133
Views
5
CrossRef citations to date
0
Altmetric
Original Articles

A Finite Horizon Dynamic Programming Model for Production and Repair Decisions

Pages 3302-3313 | Received 03 Feb 2012, Accepted 07 May 2012, Published online: 03 Jul 2014

References

  • Fallahnezhad, M.S., Niaki, S.T. A., Eshragh-Jahromi, A. (2007). A one-stage two machines replacement strategy based on the Bayesian inference method. J. Indust. Syst. Eng. 1:235–250.
  • Fallahnezhad, M.S., Niaki, S.T. A. (2011). A multi-stage two-machine replacement strategy using mixture models, Bayesian inference and stochastic dynamic programming. Commun. Statist. Theory Meth. 40(4):702–725.
  • Fallahnezhad, M.S., Niaki, S.T. A. (2011). A new machine replacement policy based on number of defective items and Markov chains. Iran. J. Operat. Res. 2(2):17–28.
  • Fallahnezhad, M.S., Niaki, S.T. A., Sadeghieh, A. (2012). A multi-stage single-machine replacement strategy using stochastic dynamic programming. J. Ind. Syst. Eng. 5(4):198–207.
  • Goldstein, T., Ladany, S.P., Mehrez, A. (1988). A discounted machine replacement model with an expected future technological breakthrough. Naval Res. Logist. Quart. 35:209–220.
  • Iravani, S., Duenyas, I. (2002). Integrated maintenance and production control of a deteriorating production system. IIE Trans. 34:423–435.
  • Ivy, J.S., Nembhard, H.B. (2005). A modeling approach to maintenance decisions using statistical quality control and optimization. Qual. Reliab. Eng. Int. 21:355–366.
  • Nair, V.N., Tang, B., Xu, L. (2001). Bayesian inference for some mixture problems in quality and reliability. J. Qual. Technol. 33:16–28.
  • Niaki, S.T. A., Fallahnezhad, M.S. (2007). A decision making framework in production processes using Bayesian inference and stochastic dynamic programming. J. Appl. Sci. 7:3618–3627.
  • Sethi, S.P., Suo, W., Taksar, M.I., Zhang, Q. (1997). Optimal production planning in a stochastic manufacturing system with long-run average cost. J. Optimiz. Theory Applic. 92:161–188.
  • Singh, M., Song, J.S., Yano, C., Moreno-Beltran, A. (2004). Production and repair decisions with time-consuming repair and a deadline. Working Paper. Available at: http://www0.gsb.columbia.edu/mygsb/faculty/research/pubfiles/5534/SinghCVAug2011.pdf.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.