References
- Amjady, N., and F. Keynia. 2010. Application of a new hybrid neuro-evolutionary system for day-ahead price forecasting of electricity markets. Applied Soft Computing Journal 10 (3):784–92. doi:10.1016/j.asoc.2009.09.008.
- Armstrong, J., and F. Collopy. 1992. Error measures for generalizing about forecasting methods: Empirical comparisons. International Journal of Forecasting 8 (1):69–80. doi:10.1016/0169-2070(92)90008-W.
- Bartolomei, S., and A. Sweet. 1989. A note on a comparison of exponential smoothing methods for forecasting seasonal series. International Journal of Forecasting 5 (1):111–6. doi:10.1016/0169-2070(89)90068-X.
- Box, G., and G. Jenkins. 1970. Time series analysis: Forecasting and control. San Francisco: Holden-Day.
- Chen, B., M. Chang, and C. Lin. 2004. Load forecasting using support vector machines: A study on eunite competition 2001. IEEE Transactions on Power Systems 19 (4):1821–30. doi:10.1109/TPWRS.2004.835679.
- Fildes, R. 1992. The evaluation of extrapolative forecasting methods. International Journal of Forecasting 8 (1):81–98. doi:10.1016/0169-2070(92)90009-X.
- Hjorth, U. 1982. Model selection and forward validation. Scandinavian Journal of Statistics 9:95–105.
- Lio, W., and B. Liu. 2018. Residual and confidence interval for uncertain regression model with imprecise observations. Journal of Intelligent & Fuzzy Systems 35 (2):2573–83. doi:10.3233/JIFS-18353.
- Liu, B. 2007. Uncertainty theory, 2nd ed. Berlin: Springer-Verlag.
- Liu, B. 2008. Fuzzy process, hybrid process and uncertain process. Journal of Uncertain Systems 2 (1):3–16.
- Liu, B. 2009a. Theory and practice of uncertain programming, 2nd ed. Berlin: Springer-Verlag.
- Liu, B. 2009b. Some research problems in uncertainty theory. Journal of Uncertain Systems 3 (1):3–10.
- Liu, B. 2015. Uncertainty theory, 4th ed. Berlin: Springer-Verlag.
- Liu, Z., and Y. Yang. 2020. Least absolute deviations estimation for uncertain regression with imprecise observations. Fuzzy Optimization and Decision Making 19 (1):33–52. doi:10.1007/s10700-019-09312-w.
- Liu, Z., and L. Jia. 2020. Cross-validation for the uncertain Chapman-Richards growth model with imprecise observations. International Journal of Uncertaint Fuzziness and Knowledge-Based Systemsy, to be published.
- Newbold, P., and C. Granger. 1974. Experience with forecasting univariate time-series and the combination of forecasts with discussion. Journal of the Royal Statistical Society 137 (2):131–65. doi:10.2307/2344546.
- Tashman, L. 2000. Out-of-sample tests of forecasting accuracy: An analysis and review. International Journal of Forecasting 16 (4):437–50. doi:10.1016/S0169-2070(00)00065-0.
- Wagenmakers, E., P. Grunwald, and M. Steyvers. 2006. Accumulative prediction error and the selection of time series models. Journal of Mathematical Psychology 50 (2):149–66. doi:10.1016/j.jmp.2006.01.004.
- Walker, G. 1931. On periodicity in series of related terms. Proceedings of the Royal Society of London, Series A, 131: 518–32.
- Yang, X., and B. Liu. 2019. Uncertain time series analysis with imprecise observations. Fuzzy Optimization and Decision Making 18 (3):263–78. doi:10.1007/s10700-018-9298-z.
- Yang, X., and Y. Ni. 2020. Least-squares estimation for uncertain moving average model. Communications in Statistics-Theory and Methods doi:10.1080/03610926.2020.1713373.
- Yao, K., and B. Liu. 2018. Uncertain regression analysis: An approach for imprecise observations. Soft Computing 22 (17):5579–82. doi:10.1007/s00500-017-2521-y.
- Yule, G. U. 1927. On a method of investigating periodicities in disturbed series with special reference to Wolfer’s sunspot numbers. Philosophical Transactions of the Royal Society of London 226:267–98.