187
Views
6
CrossRef citations to date
0
Altmetric
Articles

Optimal design of one-sided exponential EWMA charts based on median run length and expected median run length

ORCID Icon, , ORCID Icon &
Pages 2887-2907 | Received 18 Feb 2019, Accepted 10 Jun 2020, Published online: 30 Jun 2020

References

  • Ali, S., A. Pievatolo, and R. Göb. 2016. An overview of control charts for high-quality processes. Quality and Reliability Engineering International 32 (7):2171–89. doi:10.1002/qre.1957.
  • Castagliola, P., G. Celano, and S. Psarakis. 2011. Monitoring the coefficient of variation using EWMA charts. Journal of Quality Technology 43 (3):249–65. doi:10.1080/00224065.2011.11917861.
  • Celano, G., P. Castagliola, S. Fichera, and G. Nenes. 2013. Performance of t control charts in short runs with unknown shift sizes. Computers & Industrial Engineering 64 (1):56–68. doi:10.1016/j.cie.2012.10.003.
  • Chandrasekaran, S., J. R. English, and R. L. Disney. 1995. Modeling and analysis of EWMA control schemes with variance-adjusted control limits. IIE Transactions 27 (3):282–90. doi:10.1080/07408179508936742.
  • Doğu, E. 2012. Monitoring time between medical errors to improve health-care quality. International Journal for Quality Research 6 (2):151–7.
  • Domangue, R., and S. C. Patch. 1991. Some omnibus exponentially weighted moving average statistical process monitoring schemes. Technometrics 33 (3):299–313. doi:10.1080/00401706.1991.10484836.
  • Gan, F. F. 1991. Computing percentage points of run length of an exponentially weighted moving average control chart. Journal of Quality Technology 23 (4):359–65. doi:10.1080/00224065.1991.11979353.
  • Gan, F. F. 1993. An optimal design of EWMA control charts based on median run length. Journal of Statistical Computation and Simulation 45 (3-4):169–84. doi:10.1080/00949659308811479.
  • Gan, F. F. 1994. Design of optimal exponential CUSUM control charts. Journal of Quality Technology 26 (2):109–24. doi:10.1080/00224065.1994.11979511.
  • Gan, F. F. 1998. Designs of one- and two-sided exponential EWMA charts. Journal of Quality Technology 30 (1):55–69. doi:10.1080/00224065.1998.11979819.
  • Gan, F. F., and T. C. Chang. 2000. Computing average run lengths of exponential EWMA charts. Journal of Quality Technology 32 (2):183–7. doi:10.1080/00224065.2000.11979989.
  • Haq, A. 2019. A new nonparametric synthetic EWMA control chart for monitoring process mean. Communications in Statistics-Simulation and Computation 48 (6):1665–76. doi:10.1080/03610918.2017.1422750.
  • Jones, L. A., and C. W. Champ. 2002. Phase I control charts for times between events. Quality and Reliability Engineering International 18 (6):479–88. doi:10.1002/qre.496.
  • Khan, N., M. Aslam, and C. H. Jun. 2016. A EWMA control chart for exponential distributed quality based on moving average statistics. Quality and Reliability Engineering International 32 (3):1179–90. doi:10.1002/qre.1825.
  • Khoo, M. B. C. 2004. Performance measures for the Shewhart control chart. Quality Engineering 16 (4):585–90. doi:10.1081/QEN-120038020.
  • Khoo, M. B. C., V. H. Wong, Z. Wu, and P. Castagliola. 2011. Optimal designs of the multivariate synthetic chart for monitoring the process mean vector based on median run length. Quality and Reliability Engineering International 27 (8):981–97. doi:10.1002/qre.1189.
  • Knoth, S. 2015. Run length quantiles of EWMA control charts monitoring normal mean or/and variance. International Journal of Production Research 53 (15):4629–47. doi:10.1080/00207543.2015.1005253.
  • Kumar, N., and A. Baranwal. 2019. Design and implementation of qth quantile-unbiased tr-chart for monitoring times between events. Quality and Reliability Engineering International 35 (4):1061–80. doi:10.1002/qre.2445.
  • Latouche, G., and V. Ramaswami. 1999. Introduction to matrix analytic methods in stochastic modeling. Philadelphia: ASA-SIAM.
  • Lee, M. H., and M. B. C. Khoo. 2006. Optimal statistical design of a multivariate EWMA chart based on ARL and MRL. Communications in Statistics - Simulation and Computation 35 (3):831–47. doi:10.1080/03610910600716779.
  • Lee, M. H., and M. B. C. Khoo. 2017a. Optimal design of synthetic np control chart based on median run length. Communications in Statistics - Simulation and Computation 46 (17):8544–56. doi:10.1080/03610926.2016.1183790.
  • Lee, M. H., and M. B. C. Khoo. 2017b. Optimal designs of multivariate synthetic |s| control chart based on median run length. Communications in Statistics-Theory and Methods 46 (6):3034–53. doi:10.1080/03610926.2015.1048884.
  • Liu, J. Y., M. Xie, T. N. Goh, and L. Y. Chan. 2007. A study of EWMA chart with transformed exponential data. International Journal of Production Research 45 (3):743–63. doi:10.1080/00207540600792598.
  • Liu, J. Y., M. Xie, T. N. Goh, and P. R. Sharma. 2006. A comparative study of exponential time between events charts. Quality Technology & Quantitative Management 3 (3):347–59. doi:10.1080/16843703.2006.11673120.
  • Lucas, J. M. 1985. Counted data CUSUM’s. Technometrics 27 (2):129–44. doi:10.1080/00401706.1985.10488030.
  • Luo, P., T. A. Devol, and J. L. Sharp. 2012. CUSUM analyses of time-interval data for online radiation monitoring. Health Physics 102 (6):637–45. doi:10.1097/HP.0b013e3182430106.
  • Maravelakis, P. E., P. Castagliola, and M. B. C. Khoo. 2019. Run length properties of run rules EWMA chart using integral equations. Quality Technology & Quantitative Management 16 (2):129–39. doi:10.1080/16843703.2017.1372853.
  • Neuts, M. F. 1981. Matrix-geometric solutions in stochastic models: An algorithmic approach. New York: Dover Publications Inc.
  • Nyau, S. Y., M. H. Lee, and M. L. D. Wong. 2017. Optimal statistical design of variable sample size multivariate exponentially weighted moving average control chart based on median run-length. Quality Technology & Quantitative Management 14 (4):478–95. doi:10.1080/16843703.2017.1304041.
  • Oakland, J. S. 2007. Statistical process control (6th ed.). London: Routledge.
  • Ozsan, G., M. C. Testik, and C. H. Weiß. 2009. Properties of the exponential EWMA chart with parameter estimation. Quality and Reliability Engineering International 26 (6):555–69. doi:10.1002/qre.1079.
  • Pehlivan, C., and M. C. Testik. 2009. Impact of model misspecification on the exponential EWMA charts: A robustness study when the time-between-events are not exponential. Quality and Reliability Engineering International 26 (2):177–190. doi:10.1002/qre.1033.
  • Raza, S. M. M., M. Riaz, and S. Ali. 2016. EWMA control chart for poisson-exponential lifetime distribution under type I censoring. Quality and Reliability Engineering International 32 (3):995–1005. doi:10.1002/qre.1809.
  • Reynolds, M. R., R. W. Amin, and J. C. Arnold. 1990. CUSUM charts with variable sampling intervals. Technometrics 32 (4):371–84. doi:10.1080/00401706.1990.10484721.
  • Reynolds, M. R., and Z. G. Stoumbos. 2004. Should observations be grouped for effective process monitoring? Journal of Quality Technology 36 (4):343–66. doi:10.1080/00224065.2004.11980283.
  • Ryu, J. H., G. Wan, and S. Kim. 2010. Optimal design of a CUSUM chart for a mean shift of unknown size. Journal of Quality Technology 42 (3):311–26. doi:10.1080/00224065.2010.11917826.
  • Santiago, E., and J. Smith. 2013. Control charts based on the exponential distribution: Adapting runs rules for the t chart. Quality Engineering 25 (2):85–96. doi:10.1080/08982112.2012.740646.
  • Shu, L. J., W. Jiang, and S. J. Wu. 2007. A one-sided EWMA control chart for monitoring process means. Communications in Statistics - Simulation and Computation 36 (4):901–20. doi:10.1080/03610910701418465.
  • Sparks, R. S. 2000. CUSUM charts for signalling varying location shifts. Journal of Quality Technology 32 (2):157–71. doi:10.1080/00224065.2000.11979987.
  • Tang, A. A., P. Castagliola, J. S. Sun, and X. L. Hu. 2019. Optimal design of the adaptive EWMA chart for the mean based on median run length and expected median run length. Quality Technology & Quantitative Management 16 (4):439–58. doi:10.1080/16843703.2018.1460908.
  • Teoh, W. L., J. K. Chong, M. B. C. Khoo, P. Castagliola, and W. C. Yeong. 2017. Optimal designs of the variable sample size X¯ chart based on median run length and expected median run length. Quality and Reliability Engineering International 33 (1):121–34. doi:10.1002/qre.1994.
  • Teoh, W. L., M. B. C. Khoo, P. Castagliola, and M. H. Lee. 2016. The exact run length distribution and design of the Shewhart chart with estimated parameters based on median run length. Communications in Statistics - Simulation and Computation 45 (6):2081–103. doi:10.1080/03610918.2014.889158.
  • Waldmann, K. H. 1986. Bounds for the distribution of the run length of geometric moving average charts. Applied Statistics 35 (2):151–8. doi:10.2307/2347265.
  • Wu, Z., M. Shamsuzzaman, and E. S. Pan. 2004. Optimization design of control charts based on Taguchi’s loss function and random process shifts. International Journal of Production Research 42 (2):379–90. doi:10.1081/00207540310001614169.
  • Yang, J., H. Yu, Y. Cheng, and M. Xie. 2015. Design of exponential control charts based on average time to signal using a sequential sampling scheme. International Journal of Production Research 53 (7):2131–45. doi:10.1080/00207543.2014.974848.
  • You, H. W., M. B. C. Khoo, P. Castagliola, and L. Qu. 2016. Optimal exponentially weighted moving average X¯ charts with estimated parameters based on median run length and expected median run length. International Journal of Production Research 54 (17):5073–22. doi:10.1080/00207543.2016.1145820.
  • Zhang, C. W., M. Xie, and T. N. Goh. 2005. Economic design of exponential charts for time between events monitoring. International Journal of Production Research 43 (23):5019–32. doi:10.1080/00207540500219387.
  • Zhang, C. W., M. Xie, and T. N. Goh. 2006. Design of exponential control charts using a sequential sampling scheme. IIE Transactions 38 (12):1105–16. doi:10.1080/07408170600728905.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.