310
Views
5
CrossRef citations to date
0
Altmetric
Original Articles

Model development and comparison of different heuristics for production planning in large volume softwood sawmills

&
Pages 1829-1847 | Received 18 Aug 2016, Accepted 06 Dec 2016, Published online: 23 Jan 2017

References

  • Bajgiran, Omid Sanei, Masoumeh Kazemi Zanjani, and Mustapha Nourelfath. 2016. “The Value of Integrated Tactical Planning Optimization in the Lumber Supply Chain.” International Journal of Production Economics 171 (Part 1): 22–33. doi: 10.1016/j.ijpe.2015.10.021.
  • Ben Ali, Maha, Jonathan Gaudreault, Sophie D'Amours, and Marc-André Carle. 2014. “A Multi-Level Framework for Demand Fulfillment in a Make-to-Stock Environment—A Case Study in Canadian Softwood Lumber Industry.” In MOSIM 2014, 10ème Conférence Francophone de Modélisation, Optimisation et Simulation, 5–7 November 2014, Nancy, France. https://hal.archives-ouvertes.fr/hal-01166600/.
  • Björk, Kaj-Mikael, and Christer Carlsson. 2007. “The Effect of Flexible Lead Times on a Paper Producer.” International Journal of Production Economics 107 (1): 139–150. doi: 10.1016/j.ijpe.2006.06.021.
  • Fronius, Karl. 1989. Arbeiten und Anlagen im Sägewerk. Bd. 2. Spaner Kreissägen Bandsägen [Operations and Machines at the Sawmill. Vol. 2. Profiler Circular Saws Band Saws]. Leinfelden-Echterdingen, Germany: DRW-Verlag.
  • Gaudreault, Jonathan, Jean-Marc Frayret, Alain Rousseau, and Sophie D'Amours. 2011. “Combined Planning and Scheduling in a Divergent Production System with Co-Production: A Case Study in the Lumber Industry.” Computers & Operations Research 38 (9): 1238–1250. doi: 10.1016/j.cor.2010.10.013.
  • Greigeritsch, Thomas. 2009. Neue Methoden zur Planung und Optimierung der Schnittholzproduktion von Nadelholzsägewerken [New Methods to Plan and Optimize the Timber Production at Softwood Sawmills]. Wiesbaden, Germany: Gabler. doi:10.1007/978-3-8349-8409-8.
  • Grinold, Richard C. 1983. “Model Building Techniques for the Correction of End Effects in Multistage Convex Programs.” Operations Research 31 (3): 407–431. doi: 10.1287/opre.31.3.407.
  • Gunnarsson, Helene, and Mikael Rönnqvist. 2008. “Solving a Multi-Period Supply Chain Problem for a Pulp Company Using Heuristics—An Application to Södra Cell AB.” International Journal of Production Economics 116 (1): 75–94. doi: 10.1016/j.ijpe.2008.07.010.
  • Maness, Thomas C., and Scott E. Norton. 2002. “Multiple Period Combined Optimization Approach to Forest Production Planning.” Scandinavian Journal of Forest Research 17 (5): 460–471. doi: 10.1080/028275802320435478.
  • Maturana, Sergio, Enzo Pizani, and Jorge Vera. 2010. “Scheduling Production for a Sawmill: A Comparison of a Mathematical Model Versus a Heuristic.” Computers & Industrial Engineering 59 (4): 667–674. doi: 10.1016/j.cie.2010.07.016.
  • Mendoza, Guillermo A., Roger J. Meimban, Philip A. Araman, and William G. Luppold. 1991. “Combined Log Inventory and Process Simulation Models for the Planning and Control of Sawmill Operations.” In 23rd CIRP International Seminar on Manufacturing Systems, 6–7 June 1991, Nancy, France, http://www.treesearch.fs.fed.us/pubs/84.
  • Pastor, Rafael, Jordi Altimiras, and Manuel Mateo. 2009. “Planning Production Using Mathematical Programming: The Case of a Woodturning Company.” Computers & Operations Research 36 (7): 2173–2178. doi: 10.1016/j.cor.2008.08.005.
  • Pradenas, Lorena, César Alvarez, and Jacques A. Ferland. 2009. “A Solution for the Aggregate Production Planning Problem in a Multi-Plant, Multi-Period and Multi-Product Environment.” Acta Mathematica Vietnamica 34 (1): 11–17. http://journals.math.ac.vn/acta/pdf/0901011.pdf.
  • Todoroki, Christine, and Mikael Rönnqvist. 2002. “Dynamic Control of Timber Production at a Sawmill with Log Sawing Optimization.” Scandinavian Journal of Forest Research 17 (1): 79–89. doi: 10.1080/028275802317221118.
  • Varas, Mauricio, Sergio Maturana, Rodrigo Pascual, Ignacio Vargas, and Jorge Vera. 2014. “Scheduling Production for a Sawmill: A Robust Optimization Approach.” International Journal of Production Economics 150: 37–51. doi: 10.1016/j.ijpe.2013.11.028.
  • Vergara, Francisco P., Cristian D. Palma, and Héctor Sepúlveda. 2015. “A Comparison of Optimization Models for Lumber Production Planning.” Bosque 36 (2): 239–246. doi: 10.4067/S0717-92002015000200009.
  • Yanasse, Horacio Hideki, and Marcelo Saraiva Limeira. 2006. “A Hybrid Heuristic to Reduce the Number of Different Patterns in Cutting Stock Problems.” Computers & Operations Research 33 (9): 2744–2756. doi: 10.1016/j.cor.2005.02.026.
  • Yáñez, Fabián Cid, Jean-Marc Frayret, Francois Léger, and Alain Rousseau. 2009. “Agent-Based Simulation and Analysis of Demand-Driven Production Strategies in the Timber Industry.” International Journal of Production Research 47 (22): 6295–6319. doi: 10.1080/00207540802158283.
  • Zanjani, Masoumeh Kazemi, Daoud Ait-Kadi, and Mustapha Nourelfath. 2010. “Robust Production Planning in a Manufacturing Environment with Random Yield: A Case in Sawmill Production Planning.” European Journal of Operational Research 201 (3): 882–891. doi: 10.1016/j.ejor.2009.03.041.
  • Zanjani, Masoumeh Kazemi, Daoud Ait-Kadi, and Mustapha Nourelfath. 2013. “A Stochastic Programming Approach for Sawmill Production Planning.” International Journal of Mathematics in Operational Research 5 (1): 1–18. doi: 10.1504/IJMOR.2013.050604.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.