References
- Bomberger , E. E. , “ A Dynamic Programming Approach to a Lot Size Scheduling Problem ,” Management Science , Volume 12 , No. 11 , July, 1966 .
- Eilon , S. , “ Economic Batch Size Determination of Multi-Product Scheduling ,” Operational Research Quarterly (England) , Volume 9 , No. 4 , December, 1958 .
- Elmaghraby , S. E. , “ The One Machine Sequencing Problem with Delay Costs ,” Journal of Industrial Engineering , Volume 19 , No. 2 , February, 1968 .
- Elmaghraby , S. E. , “ The Machine Sequencing Problem– Review and Extensions ,” Naval Research Logistics Quarterly , Volume 15 , No. 2 , June, 1968 .
- Glassey , C. R. , “ Minimum Change-over Scheduling of Several Products on One Machine ,” Operations Research , Volume 16 , No. 16 , March-April, 1968 .
- Hanssmann , Fred , Operations Research in Production and Inventory , John Wiley and Sons, Inc. , New York , New York . 1962 , pages, 158 – 160 .
- Krone , L. H. , “ A Note on Economic Lot Sizes for Multipurpose Equipment ,” Management Science , Volume 10 , No. 3 , April, 1964 .
- Maxwell , W. L. , “ The Scheduling of Economic Lot Sizes ,” Naval Research Logistics Quarterly , Volume 11 , No. 2 , June-September, 1964 .
- Rogers , J. , “ A Computational Approach to the Lot Scheduling Problem ,” Management Science , Volume 4 , No. 3 , April, 1958 .
- Salveson , M. E. , “ Mathematical Theory of Production ,” Journal of Industrial Engineering , Volume 4 , No. 1 , February, 1953 .
- Shapiro , J. F. and Wagner , H. M. , “ A Finite Renewal Algorithm for the Knapsack and Turnpike Models ,” Operations Research , Volume 15 , No. 15 , March-April, 1967 .
- Shapiro , J. F. and Wagner , H. M. , “ Turnpike Planning Horizons for a Markovian Decision Model ,” Management Science , Volume 14 , No. 5 , January, 1968 .
- Shapiro , J. F. and Wagner , H. M. , “ Shortest Route Methods for Finite State Space Deterministic Dynamic Programming Problems ,” SIAM Journal of Applied Mathematics , Volume 16 , No. 16 , November, 1968 .
- Smith , W. E. , “ Various Optimizers for Single-Stage Production ,” Naval Research Logistics Quarterly , Volume 3 , No. 3 , March-June, 1956 .