164
Views
4
CrossRef citations to date
0
Altmetric
Original Articles

Performance analysis of machine repair system with single working vacation

, &
Pages 5602-5620 | Received 20 Jun 2018, Accepted 21 Aug 2018, Published online: 23 Oct 2018

References

  • Gupta, S. M. 1997. Machine interference problem with warm spares, server vacations and exhaustive service. Performance Evaluation 29(3):195–211.
  • Haque, L., and M. J. Armstrong. 2007. A survey of the machine interference problem. European Journal of Operational Research 179(2):469–82.
  • Jain, A., and M. Jain. 2017. Multi server machine repair problem with unreliable server and two types of spares under asynchronous vacation policy. International Journal of Mathematics in Operational Research 10(3):286–30.
  • Ke, J. C. 2006. Vacation policies for machine interference problem with an unreliable server and state-dependent service rate. Journal of the Chinese Institute of Industrial Engineers 23(2):100–14.
  • Ke, J. C., and C. H. Lin. 2005. A Markov repairable system involving an imperfect service station with multiple vacations. Asia-Pacific Journal of Operational Research 22(04):555–82.
  • Ke, J. C., and K. H. Wang. 2007. Vacation policies for machine repair problem with two type spares. Applied Mathematical Modelling 31(5):880–94.
  • Ke, J. C., and C. H. Wu. 2012. Multi-server machine repair model with standbys and synchronous multiple vacation. Computers & Industrial Engineering 62(1):296–305.
  • Liou, C. D. 2014. Optimization analysis of the machine repair problem with multiple vacations and working breakdowns. Journal of Industrial and Management Optimization 11(1):83–104.
  • Maheshwari, S., P. Sharma, and M. Jain. 2010. Machine repair problem with K-type warm spares, multiple vacations for repairmen and reneging. International Journal of Engineering & Technology 2(4):252–8.
  • Stecke, K. E., and J. E. Aronson. 1985. Review of operator/machine interference models. International Journal of Production Research 23(1):129–51.
  • Wang, K. H., W. L. Chen, and D. Y. Yang. 2009. Optimal management of the machine repair problem with working vacation: Newton’s method. Journal of Computational & Applied Mathematics 233(2):449–58.
  • Wang, K. H., C. D. Liou, and T. C. Yen. 2016. Optimization analysis of the G/G/R machine Repair problem with balking and reneging. Journal of Testing and Evaluation 44(4):20140244.
  • Wu, C. H., and J. C. Ke. 2014. Multi-server machine repair problems under a (V, R) synchronous single vacation policy. Applied Mathematical Modelling 38(7-8):2180–9.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.