327
Views
5
CrossRef citations to date
0
Altmetric
Original Articles

Integrated scheduling of a container handling system with simultaneous loading and discharging operations

, , , &
Pages 397-414 | Received 23 Feb 2014, Accepted 23 Dec 2014, Published online: 25 Feb 2015

References

  • Bierwirth, C., and F. Meisel. 2009. “A Fast Heuristic for Quay Crane Scheduling with Interference Constraint.” Journal of Scheduling 12: 345–360. doi: 10.1007/s10951-009-0105-0
  • Carlo, H. J., I. F. A. Vis, and K. J. Roodbergen. 2014. “Transport operations in container terminals: Literature overview, trends, research directions and classification scheme.” European Journal of Operational Research 236: 1–13.
  • Chen, L., N. Bostel, P. Dejax, J. Cai, and L. Xi. 2007. “A Tabu Search Algorithm for the Integrated Scheduling Problem of Container Handling Systems in a Maritime Terminal.” European Journal of Operational Research 181: 40–58. doi: 10.1016/j.ejor.2006.06.033
  • Chen, L., A. Langevin, and Z. Lu. 2013. “Integrated Scheduling of Crane Handling and Truck Transportation in a Maritime Container Terminal.” European Journal of Operational Research 225: 142–152. doi: 10.1016/j.ejor.2012.09.019
  • Goodchild, A. V., and C. F. Daganzo. 2007. “Crane Double Cycling in Container Ports: Planning Methods and Evaluation.” Transportation Research Part B: Methodological 41: 875–891. doi: 10.1016/j.trb.2007.02.006
  • Guo, P., W. Cheng, and Y. Wang. 2013. “A Modified Generalized Extremal Optimization Algorithm for the Quay Crane Scheduling Problem with Interference Constraints.” Engineering Optimization 46 (10): 1411–1429. doi: 10.1080/0305215X.2013.844803
  • Lau, H. Y. K., and Y. Zhao. 2008. “Integrated Scheduling of Handling Equipment at Automated Container Terminals.” International Journal of Production Economics 112: 665–682. doi: 10.1016/j.ijpe.2007.05.015
  • Lee, L. H., E. P. Chew, K. C. Tan, and Y. Wang. 2010. “Vehicle Dispatching Algorithms for Container Transshipment Hubs.” OR Spectrum 32: 663–685. doi: 10.1007/s00291-010-0199-y
  • Lee, D.-H., H. Q. Wang, and L. Miao. 2008. “Quay Crane Scheduling with Non-Interference Constraints in Port Container Terminals.” Transportation Research Part E 44: 124–135. doi: 10.1016/j.tre.2006.08.001
  • Lee, K. M., T. Yamakawa, and K. M. Lee. 1998. “A Genetic Algorithm for General Machine Scheduling Problems.” International Journal Knowledge-Based Electronic 2: 60–66.
  • Lu, Z., X. Han, L. Xi, and A. L. Erera. 2012. “A Heuristic for the Quay Crane Scheduling Problem Based on Contiguous Bay Crane Operations.” Computers & Operations Research 39: 2915–2928. doi: 10.1016/j.cor.2012.02.013
  • Meersmans, P. J. M., and A. P. M. Wagelmans. 2001. “Effective Algorithms for Integrated Scheduling of Handling Equipment at Automated Container Terminals.” ERIM Report Series Research in Management ERS-2001-36-LIS. Erasmus University, Rotterdam.
  • Pinedo, M. 2002. Scheduling: Theory, Algorithms and Systems. Englewood Cliffs, NJ: Prentice-Hall.
  • Skinner, B., S. Yuan, S. Huang, D. Liu, B. Cai, G. Dissanayake, H. Lay, A. Bott, and D. Pagac. 2013. “Optimisation for Job Scheduling at Automated Container Terminals Using Genetic Algorithm.” Computers & Industrial Engineering 64: 511–523. doi: 10.1016/j.cie.2012.08.012
  • Stahlbock, R., and S. Voß. 2008. “Operations Research at Container Terminals: A Literature Update.” OR Spectrum 30: 1–52. doi: 10.1007/s00291-007-0100-9
  • Steenken, D., S. Voß, and R. Stahlbock. 2004. “Container Terminal Operation and Operations Research—A Classification and Literature Review.” OR Spectrum 26: 3–49. doi: 10.1007/s00291-003-0157-z
  • Vis, I. F. A., and R. de Koster. 2003. “Transshipment of Containers at a Container Terminal: An Overview.” European Journal of Operational Research 147: 1–16. doi: 10.1016/S0377-2217(02)00293-X
  • Zeng, Q. C., and Z. Z. Yang. 2009. “Integrating Simulation and Optimization to Schedule Loading Operations in Container Terminals.” Computers & Operations Research 36: 1935–1944. doi: 10.1016/j.cor.2008.06.010
  • Zhang, H. P., and K. H. Kim. 2009. “Maximizing the Number of Dual-Cycle Operations of Quay Cranes in Container Terminals.” Computers & Industrial Engineering 56: 979–992. doi: 10.1016/j.cie.2008.09.008

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.