy Systems Planning in the Region of Waterloo.” International Journal of Energy Research 32 (11): 988–1005. doi: 10.1002/er.1407
  • Canizes, B., J. Soares, Z. Vale, and H. M. Khodr. 2012. “Hybrid Fuzzy Monte Carlo Technique for Reliability Assessment in Transmission Power Systems.” Energy 45 (1): 1007–1017. doi: 10.1016/j.energy.2012.06.049
  • Cao, C., X. Gu, and Z. Xin. 2009. “Chance Constrained Programming Models for Refinery Short-Term Crude Oil Scheduling Problem.” Applied Mathematical Modelling 33 (3): 1696–1707. doi: 10.1016/j.apm.2008.03.022
  • Charnes, A., and W. W. Cooper. 1988. “Efficiency Characterizations in Different DEA Models.” Socio-Economic Planning Sciences 22 (6): 253–257. doi: 10.1016/0038-0121(88)90007-9
  • Charnes, A., W. W. Cooper, and M. J. L. Kirby. 1972. “Chance-Constrained Programming: An Extension of Statistical Method.” Optimizing Methods in Statistics, Academic Press, New York, 391–402.
  • Chen, M. J., and G. H. Huang. 2001. “A Derivative Algorithm for Inexact Quadratic Program—Application to Environmental Decision-Making Under Uncertainty.” European Journal of Operational Research 128 (3): 570–586. doi: 10.1016/S0377-2217(99)00374-4
  • Debnath, K., and L. Goel. 1995. “Power System Planning—A Reliability Perspective.” Electric Power Systems Research 34 (3): 179–185. doi: 10.1016/0378-7796(95)00976-X
  • Dupačová, J., A. Gaivoronski, Z. Kos, and T. Szantai. 1991. “Stochastic programming in water management: A case study and a comparison of solution techniques.” European Journal of Operational Research 52 (1): 28–44. doi: 10.1016/0377-2217(91)90333-Q
  • Fan, Y. R., and G. H. Huang. 2012. “A Robust Two-Step Method for Solving Interval Linear Programming Problems within an Environmental Management Context.” Journal of Environmental Informatics 19 (1): 1–12. doi: 10.3808/jei.201200203
  • Fan, Y. R., G. H. Huang, and Y. P. Li. 2012. “Robust Interval Linear Programming for Environmental Decision Making Under Uncertainty.” Engineering Optimization 44 (11): 1321–1336. doi: 10.1080/0305215X.2011.649746
  • Fan, Y., G. Huang, and A. Veawab. 2012. “A Generalized Fuzzy Linear Programming Approach for Environmental Management Under Uncertainty.” Journal of the Air & Waste Management Association 62 (1): 72–86. doi: 10.1080/10473289.2011.628901
  • Glenz, C., I. Iorgulescu, F. Kienast, and R. Schlaepfer. 2008. “Modelling the Impact of Flooding Stress on the Growth Performance of Woody Species Using Fuzzy Logic.” Ecological Modelling 218 (1): 18–28. doi: 10.1016/j.ecolmodel.2008.06.008
  • Guo, P., and G. H. Huang. 2009. “Two-Stage Fuzzy Chance-Constrained Programming: Application to Water Resources Management Under Dual Uncertainties.” Stochastic Environmental Research and Risk Assessment 23 (3): 349–359. doi: 10.1007/s00477-008-0221-y
  • He, L., G. H. Huang, Q. Tan, and Z. F. Liu. 2008. “An Interval Full-Infinite Programming Method to Supporting Environmental Decision-Making.” Engineering Optimization 40 (8): 709–728. doi: 10.1080/03052150802043681
  • Hesse, C., V. Krysanova, J. Päzolt, and F. F. Hattermann. 2008. “Eco-Hydrological Modelling in a Highly Regulated Lowland Catchment to Find Measures for Improving Water Quality.” Ecological Modelling 218 (1): 135–148. doi: 10.1016/j.ecolmodel.2008.06.035
  • Hu, Q., G. Huang, Y. Cai, and Y. Huang. 2011. “Feasibility-Based Inexact Fuzzy Programming for Electric Power Generation Systems Planning Under Dual Uncertainties.” Applied Energy 88 (12): 4642–4654. doi: 10.1016/j.apenergy.2011.06.004
  • Huang, G. H. 1996. “IPWM: An Interval Parameter Water Quality Management Model.” Engineering Optimization 26 (2): 79–103. doi: 10.1080/03052159608941111
  • Huang, G. H., B. W. Baetz, and G. G. Patry. 1995. “Grey Quadratic Programming and its Application to Municipal Solid Waste Management Planning Under Uncertainty.” Engineering Optimization 23 (3): 201–223. doi: 10.1080/03052159508941354
  • Huang, G. H., and D. P. Loucks. 2000. “An Inexact Two-Stage Stochastic Programming Model for Water Resources Management Under Uncertainty.” Civil Engineering Systems 17 (2): 95–118. doi: 10.1080/02630250008970277
  • Li, Y. P., G. H. Huang, and S. L. Nie. 2006. “An Interval-Parameter Multi-Stage Stochastic Programming Model for Water Resources Management Under Uncertainty.” Advances in Water Resources 29 (11): 776–789. doi: 10.1016/j.advwatres.2005.07.008
  • Li, Y. P., G. H. Huang, S. L. Nie, X. H. Nie, and I. Maqsood. 2006. “An Interval-Parameter Two-Stage Stochastic Integer Programming Model for Environmental Systems Planning Under Uncertainty.” Engineering Optimization 38 (4): 461–483. doi: 10.1080/03052150600557742
  • Li, Y. P., G. H. Huang, S. L. Nie, and X. S. Qin. 2007. “ITCLP: An Inexact Two-Stage Chance-Constrained Program for Planning Waste Management Systems.” Resources, Conservation and Recycling 49 (3): 284–307. doi: 10.1016/j.resconrec.2006.03.017
  • Li, Y. P., G. H. Huang, N. Zhang, and S. L. Nie. 2011. “An Inexact-Stochastic with Recourse Model for Developing Regional Economic–Ecological Sustainability Under Uncertainty.” Ecological Modelling 222 (2): 370–379. doi: 10.1016/j.ecolmodel.2009.12.010
  • Liu, B., and K. Iwamura. 1998. “Chance Constrained Programming with Fuzzy Parameters.” Fuzzy Sets and Systems 94 (2): 227–237. doi: 10.1016/S0165-0114(96)00236-9
  • Maqsood, I., G. H. Huang, and J. Scott Yeomans. 2005. “An Interval-Parameter Fuzzy Two-Stage Stochastic Program for Water Resources Management Under Uncertainty.” European Journal of Operational Research 167 (1): 208–225. doi: 10.1016/j.ejor.2003.08.068
  • Martin, Q. W. 1995. “Optimal Reservoir Control for Hydropower on Colorado River, Texas.” Journal of Water Resources Planning and Management 121 (6): 438–446. doi: 10.1061/(ASCE)0733-9496(1995)121:6(438)
  • Qin, X., G. Huang, and L. Liu. 2010. “A Genetic-Algorithm-Aided Stochastic Optimization Model for Regional Air Quality Management Under Uncertainty.” Journal of the Air & Waste Management Association 60 (1): 63–71. doi: 10.3155/1047-3289.60.1.63
  • Rong, A., and R. Lahdelma. 2008. “Fuzzy Chance Constrained Linear Programming Model for Optimizing the Scrap Charge in Steel Production.” European Journal of Operational Research 186 (3): 953–964. doi: 10.1016/j.ejor.2007.02.017
  • Seifi, A., and K. W. Hipel. 2001. “Interior-Point Method for Reservoir Operation with Stochastic Inflows.” Journal of Water Resources Planning and Management 127 (1): 48–57. doi: 10.1061/(ASCE)0733-9496(2001)127:1(48)
  • Shen, Y. S., Z. F. Tan, X. L. Shen, J. J. Bai, Q. Z. Li, and S. Wang. 2012. “Study of Energy Saving and Emission Reduction Based on the OLAP Multi-Indicator Relational Model.” Journal of Environmental Informatics 20 (2): 115–122. doi: 10.3808/jei.201200225
  • Singh, T. S., and D. Chakrabarty. 2011. “Chance-Constrained Multi-Objective Programming for Optimal Multi-Layer Aquifer Remediation Design.” Engineering Optimization 43 (10): 417–432. doi: 10.1080/0305215X.2010.491548
  • Sun, Y., Y. P. Li, and G. H. Huang. 2012. “A Queuing-Theory-Based Interval-Fuzzy Robust Two-Stage Programming Model for Environmental Management Under Uncertainty.” Engineering Optimization 44 (6): 707–724. doi: 10.1080/0305215X.2011.604317
  • Suo, M. Q., Y. P. Li, G. H. Huang, D. L. Deng, and Y. F. Li. 2013. “Electric Power System Planning Under Uncertainty Using Inexact Inventory Nonlinear Programming Method.” Journal of Environmental Informatics 22 (1): 49–67. doi: 10.3808/jei.201300245
  • Trezos, T., and W. W. G. Yeh. 1987. “Use of Stochastic Dynamic Programming for Reservoir Management.” Water Resources Research 23 (6): 983–996. doi: 10.1029/WR023i006p00983
  • Xu, Y., G. H. Huang, L. G. Shao, and C. Chen. 2012. “Efficient Management of Air Quality Considering Fuzzy Confidences with Varied Reliabilities.” Engineering Optimization 44 (16): 947–964. doi: 10.1080/0305215X.2011.620102
  • Yeomans, J. S., and G. H. Huang. 2003. “An Evolutionary Grey, Hop, Skip, and Jump Approach: Generating Alternative Policies for the Expansion of Waste Management Facilities.” Journal of Environmental Informatics 1 (1): 37–51. doi: 10.3808/jei.200300005
  • Yeomans, J. S., G. H. Huang, and R. Yoogalingam. 2003. “Combining Simulation with Evolutionary Algorithms for Optimal Planning Under Uncertainty: An Application to Municipal Solid Waste Management Planning in the Regional Municipality of Hamilton-Wentworth.” Journal of Environmental Informatics 2 (1): 11–30. doi: 10.3808/jei.200300014
  • Zhao, X., B. Chen, and Z. F. Yang. 2009. “National Water Footprint in an Input–Output Framework—A Case Study of China 2002.” Ecological Modelling 20 (2): 245–253. doi: 10.1016/j.ecolmodel.2008.09.016
  • Zhu, Y., Y. P. Li, G. H. Huang, and D. Z. Fu. 2013. “Modeling for Planning Municipal Electric Power Systems Associated with Air Pollution Control—A Case Study of Beijing.” Energy 60: 168–186. doi: 10.1016/j.energy.2013.07.046

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.