91
Views
0
CrossRef citations to date
0
Altmetric
Original Articles

On the survival time of a repairable duplex system sustained by a cold standby unit subjected to a priority rule

&
Pages 7872-7886 | Received 27 Jun 2015, Accepted 08 Mar 2016, Published online: 21 Apr 2017

References

  • Abate, J., Witt, W. (1999). Infinite-series representations of Laplace transforms of probability density functions for numerical inversion. J. Oper. Res. Soc. Jpn. 42:268–281.
  • Amari, S.V., Pham, H. (2010). A new insight into a k-out-of-n warm standby model. Int. J. Performability Eng. 6(6):615–617.
  • Anisimov, V., Sztrik, J. (1969). Asymptotic analysis of some complex renewable systems in random environments. Eur. J. Oper. Res. 41:162–168.
  • Apostol, T.M. (1978). Mathematical Analysis. London: Addison-Wesley P.C.
  • Birolini, A. (2007). Reliability Engineering. Theory and Practice. Berlin: Springer.
  • Brémaud, P. (1991). Point Processes and Queues. Springer series in statistics. Berlin: Springer-Verlag.
  • Cao, J. (1987). Availability and failure frequency of a multi-unit parallel system. Asia-Pacific J. Oper. Res. 4:83–90.
  • Dhillon, B.S., Yang, N. (1969). Availability analysis of a robot with safety system. Microelectron. Reliab. 36(2):169–177.
  • Doetsch, G. (1970). Einführung in Theorie und Anwendung der Laplace-Tranformation. Basel: Birkhäuser Verlag.
  • Epstein, B., Weissmann, I. (2008). Mathematical Models for System Reliability. Baton Rouge: Chapman and Hall, CRC Press.
  • Gakhov, L.D. (1996). Boundary Value Problems. Oxford: Pergamon Press.
  • Gaver, D.P. (1963). Time to failure and availability of paralleled systems with repair. IEEE Trans. Reliab. 12:30–38.
  • Gnedenko, B.V., Ushakov, I.A. (1995). Probabilistic Reliability Engineering. Editor: J. Falk, New York City: John Wiley & Sons Inc.
  • Kim, D.S., Lee, S.M., Jung, J.-H., Kim, T.H., Lee, S., Park, J.S. (2012). Reliability and availability analysis for an on board computer in a satellite system using standby redundancy and rejuvenation. J. Mech. Sci. Technol. 26(7):2059–2063.
  • Leung, K.N.F., Zhang, Y.L., Lai, K.K. (2010). A bivariate optimal replacement policy for a cold standby repairable system with repair priority. Naval Res. Logist. 57:149–158.
  • Leung, K.N.F., Zhang, Y.L., Lai, K.K. (2011). Analysis for a two-dissimilar-component cold standby system with priority. Reliab. Eng. Syst. Saf. 96:314–321.
  • Ma, L., Xu, G., Mastorakis, N.E. (2011). Analysis of a detoriating cold standby system with priority. WSEAS Trans. Math. 10(2):84–91.
  • Ohashi, M., Nishida, T. (1980). A two unit paralleled system with general distributions. J. Oper. Res. Soc. Jpn. 23(4):313–325.
  • Ozaki, H., Kara, A., Cheng, Z. (2012). User-perceived reliability of unrepairable shared protection systems with functionally identical units. Int. J. Syst. Sci. 45(5):869–883.
  • Roos, B.W. (1996). Analytic Functions and Distributions in Physics and Engineering. New York City: John Wiley & Sons Inc.
  • Ruiz-Castro, J., Fernández-Villodre, G. (2012). A complex discrete warm standby system with loss of units. Eur. J. Oper. Res. 219:456–469.
  • Shaked, M., Shanthikumar, J.G. (1990). Reliability and maintainability. In: Heyman, D.P., Sobel, M.J., eds. Handbook in Operations Research and Management Science 2. ( North-Holland P. C.), Amsterdam: Elsevier Science Publishers B. V.
  • Shao, J., Lamberson, L.R. (1988). Impact of BIT design parameters on systems RAM. Reliab. Eng. Syst. Saf. 23:219–246.
  • Shi, D.H., Liu, L. (1996). Availability analysis of a two-unit series system with a priority shut-off rule. Naval Res. Logist. 43:1009–1024.
  • Ushakov, I.A. (2012). Stochastic Reliability Models. New York City: John Wiley & Sons Inc.
  • Vanderperre, E.J. (2000). Long-run availability of a two-unit standby system subjected to a priority rule. Bull. Belgian Math. Society-Simon Stevin 7:355–364.
  • Vanderperre, E.J., Yadavalli, V.S.S., Makhanov, S.S. (2004). On Gaver’s parallel system. South Afr. J. Ind. Eng. 13(2):141–147.
  • Vanderperre, E.J., Makhanov, S.S. (2009). Overall availability of a robot with internal safety device. Comput. Ind. Eng. 56:236–240.
  • Vanderperre, E.J., Makhanov, S.S. (2012). Risk analysis of a robot-safety device system subjected to a priority rule. Probab. Eng. Inf. Sci. 26:295–306.
  • Vanderperre, E.J., Makhanov, S.S. (2013a). Reliability analysis of a repairable duplex system. Int. J. Syst. Sci. doi:10.1080/00207721.2012.759671
  • Vanderperre, E.J., Makhanov, S.S. (2013b). Overall availability and risk analysis of a general robot–safety device system. Int. J. Syst. Sci. doi:10.1080/00207721.2013.837592
  • Wang, H.X., Xu, G.Q. (2012). A cold system with two different components and a single vacation of the repairman. Appl. Math. Comput. 219:2614–2657.
  • Wu, Q. (2012). Reliability analysis of a cold standby system attacked by shocks. Appl. Math. Comput. 218:11654–11673.
  • Yun, W.Y., Cha, J.H. (2010). Optimal design for a general warm standby system. Reliab. Eng. Syst. Saf. 95(8):880–886.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.