415
Views
21
CrossRef citations to date
0
Altmetric
Original Articles

Multi-objective group scheduling optimization integrated with preventive maintenance

, &
Pages 1890-1904 | Received 18 May 2016, Accepted 23 Dec 2016, Published online: 08 Feb 2017

References

  • Aramon Bajestani, M., D. Banjevic, and J. C. Beck. 2014. “Integrated Maintenance Planning and Production Scheduling with Markovian Deteriorating Machine Conditions.” International Journal of Production Research 52 (24): 7377–7400. doi: 10.1080/00207543.2014.931609
  • Barlow, R., and L. Hunter. 1960. “Optimum Preventive Maintenance Policies.” Operations Research 8 (1): 90–100. doi: 10.1287/opre.8.1.90
  • Cassady, C. R., and E. Kutanoglu. 2005. “Integrating Preventive Maintenance Planning and Production Scheduling for a Single Machine.” IEEE Transactions on Reliability 54 (2): 304–309. doi: 10.1109/TR.2005.845967
  • Chen, W. J. 2009. “Minimizing Number of Tardy Jobs on a Single Machine Subject to Periodic Maintenance.” Omega 37: 591–599. doi: 10.1016/j.omega.2008.01.001
  • Cui, W., Z. Lu, and E. Pan. 2014. “Production Scheduling and Preventive Maintenance Integration Based on Multi-objective Optimization.” Computer Integrated Manufacturing Systems 20 (6): 1398–1404.
  • Ishibuchi, H., and T. Murata. 1998. “A Multi-objective Genetic Local Search Algorithm and its Application to Flowshop Scheduling.” IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and Reviews) 28 (3): 392–403. doi: 10.1109/5326.704576
  • Jamshidi, R., and M. M. Seyyed Esfahani. 2015. “Reliability-Based Maintenance and Job Scheduling for Identical Parallel Machines.” International Journal of Production Research 53 (4): 1216–1227. doi: 10.1080/00207543.2014.951739
  • Ji, M., Y. He, and T. C. E. Cheng. 2007. “Single-Machine Scheduling with Periodic Maintenance to Minimize Makespan.” Computers & Operations Research 34: 1764–1770. doi: 10.1016/j.cor.2005.05.034
  • Khamseh, A., F. Jolai, and M. Babaei. 2015. “Integrating Sequence-Dependent Group Scheduling Problem and Preventive Maintenance in Flexible Flow Shops.” The International Journal of Advanced Manufacturing Technology 77 (14): 173–185. doi: 10.1007/s00170-014-6429-8
  • Khatami, M., and S. Zegordi. 2014. “Coordinative Production and Maintenance Scheduling Problem with Flexible Maintenance Time Intervals.” Journal of Intelligent Manufacturing. doi: 10.1007/s10845-014-1001-9.
  • Khosrojerdia, A., S. H. Zegordib, J. K. Allena, and F. Mistreec. 2016. “A Method for Designing Power Supply Chain Networks Accounting for Failure Scenarios and Preventive Maintenance.” Engineering Optimization 48 (1): 154–172. doi: 10.1080/0305215X.2014.998662
  • Konak, A., D. W. Coit, and A. E. Smith. 2006. “Multi-objective Optimization Using Genetic Algorithms: A Tutorial.” Reliability Engineering & System Safety 91 (9): 992–1007. doi: 10.1016/j.ress.2005.11.018
  • Moghaddam, K. S., and J. S. Ushera. 2011. “A New Multi-objective Optimization Model for Preventive Maintenance and Replacement Scheduling of Multi-component Systems.” Engineering Optimization 43 (7): 701–719. doi: 10.1080/0305215X.2010.512084
  • Niu, G., B.-S. Yang, and M. Pecht. 2010. “Development of an Optimized Condition-Based Maintenance System by Data Fusion and Reliability-Centered Maintenance.” Reliability Engineering & System Safety 95 (7): 786–796. doi: 10.1016/j.ress.2010.02.016
  • Pan, E., W. Liao, and L. Xi. 2010. “Single-Machine-Based Production Scheduling Model Integrated Preventive Maintenance Planning.” The International Journal of Advanced Manufacturing Technology 50 (14): 365–375. doi: 10.1007/s00170-009-2514-9
  • Pan, E., G. Wang, L. Xi, L. Chen, and X. L. Han. 2014. “Single-Machine Group Scheduling Problem Considering Learning, Forgetting Effects and Preventive Maintenance.” International Journal of Production Research 52 (19): 5690–5704. doi: 10.1080/00207543.2014.904967
  • Sun, K., and H. Li. 2010. “Scheduling Problems with Multiple Maintenance Activities and Non-preemptive Jobs on Two Identical Parallel Machines.” International Journal of Production Economics 124 (1): 151–158. doi: 10.1016/j.ijpe.2009.10.018
  • Tantardini, M., A. Portioli-Staudacher, and M. Macchi. 2014. “A Model for Considering the Impact of Rescheduling Planned Maintenance Activities in a Maintenance Service Contract.” Production Planning & Control 25 (3): 241–259. doi: 10.1080/09537287.2012.665094
  • Tao, X., T. Xia, and L. Xi. 2014. “Health-Index-Based Joint Optimization of Preventive Maintenance and Multi-attribute Production Scheduling.” Journal of Shanghai Jiaotong University 8: 1170–1174.
  • Tsao, Y. C. 2013. “Combined Production-Maintenance Decisions in Situations with Process Deterioration.” International Journal of Systems Science 44 (9): 1692–1700. doi: 10.1080/00207721.2012.669865
  • Vahdania, B., F. Jolaia, R. Tavakkoli-Moghaddama, and S. M. Mousavia. 2012. “Two Fuzzy Possibilistic Bi-objective Zero-One Programming Models for Outsourcing the Equipment Maintenance Problem.” Engineering Optimization 44 (7): 801–820. doi: 10.1080/0305215X.2011.613465
  • Wang, S., and M. Liu. 2013. “A Branch and Bound Algorithm for Single-Machine Production Scheduling Integrated with Preventive Maintenance Planning.” International Journal of Production Research 51 (3): 847–868. doi: 10.1080/00207543.2012.676683
  • Wang, G., B. Yu, and E. Pan. 2013a. “Single-Machine Group Scheduling Policy with Preventive Maintenance Planning Considering Learning and Forgetting Effects.” Journal of Shanghai Jiaotong University 47 (5): 723–727.
  • Wang, G., B. Yu, and E. Pan. 2013b. “Single-Machine Group Scheduling Policy Considering Learning and Forgetting Effects.” Industrial Engineering and Management 17 (5): 60–64.
  • Won, Y., and K. R. Currie. 2004. “Efficient p-Median Mathematical Programming Approaches to Machine-Part Grouping in Group Technology Manufacturing.” Engineering Optimization 36 (5): 555–573. doi: 10.1080/03052150410001696188
  • Xiao, L., S. Song, X. Chen, and David W. Coit. 2016. “Joint Optimization of Production Scheduling and Machine Group Preventive Maintenance.” Reliability Engineering & System Safety 146: 68–78. doi: 10.1016/j.ress.2015.10.013
  • Yssaad, B., and A. Abene. 2015. “Rational Reliability Centered Maintenance Optimization for Power Distribution Systems.” International Journal of Electrical Power & Energy Systems 73: 350–360. doi: 10.1016/j.ijepes.2015.05.015
  • Zhang, X., Y. Yin, and C. C. Wu. 2017. “Scheduling with Non-decreasing Deterioration Jobs and Variable Maintenance Activities on a Single Machine.” Engineering Optimization 49: 84–97. doi: 10.1080/0305215X.2016.1163629

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.