References
- Cohen T. Benchmark indicators for medical equipment repair and maintenance. Biomedical Instrumentation and Technology 1995; 29: 308–320
- ECRI. Why management of equipment service is important?. Health Technology Management Spring, 1990; 1–5
- ECRI. In house servicing of X-ray and CT equipment. Health Technology Management Winter, 1993; 2–17
- O'Dea W. S., Hoaglund L. Clinical Engineering Management: An annotated Bibliography 1989 – 1993. Biomedical Instrumentation and Technology 1994; 10: 101–111
- Miguel A., Denis E. R., Sanchez V. M. Management of service contracts using an independent service provider (ISP) as support technology. Journal of Clinical Engineering 2002; 27: 202–209
- James J. P. Equipment management risk rating system based on engineering endpoints. Biomedical Instrumentation and Technology 1999; 7: 115–120
- Almeida A. T. Repair contract decision model through additive utility function. Journal of Quality in Maintenance in Engineering 2001; 7: 42–48
- Page F. H. Dominant strategy mechanisms for contract auctions with risk aversion and moral hazard. Game Theory 1985; 23: 25–42
- Beolchi L. Telemedicine Glossary, European Commission3rd edn. Belgium, Brussels 2001; 17–18, Working Document
- Clua M. F. Quality control for clerical operations. Industrial Quality Control Review, Wisconsin 1985; 21(2)32–36
- Mosquera C. G. Disponibilidad y confiabilidad de sistemas industriales3rd edn. Venezuela, Valencia 1995; 52–60
- User's Guide Version 2. Fuzzy Logic Toolbox for use with MATLAB 5.3. For Use with Matlab. The Mathworks Inc., 1997.