References
- Aly, A. A., M. A. Mahmoud, and W. H. Woodall. 2015. A comparison of the performance of phase II simple linear profile control charts when parameters are estimated. Communications in Statistics-Simulation and Computation 44 (6):1432–40.
- Amiri, A., M. Koosha, and A. Azhdari. 2011. Profile monitoring for poisson responses. Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), Singapore, Singapore: IEEE, pp. 1481–84.
- Amiri, A., M. Koosha, and A. Azhdari. 2012. T2 based methods for monitoring gamma profiles. Proceedings of the International conference on Industrial Engineering and Operations Management.
- Amiri, A., M. Koosha, A. Azhdari, and G. Wang. 2015. Phase I monitoring of generalized linear model-based regression profiles. Journal of Statistical Computation and Simulation 85 (14):2839–59.
- Amiri, A., F. Sogandi, and M. Ayoubi. 2016. Simultaneous monitoring of correlated multivariate linear and GLM regression profiles in phase II. Quality Technology & Quantitative Management 1–24. doi: 10.1080/16843703.2016.1226706.
- Capizzi, G., and G. Masarotto. 2010. Combined Shewhart–EWMA control charts with estimated parameters. Journal of Statistical Computation and Simulation 80 (7):793–807.
- Castagliola, P., and S. Wu. 2012. Design of the c and np charts when the parameters are estimated. International Journal of Reliability, Quality and Safety Engineering 19 (2):1250010.
- Chakraborti, S., and S. W. Human. 2006. Parameter estimation and performance of the p-chart for attributes data. IEEE Transactions on Reliability 55 (3):559–66.
- Chakraborti, S., and S. W. Human. 2008. Properties and performance of the c-chart for attributes data. Journal of Applied Statistics 35 (1):89–100.
- Chen, Y., J. B. Birch, and W. H. Woodall. 2016. Effect of phase I estimation on phase II control chart performance with profile data. Quality and Reliability Engineering International 32 (1):79–87.
- Ghashghaei, R., and A. Amiri. 2017. Sum of squares control charts for monitoring of multivariate multiple linear regression profiles in phase II. Quality and Reliability Engineering International 33 (4):767–84.
- Huwang, L., Y. H. T. Wang, A. B. Yeh, and Y. H. Huang. 2016. Phase II profile monitoring based on proportional odds models. Computers & Industrial Engineering 98:543–53.
- Jensen, W. A., L. A. Jones-Farmer, C. W. Champ, and W. H. Woodall. 2006. Effects of parameter estimation on control chart properties: A literature review. Journal of Quality Technology 38 (4):349–64.
- Kang, L., and S. L. Albin. 2000. On-line monitoring when the process yields a linear profile. Journal of Quality Technology 32 (4):418–26.
- Kim, K., M. A. Mahmoud, and W. H. Woodall. 2003. On the monitoring of linear profiles. Journal of Quality Technology 35 (3):317–28.
- Koosha, M., and A. Amiri. 2013. Generalized linear mixed model for monitoring autocorrelated logistic regression profiles. The International Journal of Advanced Manufacturing Technology 64 (1–4):487–95.
- Mahmoud, M. A. 2012. The performance of phase II simple linear profile approaches when parameters are estimated. Communications in Statistics-Simulation and Computation 41 (10):1816–33.
- Mahmoud, M. A., J. P. Morgan, and W. H. Woodall. 2010. The monitoring of simple linear regression profiles with two observations per sample. Journal of Applied Statistics 37 (8):1249–63.
- Maleki, M. R., A. Amiri, and A. R. Taheriyoun. 2017a. Identifying the time of step change and drift in phase II monitoring of autocorrelated logistic regression profiles. To appear in Scientia Iranica.
- Maleki, M. R., A. Amiri, and A. R. Taheriyoun. 2017b. Phase II monitoring of binary profiles in the presence of within-profile autocorrelation based on Markov model. Communications in Statistics-Simulation and Computation 46 (10):7710–32
- Maleki, M. R., A. Amiri, A. R. Taheriyoun, and P. Castagliola. 2017c. Phase I monitoring and change point estimation of autocorrelated poisson regression profiles. To appear in Communications in Statistics-Theory and Methods. Available at: https://doi.org/10.1080/03610926.2017.1402052
- Maravelakis, P. E., and P. Castagliola. 2009. An EWMA chart for monitoring the process standard deviation when parameters are estimated. Computational statistics & data analysis 53 (7):2653–64.
- Noorossana, R., M. Aminnayeri, and H. Izadbakhsh. 2013. Statistical monitoring of polytomous logistic profiles in phase II. Scientia Iranica 20 (3):958–66.
- Noorossana, R., M. Aminmadani, and A. Saghaei. 2016. Effect of phase I estimation eerror on the mmonitoring of simple linear profiles in phase II. The International Journal of Advanced Manufacturing Technology 84 (5–8):873–84.
- Noorossana, R., A. Saghaei, and A. Amiri. 2011. Statistical analysis of profile monitoring. Vol. 865. Hoboken, New Jersey, USA: John Wiley & Sons.
- Panza, C. A., and J. A. Vargas. 2016. Monitoring the shape parameter of a Weibull regression model in phase II processes. Quality and Reliability Engineering International 32 (1):195–207.
- Paynabar, K., and A. B. Yeh. 2012. Phase I risk-adjusted control charts for monitoring surgical performance by considering categorical covariates. Journal of Quality Technology 44 (1):39–53.
- Psarakis, S., A. K. Vyniou, and P. Castagliola. 2014. Some recent developments on the effects of parameter estimation on control charts. Quality and Reliability Engineering International 30 (8):1113–29.
- Qi, D., Z. Wang, X. Zi, and Z. Li. 2016. Phase II monitoring of generalized linear profiles using weighted likelihood ratio charts. Computers & Industrial Engineering 94:178–87.
- Rakitzis, A. C., and P. Castagliola. 2016. The effect of parameter estimation on the performance of one-sided Shewhart control charts for zero-inflated processes. Communications in Statistics-Theory and Methods 45 (14):4194–214.
- Saghaei, A., M. M. Rezazadeh-Saghaei, R. Noorossana, and M. Dorri. 2012. Phase II logistic profile monitoring. International Journal of Industrial Engineering 23 (4):291–99.
- Shadman, A., H. Mahlooji, A. B. Yeh, and C. Zou. 2015. A change point method for monitoring generalized linear profiles in phase I. Quality and Reliability Engineering International 31 (8):1367–81.
- Shadman, A., C. Zou, H. Mahlooji, and A. B. Yeh. 2017. A change point method for phase II monitoring of generalized linear profiles. Communications in Statistics-Simulation and Computation 46 (1):559–78.
- Shang, Y., F. Tsung, and C. Zou. 2011. Profile monitoring with binary data and random predictors. Journal of Quality Technology 43 (3):196–208.
- Sharafi, A., M. Aminnayeri, and A. Amiri. 2013. An MLE approach for estimating the time of step changes in poisson regression profiles. Scientia Iranica 20 (3):855–60.
- Soleymanian, M. E., M. Khedmati, and H. Mahlooji. 2013. Phase II monitoring of binary response profiles. Scientia Iranica. Transaction E, Industrial Engineering 20 (6):2238–46.
- Woodall, W. H. 2007. Current research on profile monitoring. Production 17 (3):420–25.
- Xu, L., S. Wang, Y. Peng, J. P. Morgan, J. R. Reynolds, and W. H. Woodall. 2012. The monitoring of linear profiles with a GLR control chart. Journal of Quality Technology 44 (4):348–62.
- Yeh, A. B., L. Huwang, and Y. M. Li. 2009. Profile monitoring for a binary response. IIE Transactions 41 (11):931–41.
- Zhang, Y., P. Castagliola, Z. Wu, and M. B. C. Khoo. 2011. The synthetic chart with estimated parameters. IIE Transactions 43 (9):676–87.
- Zhang, J., Z. Li, and Z. Wang. 2009. Control chart based on likelihood ratio for monitoring linear profiles. Computational statistics & data analysis 53 (4):1440–48.
- Zhang, M., Y. Peng, A. Schuh, F. M. Megahed, and W. H. Woodall. 2013. Geometric charts with estimated control limits. Quality and Reliability Engineering International 29 (2):209–23.
- Zou, C., F. Tsung, and Z. Wang. 2007. Monitoring general linear profiles using multivariate exponentially weighted moving average schemes. Technometrics 49 (4):395–408.