154
Views
0
CrossRef citations to date
0
Altmetric
Research Article

An interval uncertainty optimization algorithm based on radial basis function network differentiation

, , , , &
Pages 896-918 | Received 15 Nov 2022, Accepted 23 Apr 2023, Published online: 15 May 2023

References

  • Birge, J., and François V. Louveaux. 1988. “A Multicut Algorithm for Two-Stage Stochastic Linear Programs.” European Journal of Operational Research 34: 384–392. doi:10.1016/0377-2217(88)90159-2.
  • Dantzig, George B. 1955. “Linear Programming under Uncertainty.” Management Science 1 (3-4): 197–206. doi:10.1287/mnsc.1.3-4.197.
  • Dong, C., G. H. Huang, Y. P. Cai, and Y. Xu. 2011. “An Interval-Parameter Minimax Regret Programming Approach for Power Management Systems Planning under Uncertainty.” Applied Energy 88 (8): 2835–2845. doi:10.1016/j.apenergy.2011.01.056.
  • Gunawan, Subroto. 2004. Parameter Sensitivity Measures for Single Objective, Multi-Objective, and Feasibility Robust Design Optimization. College Park: University of Maryland.
  • Hai-feng, Zhang. 2011. “Study of the Turbulence Model Optimization Based on Multi-island Genetic Algorithm.” Journal of Hunan University. Article number 1674–2974 (2011) 02-0023-07.
  • Hashem, Sherif. 1992. “Sensitivity Analysis for Feed Forward Artificial Neural Networks with Differentiable Activation Functions.” Paper presented at the 1992 IJCNN international joint conference on neural networks. doi:10.1109/IJCNN.1992.287175.
  • Higle, Julia L. 2005. “Stochastic Programming: Optimization When Uncertainty Matters.” In Emerging Theory, Methods, and Applications, 30–53. Informs. doi:10.1287/educ.1053.0016.
  • Hornik, Kurt, Maxwell Stinchcombe, and Halbert White. 1989. “Multilayer Feedforward Networks Are Universal Approximators.” Neural Networks 2 (5): 359–366. doi:10.1016/0893-6080(89)90020-8.
  • Inuiguchi, M., H. Ichihashi, and H. Tanaka. 1990. “Fuzzy Programming: A Survey of Recent Developments.” In Stochastic versus Fuzzy Approaches to Multiobjective Mathematical Programming under Uncertainty, 45–68. doi:10.1007/978-94-009-2111-5_4.
  • Inuiguchi, Masahiro, and Masatoshi Sakawa. 1995. “Minimax Regret Solution to Linear Programming Problems with an Interval Objective Function.” European Journal of Operational Research 86 (3): 526–536. doi:10.1016/0377-2217(94)00092-Q.
  • Jiang, C., X. Han, F. J. Guan, and Y. H. Li. 2007. “An Uncertain Structural Optimization Method Based on Nonlinear Interval Number Programming and Interval Analysis Method.” Engineering Structures 29 (11): 3168–3177. doi:10.1016/j.engstruct.2007.01.020.
  • Jiang, C., X. Han, and G. R. Liu. 2007. “Optimization of Structures with Uncertain Constraints Based on Convex Model and Satisfaction Degree of Interval.” Computer Methods in Applied Mechanics and Engineering 196 (49-52): 4791–4800. doi:10.1016/j.cma.2007.03.024.
  • Jiang, Chao, Xue Han, G. R. Liu, and G. P. Liu. 2008. “A Nonlinear Interval Number Programming Method for Uncertain Optimization Problems.” European Journal of Operational Research 188 (1): 1–13. doi:10.1016/j.ejor.2007.03.031.
  • Jiang, C., Z. G. Zhang, Q. F. Zhang, Xue Han, H. C. Xie, and John Liu. 2014. “A New Nonlinear Interval Programming Method for Uncertain Problems with Dependent Interval Variables.” European Journal of Operational Research 238 (1): 245–253. doi:10.1016/j.ejor.2014.03.029.
  • Lai, Young-Jou, Ching-Lai Hwang, Young-Jou Lai, and Ching-Lai Hwang. 1992. Fuzzy Mathematical Programming. Springer Berlin Heidelberg.
  • Lai, Cheng-Shou, Jing Lu, and Yu Qiao. 2018. “Multi-Objective Assignment Optimization of Port Supply Chain Based on Interval Analysis.” Paper presented at the 2018 37th Chinese Control Conference (CCC). doi:10.23919/ChiCC.2018.8482791.
  • Lai, Kin Keung, S. Y. Wang, J. P. Xu, S. S. Zhu, and Yong Fang. 2002. “A Class of Linear Interval Programming Problems and Its Application to Portfolio Selection.” IEEE Transactions on Fuzzy Systems 10 (6): 698–704. doi:10.1109/TFUZZ.2002.805902.
  • Latifi, Morvarid, Gholamreza Rakhshandehroo, Mohammad Reza Nikoo, and Mojtaba Sadegh. 2019. “A Game Theoretical Low Impact Development Optimization Model for Urban Storm Water Management.” Journal of Cleaner Production 241: 118323. doi:10.1016/j.jclepro.2019.118323.
  • Leshno, Moshe, Vladimir Ya Lin, Allan Pinkus, and Shimon Schocken. 1993. “Multilayer Feedforward Networks with a Nonpolynomial Activation Function Can Approximate Any Function.” Neural Networks 6 (6): 861–867. doi:10.1016/S0893-6080(05)80131-5.
  • Li, Zi-xuan, Guo-lai Yang, Yu-meng Fan, and Jia-hao Li. 2021. “Irreversible Demagnetization Mechanism of Permanent Magnets during Electromagnetic Buffering.” Defence Technology 17 (3): 763–774. doi:10.1016/j.dt.2020.05.005.
  • Li, Zi-xuan, Guo-lai Yang, Feng-jie Xu, and Li-qun Wang. 2021. “Interval Uncertain Optimization for Damping Fluctuation of a Segmented Electromagnetic Buffer under Intensive Impact Load.” Defence Technology 17 (3): 884–897. doi:10.1016/j.dt.2020.05.018.
  • Liu, Dongliang, and Zhiping Qiu. 2021. “A Subinterval Dimension-Wise Method for Robust Topology Optimization of Structures with Truss-Like Lattice Material under Unknown but Bounded Uncertainties.” Structural and Multidisciplinary Optimization 64 (3): 1241–1258. doi:10.1007/s00158-021-02911-5.
  • Long, X. Y., Chao Jiang, Xu Han, J. C. Tang, and F. J. Guan. 2018. “An Enhanced Subinterval Analysis Method for Uncertain Structural Problems.” Applied Mathematical Modelling 54: 580–593. doi:10.1016/j.apm.2017.10.017.
  • Ma, L. H. 2002. “Research on Method and Application of Robust Optimization for Uncertain System.” PhD diss., Zhejiang University.
  • Park, Jooyoung, and Irwin W. Sandberg. 1991. “Universal Approximation Using Radial-Basis-Function Networks.” Neural Computation 3 (2): 246–257. doi:10.1162/neco.1991.3.2.246.
  • Qiu, Zhiping, and Xiaojun Wang. 2005. “Parameter Perturbation Method for Dynamic Responses of Structures with Uncertain-but-Bounded Parameters Based on Interval Analysis.” International Journal of Solids and Structures 42 (18-19): 4958–4970. doi:10.1016/j.ijsolstr.2005.02.023.
  • Quan, Zhang, Fan Zhiping, and Pan Dehui. 1995. “A Ranking Approach for Interval Numbers in Uncertain Multiple Attribute Decision Making Problems.” Systems Engineering Theory and Practice 5 (5): 129–133. doi:10.12011/1000-6788(1999)5-129.
  • Rommelfanger, Heinrich, Randolf Hanuscheck, and Jochen Wolf. 1989. “Linear Programming with Fuzzy Objectives.” Fuzzy Sets and Systems 29 (1): 31–48. doi:10.1016/0165-0114(89)90134-6.
  • Tanaka, Hideo, Tetsuji Okuda, and Kiyoji Asai. 1973. “Fuzzy Mathematical Programming.” Transactions of the Society of Instrument and Control Engineers 9 (5): 607–613. doi:10.9746/sicetr1965.9.607
  • Wang, Liqun, Zengtao Chen, Guolai Yang, Qinqin Sun, and Jianli Ge. 2020. “An Interval Uncertain Optimization Method Using Back-Propagation Neural Network Differentiation.” Computer Methods in Applied Mechanics and Engineering 366: 113065. doi:10.1016/j.cma.2020.113065.
  • Wang, Lei, Chuang Xiong, Xiaojun Wang, Menghui Xu, and Yunlong Li. 2018. “A Dimension-Wise Method and Its Improvement for Multidisciplinary Interval Uncertainty Analysis.” Applied Mathematical Modelling 59: 680–695. doi:10.1016/j.apm.2018.02.022.
  • Zhao, Ziheng, Xu Han, and Jiang Chao. 2010. “A Nonlinear Interval Number Programming Method Based on RBF Global Optimization Technique.” Paper presented at the AIP conference proceedings. doi:10.1063/1.3452108.
  • Zhou, Y. T., C. Jiang, and X. Han. 2006. “Interval and Subinterval Analysis Methods of the Structural Analysis and Their Error Estimations.” International Journal of Computational Methods 3 (02): 229–244. doi:10.1142/S0219876206000771.
  • Zimmermann, H.-J. 1978. “Fuzzy Programming and Linear Programming with Several Objective Functions.” Fuzzy Sets and Systems 1 (1): 45–55. doi:10.1016/0165-0114(78)90031-3.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.