264
Views
1
CrossRef citations to date
0
Altmetric
Research Article

Optimizing site selection for construction demolition waste treatment plants considering demand and supply uncertainty: a case study in Chongqing, China

, ORCID Icon, ORCID Icon, &
Pages 199-218 | Received 24 May 2022, Accepted 09 Nov 2022, Published online: 07 Dec 2022

References

  • Ali, I., A. Islam, S. M. Ali, and S. Adnan. 2022. “Identification and Selection of Suitable Landfill Sites Using GIS-Based Multi-criteria Decision Analysis in the Peshawar District, Pakistan.” Waste Management Research, 734242X221124069. doi:10.1177/0734242X221124069.
  • Asefi, H., S. Lim, M. Maghrebi, and S. Shahparvari. 2019. “Mathematical Modelling and Heuristic Approaches to the Location-Routing Problem of a Cost-Effective Integrated Solid Waste Management.” Annals of Operations Research 273 (1-2): 75–110. doi:10.1007/s10479-018-2912-1.
  • Ayvaz, B., B. Bolat, and N. Aydin. 2015. “Stochastic Reverse Logistics Network Design for Waste of Electrical and Electronic Equipment.” Resources Conservation and Recycling 104: 391–404. doi:10.1016/j.resconrec.2015.07.006.
  • Ben-Tal, A., and A. Nemirovski. 2000. “Robust Solutions of Linear Programming Problems Contaminated with Uncertain Data.” Mathematical Programming 88 (3): 411–424. doi:10.1007/pl00011380.
  • Bertsimas, D., and M. Sim. 2004. “The Price of Robustness.” Operations Research 52 (1): 35–53. doi:10.1287/opre.1030.0065.
  • Chongqing Statistical Yearbook. 2020. Accessed by January 27, 2022. http://tjj.cq.gov.cn/zwgk_233/tjnj/tjnj.html?url=http://tjj.cq.gov.cn/zwgk_233/tjnj/2020/indexch.htm
  • Du, B., and H. Zhou. 2018. “A Robust Optimization Approach to the Multiple Allocation p-Center Facility Location Problem.” Symmetry-Basel 10 (11): 588. doi:10.3390/sym10110588.
  • Elshehawy, Shimaa K., Elbadr O. Elgendi, and Ahmed S. Shehata. 2022. “Construction Waste Management: For Biodiesel Production Process.” Energy Reports 8: 67–76. doi:10.1016/j.egyr.2022.06.095.
  • Gabrel, V., C. Murat, and A. Thiele. 2014. “Recent Advances in Robust Optimization: An Overview.” European Journal of Operational Research 235 (3): 471–483. doi:10.1016/j.ejor.2013.09.036.
  • Gorissen, Bram L., İhsan Yanıkoğlu, and Dick den Hertog. 2015. “A Practical Guide to Robust Optimization.” Omega 53: 124–137. doi:10.1016/j.omega.2014.12.006.
  • Guo, F., J. W. Wang, and Y. H. Song. 2022. “How to Promote Sustainable Development of Construction and Demolition Waste Recycling Systems: Production Subsidies or Consumption Subsidies.” Sustainable Production and Consumption 32: 407–423. doi:10.1016/j.spc.2022.05.002.
  • Habibi, F., E. Asadi, S. J. Sadjadi, and F. Barzinpour. 2017. “A Multi-objective Robust Optimization Model for Site-Selection and Capacity Allocation of Municipal Solid Waste Facilities: A Case Study in Tehran.” Journal of Cleaner Production 166: 816–834. doi:10.1016/j.jclepro.2017.08.063.
  • Han, Y. T., H. X. Zheng, Y. C. Huang, and X. W. Li. 2022. “Considering Consumers’ Green Preferences and Government Subsidies in the Decision Making of the Construction and Demolition Waste Recycling Supply Chain: A Stackelberg Game Approach.” Buildings 12: 6. doi:10.3390/buildings12060832.
  • He, J., W. Zhong, Y. H. Zhang, S. T. Chen, and X. Ji. 2018. “Recouse Recycle Analysis on Construction and Demolition Waste in China Based on Material Flow and Whole Process Management.” Environmental Engineering 36 (10): 102–107. doi:10.13205/j.hjgc.201810020.
  • Hu, C. L., X. Liu, and J. Lu. 2017. “A Bi-objective Two-Stage Robust Location Model for Waste-to-Energy Facilities Under Uncertainty.” Decision Support Systems 99: 37–50. doi:10.1016/j.dss.2017.05.009.
  • Hu, M. M., F. Peng, and P. C. Xiang. 2020. “Estimation of Construction and Demolition Waste Generation and Site Optimization of Recycling Plants: A Case Study of Chongqing Metropolis, China.” Environmental Engineering 38 (01): 122–127. doi:10.13205/j.hjgc.202001019.
  • Hu, J., Z. B. Xiao, R. J. Zhou, W. J. Deng, M. X. Wang, and S. S. Ma. 2011. “Ecological Utilization of Leather Tannery Waste with Circular Economy Model.” Journal of Cleaner Production 19 (2–3): 221–228. doi:10.1016/j.jclepro.2010.09.018.
  • Jia, S. 2012. “Analysis of Current Situation and Research on Comprehensive Utilization of Construction Waste in Chongqing.” Master, Chongqing University, Cnki.
  • Li, L. J., Q. Z. Lin, and Z. Ming. 2022. “A Survey of Artificial Immune Algorithms for Multi-objective Optimization.” Neurocomputing 489: 211–229. doi:10.1016/j.neucom.2021.08.154.
  • Liang, J., and M. Liu. 2018. “Network Design for Municipal Solid Waste Collection: A Case Study of the Nanjing Jiangbei New Area.” International Journal of Environmental Research and Public Health 15 (12): 2812. doi:10.3390/ijerph15122812.
  • Lin, Z., Q. Xie, Y. Feng, P. Zhang, and P. Yao. 2020. “Towards a Robust Facility Location Model for Construction and Demolition Waste Transfer Stations Under Uncertain Environment: The Case of Chongqing.” Waste Management 105: 73–83. doi:10.1016/j.wasman.2020.01.037.
  • Nanda, M. A., A. K. Wijayanto, H. Imantho, L. O. Nelwan, I. W. Budiastra, and K. B. Seminar. 2022. “Factors Determining Suitable Landfill Sites for Energy Generation from Municipal Solid Waste: A Case Study of Jabodetabek Area, Indonesia.” Scientific World Journal 2022: 9184786. doi:10.1155/2022/9184786.
  • Pouriani, S., E. Asadi-Gangraj, and M. M. Paydar. 2019. “A Robust Bi-level Optimization Modelling Approach for Municipal Solid Waste Management; A Real Case Study of Iran.” Journal of Cleaner Production 240: 118125. doi:10.1016/j.jclepro.2019.118125.
  • Rahimi, M., and V. Ghezavati. 2018. “Sustainable Multi-period Reverse Logistics Network Design and Planning Under Uncertainty Utilizing Conditional Value at Risk (CVaR) for Recycling Construction and Demolition Waste.” Journal of Cleaner Production 172: 1567–1581. doi:10.1016/j.jclepro.2017.10.240.
  • Ren, Y., X. Yuan, and R. Lin. 2021. “A Novel MADM Algorithm for Landfill Site Selection Based on q-Rung Orthopair Probabilistic Hesitant Fuzzy Power Muirhead Mean Operator.” PLoS One 16 (10): e0258448. doi:10.1371/journal.pone.0258448.
  • Saad, A., M. Bal, and J. Khatib. 2022. “The Need for a Proper Waste Management Plan for the Construction Industry: A Case Study in Lebanon.” Sustainability 14 (19): 12783. doi:10.3390/su141912783.
  • Shen, H., Y. Peng, and C. X. Guo. 2018. “Analysis of the Evolution Game of Construction and Demolition Waste Recycling Behavior Based on Prospect Theory Under Environmental Regulation.” International Journal of Environmental Research and Public Health 15: 7. doi:10.3390/ijerph15071518.
  • Shi, S. Y. 2013. “Research for a Promotion Mechanism of Construction and Demolition Waste Recycling in Chongqing.” Master, Chongqing University, Cnki.
  • Shi, Q. W., H. Ren, X. R. Ma, and Y. Q. Xiao. 2019. “Site Selection of Construction Waste Recycling Plant.” Journal of Cleaner Production 227: 532–542. doi:10.1016/j.jclepro.2019.04.252.
  • Soyster, A. L. 1973. “Convex Programming with Set-Inclusive Constraints and Appplications to Inexact Linear Programming.” Operations Research 21 (5): 1154–1157. doi:10.1287/opre.21.5.1154.
  • Tai, G., S. Nalong, W. Varmari, F. Samoak, A. Peter, and M. Koisen. 2014. 2014 Annual Report: Teachers Savings and Loan Society Ltd.
  • Toso, E. A. V., and D. Alem. 2014. “Effective Location Models for Sorting Recyclables in Public Management.” European Journal of Operational Research 234 (3): 839–860. doi:10.1016/j.ejor.2013.10.035.
  • Trochu, J., A. Chaabane, and M. Ouhimmou. 2018. “Reverse Logistics Network Redesign Under Uncertainty for Wood Waste in the CRD Industry.” Resources Conservation and Recycling 128: 32–47. doi:10.1016/j.resconrec.2017.09.011.
  • Wang, M., H. Jiang, Y. Z. Li, S. T. Wu, and L. Xia. 2022. “Location Determination of Hierarchical Service Facilities Using a Multi-layered Greedy Heuristic Approach.” Engineering Optimization. Advance online publication. doi:10.1080/0305215X.2022.2086540.
  • Waskow, R., V. G. Maciel, R. Tubino, and A. Passuello. 2021. “Environmental Performance of Construction and Demolition Waste Management Strategies for Valorization of Recycled Coarse Aggregate.” Journal of Environmental Management 295: 113094. doi:10.1016/j.jenvman.2021.113094.
  • Wu, J., C. Ma, D. Z. Zhang, and Y. Xu. 2018. “Municipal Solid Waste Management and Greenhouse gas Emission Control Through an Inexact Optimization Model Under Interval and Random Uncertainties.” Engineering Optimization 50 (11): 1963–1977. doi:10.1080/0305215x.2017.1419347.
  • Xiang, W., Y. M. Yang, and J. Liu. 2020. “Research on Present Situation and Production Predict of Construction and Demolition Debris in Chongqing.” Environmental Sanitation Engineering 28 (02): 105–109. doi:10.19841/j.cnki.hjwsgc.2020.04.019.
  • Yıldız, A. R. 2009. “A New Design Optimization Framework Based on Immune Algorithm and Taguchi's Method.” Computers in Industry 60 (8): 613–620. doi:10.1016/j.compind.2009.05.016.
  • Zheng, H. X., X. W. Li, X. W. Zhu, Y. C. Huang, Z. L. Liu, Y. X. Liu, J. X. Liu, X. Y. Li, Y. J. Li, and C. H. Li. 2022. “Impact of Recycler Information Sharing on Supply Chain Performance of Construction and Demolition Waste Resource Utilization.” International Journal of Environmental Research and Public Health 19 (7): 3878. doi:10.3390/ijerph19073878.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.