References
- Gupta, S. M. 1997. Machine interference problem with warm spares, server vacations and exhaustive service. Performance Evaluation 29(3):195–211.
- Haque, L., and M. J. Armstrong. 2007. A survey of the machine interference problem. European Journal of Operational Research 179(2):469–82.
- Jain, A., and M. Jain. 2017. Multi server machine repair problem with unreliable server and two types of spares under asynchronous vacation policy. International Journal of Mathematics in Operational Research 10(3):286–30.
- Ke, J. C. 2006. Vacation policies for machine interference problem with an unreliable server and state-dependent service rate. Journal of the Chinese Institute of Industrial Engineers 23(2):100–14.
- Ke, J. C., and C. H. Lin. 2005. A Markov repairable system involving an imperfect service station with multiple vacations. Asia-Pacific Journal of Operational Research 22(04):555–82.
- Ke, J. C., and K. H. Wang. 2007. Vacation policies for machine repair problem with two type spares. Applied Mathematical Modelling 31(5):880–94.
- Ke, J. C., and C. H. Wu. 2012. Multi-server machine repair model with standbys and synchronous multiple vacation. Computers & Industrial Engineering 62(1):296–305.
- Liou, C. D. 2014. Optimization analysis of the machine repair problem with multiple vacations and working breakdowns. Journal of Industrial and Management Optimization 11(1):83–104.
- Maheshwari, S., P. Sharma, and M. Jain. 2010. Machine repair problem with K-type warm spares, multiple vacations for repairmen and reneging. International Journal of Engineering & Technology 2(4):252–8.
- Stecke, K. E., and J. E. Aronson. 1985. Review of operator/machine interference models. International Journal of Production Research 23(1):129–51.
- Wang, K. H., W. L. Chen, and D. Y. Yang. 2009. Optimal management of the machine repair problem with working vacation: Newton’s method. Journal of Computational & Applied Mathematics 233(2):449–58.
- Wang, K. H., C. D. Liou, and T. C. Yen. 2016. Optimization analysis of the G/G/R machine Repair problem with balking and reneging. Journal of Testing and Evaluation 44(4):20140244.
- Wu, C. H., and J. C. Ke. 2014. Multi-server machine repair problems under a (V, R) synchronous single vacation policy. Applied Mathematical Modelling 38(7-8):2180–9.