9
Views
0
CrossRef citations to date
0
Altmetric
Original Articles

Optimizing the Utilization of Redundancy of the Apollo Acceptance Checkout Equipment

&
Pages 353-358 | Published online: 09 Jul 2007

References

  • Bazovsky , I. , Reliability Theory and Practice , Prentice-Hall, Inc. , Englewood Cliffs , New Jersey , 1961 .
  • Doetsch , G. , Guide to the Applications of Laplace Transforms D. Van Nostrand Co., LTD , London , England , 1961 .
  • Sandler , G. H. , System Reliability Engineering , Prentice-Hall, Inc. , Englewood Cliffs , New Jersey , 1963 .
  • General Electric Company Memorandum , “ Reliability-Minimum ACE-S/C Total System ,” General Electric Company, Apollo Support Department, ACE Reliability Group, Kennedy Space Center , Florida , 1968 .
  • North American Aviation Apollo Logistics Training Staff , “ Acceptance Checkout Equipment Familiarization Student Study Guide ,” North American Aviation, Inc. , Downey , California , 1969 .
  • North American Rockwell Corporation , “ Programming Requirements Process Specification for SC-101, Launch Complex 34 ,” MAO201–5242, Rev. A, Kennedy Space Center , Florida , Janaury 1968 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.