References
- Chew, X. Y., M. B. C. Khoo, S. Y. Teh, and M. H. Lee. 2016. The run sum hotelling’s χ2 control chart with variable sampling intervals. Quality and Reliability Engineering International 32 (7):2573–90. doi:https://doi.org/10.1002/qre.1960.
- Duncan, A. J. 1956. The economic design of X¯ charts used to maintain current control of a process. Journal of the American Statistical Association 51 (274):228–42.
- Franco, B. C., G. Celano, P. Castagliola, and A. F. B. Costa. 2014. Economic design of shewhart control charts for monitoring autocorrelated data with skip sampling strategies. International Journal of Production Economics 151:121–30. doi:https://doi.org/10.1016/j.ijpe.2014.02.008.
- Guo, B., and B. X. Wang. 2016. The variable sampling interval s2 chart with known or unknown in-control variance. International Journal of Production Research 54 (11):1–15.
- Ho, L. L., and R. da Costa Quinino. 2016. Combining attribute and variable data to monitor process variability: Mix S2 control chart. The International Journal of Advanced Manufacturing Technology 87 (9–12):3389–96. doi:https://doi.org/10.1007/s00170-016-8702-5.
- Ho, L. L., and R. C. Quinino. 2013. An attribute control chart for monitoring the variability of a process. International Journal of Production Economics 145 (1):263–7. doi:https://doi.org/10.1016/j.ijpe.2013.04.046.
- Kennedy, C. W., E. G. Hoffman, and S. D. Bond. 1987. Inspection and gaging. New York: Industrial Press Inc.
- Lorenzen, T. J., and L. C. Vance. 1986. The economic design of control charts: A unified approach. Technometrics 28 (1):3–10. doi:https://doi.org/10.1080/00401706.1986.10488092.
- Montgomery, D. C. 2005. Introduction to statistical quality control. New York: Wiley & Sons.
- Niaki, S. T. A., M. J. Ershadi, and M. Malaki. 2010. Economic and economic-statistical designs of MEWMA control chartsa hybrid Taguchi loss, markov chain, and genetic algorithm approach. The International Journal of Advanced Manufacturing Technology 48 (1-4):283–96. doi:https://doi.org/10.1007/s00170-009-2288-0.
- Niaki, S. T. A., F. M. Gazaneh, and M. Toosheghanian. 2014. A parameter-tuned genetic algorithm for economic-statistical design of variable sampling interval x-bar control charts for non-normal correlated samples. Communications in Statistics-Simulation and Computation 43 (5):1212–40. doi:https://doi.org/10.1080/03610918.2012.732176.
- Patil, S., and D. Shirke. 2017. Economic design of variable sampling interval sign control chart. Journal of Industrial and Production Engineering 34 (4):253–60. doi:https://doi.org/10.1080/21681015.2016.1253621.
- Rasay, H., M. S. Fallahnezhad, and Y. Zare Mehrjerdi. 2018. An integrated model for economic design of chi-square control chart and maintenance planning. Communications in Statistics-Theory and Methods 47 (12):2892–907. doi:https://doi.org/10.1080/03610926.2017.1343848.
- Reynolds, M. R., R. W. Amin, J. C. Arnold, and J. A. Nachlas. 1988. X-bar Charts with variable sampling intervals. Technometrics 30 (2):181–92. doi:https://doi.org/10.1080/00401706.1988.10488366.
- Safe, H., R. B. Kazemzadeh, and Y. G. Kanani. 2018. A markov chain approach for double-objective economic statistical design of the variable sampling interval x control chart. Communication in Statistics- Theory and Methods 47 (2):277–88. doi:https://doi.org/10.1080/03610926.2016.1235197.
- Sampaio, E. S., L. L. Ho, and P. G. Medeiros. 2015. A combined npx−X¯ control chart to monitor the process mean in a two-stage sampling. Quality and Reliability Engineering International 30 (7):1003–13. doi:https://doi.org/10.1002/qre.1528.
- Tavakoli, M., R. Pourtaheri, and M. B. Moghadam. 2016. Economic and economi-statistical designs of VSI bayesian control chart using monte carlo method and abc algorithm. Journal of Statistical Computation & Simulation 87 (4):766–76. doi:https://doi.org/10.1080/00949655.2016.1225069.
- Wan, Q., Y. Wu, W. Zhou, and X. Chen. 2018. Economic design of an integrated adaptive synthetic chart and maintenance management system. Communications in Statistics-Theory and Methods 47 (11):2625–42. doi:https://doi.org/10.1080/03610926.2016.1271425.
- Wu, Z., M. B. C. Khoo, L. Shu, and W. Jiang. 2009. An np control chart for monitoring the mean of a variable based on an attribute inspection. International Journal of Production Economics 121 (1):141–7. doi:https://doi.org/10.1016/j.ijpe.2009.04.021.
- Yang, S. F. 2013. Using a new VSI EWMA average loss control chart to monitor changes in the difference between the process mean and target and/or the process variability. Applied Mathematical Modelling 37 (16–17):7973–82. doi:https://doi.org/10.1016/j.apm.2013.03.023.
- Yu, F. J., M. A. Rahim, and H. Chin. 2007. Economic design of VSI X¯ control charts. International Journal of Production Research 45 (23):5639–48. doi:https://doi.org/10.1080/00207540701325512.
- Zhou, W., Q. Wan, Y. Zheng, and Y. W. Zhou. 2017. A joint-adaptive np control chart with multiple dependent state sampling scheme. Communication in Statistics- Theory and Methods 46 (14):6967–79. doi:https://doi.org/10.1080/03610926.2015.1132323.