Joint optimization of preventive maintenance and flexible flowshop sequence-dependent group scheduling considering multiple setups

ORCID Icon, , , &
Pages 1529-1546 | Received 16 Nov 2017, Accepted 22 Oct 2018, Published online: 21 Nov 2018

References

  • Adressi, A., S. Hassanpour, and V. Azizi. 2016. “Solving Group Scheduling Problem in No-Wait Flexible Flowshop with Random Machine Breakdown.” Decision Science Letters 5 (1): 157–168. doi: 10.5267/j.dsl.2015.7.001
  • Andrés, C., J. M. Albarracín, G. Tormo, E. Vicens, and J. P. García-Sabater. 2005. “Group Technology in a Hybrid Flowshop Environment: A Case Study.” European Journal of Operational Research 167 (1): 272–281. doi: 10.1016/j.ejor.2004.03.026
  • Behnamian, J., M. Zandieh, and S. M. T. Fatemi Ghomi. 2010. “Due Windows Group Scheduling Using an Effective Hybrid Optimization Approach.” International Journal of Advanced Manufacturing Technology 46 (5–8): 721–735. doi: 10.1007/s00170-009-2147-z
  • Bozorgirad, M. A., and R. Logendran. 2016. “A Comparison of Local Search Algorithms with Population-Based Algorithms in Hybrid Flow Shop Scheduling Problems with Realistic Characteristics.” International Journal of Advanced Manufacturing Technology 83 (5–8): 1135–1151. doi: 10.1007/s00170-015-7650-9
  • Cassady, C. R., and E. Kutanoglu. 2005. “Integrating Preventive Maintenance Planning and Production Scheduling for a Single Machine.” IEEE Transactions on Reliability 54 (2): 304–309. doi: 10.1109/TR.2005.845967
  • Dasgupta, P., and S. Das. 2015. “A Discrete Inter-species Cuckoo Search for Flowshop Scheduling Problems.” Computers and Operations Research 60: 111–120. doi: 10.1016/j.cor.2015.01.005
  • Ebrahimi, M., S. M. T. Fatemi Ghomi, and B. Karimi. 2014. “Hybrid Flow Shop Scheduling with Sequence Dependent Family Setup Time and Uncertain due Dates.” Applied Mathematical Modelling 38 (9–10): 2490–2504. doi: 10.1016/j.apm.2013.10.061
  • Feng, H., W. Da, H. Huang, L. Xi, and E. Pan. 2016. “Joint Optimization of Flowshop Sequence-Dependent Manufacturing Cell Scheduling and Preventive Maintenance.” In Proceedings of the 2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 946–950. Piscataway, NJ: IEEE.
  • Feng, H., L. Xi, L. Xiao, T. Xia, and E. Pan. 2018. “Imperfect Preventive Maintenance Optimization for Flexible Flowshop Manufacturing Cells Considering Sequence-Dependent Group Scheduling.” Reliability Engineering & System Safety 176: 218–229. doi: 10.1016/j.ress.2018.04.004
  • Gultekin, H., A. Tula, and M. Selim Akturk. 2016. “Automated Robotic Assembly Line Design with Unavailability Periods and Tool Changes.” European Journal of Industrial Engineering 10 (4): 499–526. doi: 10.1504/EJIE.2016.078142
  • Karimi, N., M. Zandieh, and H. R. Karamooz. 2010. “Bi-objective Group Scheduling in Hybrid Flexible Flowshop: A Multi-phase Approach.” Expert Systems with Applications 37 (6): 4024–4032. doi: 10.1016/j.eswa.2009.09.005
  • Keshavarz, T., and N. Salmasi. 2013. “Makespan Minimisation in Flexible Flowshop Sequence-Dependent Group Scheduling Problem.” International Journal of Production Research 51 (20): 6182–6193. doi: 10.1080/00207543.2013.825055
  • Keshavarz, T., N. Salmasi, and M. Varmazyar. 2014. “Minimizing Total Completion Time in the Flexible Flowshop Sequence-Dependent Group Scheduling Problem.” Annals of Operations Research 226 (1): 351–377. doi: 10.1007/s10479-014-1667-6
  • Khamseh, A., F. Jolai, and M. Babaei. 2015. “Integrating Sequence-Dependent Group Scheduling Problem and Preventive Maintenance in Flexible Flow Shops.” International Journal of Advanced Manufacturing Technology 77 (1–4): 173–185. doi: 10.1007/s00170-014-6429-8
  • Liao, W., X. Zhang, and M. Jiang. 2017. “Multi-objective Group Scheduling Optimization Integrated with Preventive Maintenance.” Engineering Optimization 49 (11): 1890–1904. doi: 10.1080/0305215X.2017.1280258
  • Logendran, R., S. Carson, and E. Hanson. 2005. “Group Scheduling in Flexible Flow Shops.” International Journal of Production Economics 96 (2): 143–155. doi: 10.1016/j.ijpe.2004.03.011
  • Logendran, R., P. Deszoeke, and F. Barnard. 2006. “Sequence-Dependent Group Scheduling Problems in Flexible Flow Shops.” International Journal of Production Economics 102 (1): 66–86. doi: 10.1016/j.ijpe.2005.02.006
  • Logendran, R., N. Salmasi, and C. Sriskandarajah. 2006. “Two-Machine Group Scheduling Problems in Discrete Parts Manufacturing with Sequence-Dependent Setups.” Computers and Operations Research 33 (1): 158–180. doi: 10.1016/j.cor.2004.07.004
  • Pan, Ershun, Wenzhu Liao, and Lifeng Xi. 2012. “A Joint Model of Production Scheduling and Predictive Maintenance for Minimizing Job Tardiness.” International Journal of Advanced Manufacturing Technology 60 (9–12): 1049–1061. doi: 10.1007/s00170-011-3652-4
  • Shahvari, O., and R. Logendran. 2016. “Hybrid Flow Shop Batching and Scheduling with a Bi-criteria Objective.” International Journal of Production Economics 179: 239–258. doi: 10.1016/j.ijpe.2016.06.005
  • Shahvari, O., N. Salmasi, R. Logendran, and B. Abbasi. 2012. “An Efficient Tabu Search Algorithm for Flexible Flow Shop Sequence-Dependent Group Scheduling Problems.” International Journal of Production Research 50 (15): 4237–4254. doi: 10.1080/00207543.2011.604051
  • Tang, L., and X. Wang. 2010. “An Improved Particle Swarm Optimization Algorithm for the Hybrid Flowshop Scheduling to Minimize Total Weighted Completion Time in Process Industry.” IEEE Transactions on Control Systems Technology 18 (6): 1303–1314.
  • Wang, J. B., and X. X. Liang. 2018. “Group Scheduling with Deteriorating Jobs and Allotted Resource Under Limited Resource Availability Constraint.” Engineering Optimization. doi:10.1080/0305215X.2018.1454442
  • Yang, X. S., and S. Deb. 2009. “Cuckoo Search via Lévy Flights.” Paper presented at the 2009 World Congress on Nature & Biologically Inspired Computing (NaBIC), Coimbatore, India, December 9–11.
  • Zandieh, M., and N. Karimi. 2011. “An Adaptive Multi-population Genetic Algorithm to Solve the Multi-objective Group Scheduling Problem in Hybrid Flexible Flowshop with Sequence-Dependent Setup Times.” Journal of Intelligent Manufacturing 22 (6): 979–989. doi: 10.1007/s10845-009-0374-7

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.