References
- Aley , P. N. and Zimmer , G. H. , “ Capacity Planning ,” Ind. Eng. J. , 6 , 4 , 16 – 19 ( April 1974 ).
- Berry , W. L. , “ Priority Scheduling and Inventory Control in Job Lot Manufacturing Systems ,” AIIE Trans. , 4 , 4 , 267 – 276 ( 1972 ).
- Buffa , E. S. and Taubert , W. H. , Production-Inventory Systems: Planning and Control , Richard D. Irwin, Inc. , Homewood , III. ( 1972 ).
- Carrie , A. S. , “ Correlation Theory Applied to Work-Flow Measurement ,” Int. J. of Prod. Res. , 9 , 2 , 209 – 218 ( 1971 ).
- Doty , R. E. , “ An Experimental Investigation of a Proposed Descriptive Index of Job Shop Operations ,” unpublished MS thesis, The Ohio State University ( 1977 ).
- Dunlap , L. , “ The Effect of Order Size on the Operation of a Hypothetical Job Shop Manufacturing System ,” unpublished PhD dissertation, Oklahoma State University ( 1968 ).
- Holstein , W. K. and Berry , W. L. , “ Work Flow Structure: An Analysis for Planning and Control ,” Mgmt. Sci. , 16 , 6 , B324 – B336 ( February 1970 ).
- Irastorza , J. C. and Deane , R. H. , “ A Loading and Balancing Methodology for Job Shop Control ,” AIIE Trans. , 6 , 4 , 302 – 307 ( 1974 ).
- Jackson , J. R. , “ Jobshop-Like Queueing Systems ,” Mgmt. Sci. , 10 , 1 , 131 – 142 ( October 1963 ).
- Nelson , R. T. , “ An Empirical Study of Arrival, Service Time and Waiting Time Distributions of a Job Shop Production Process ,” Mgmt. Sci. Res. Project , Res. Report No. 60, UCLA ( June 1959 ).
- Wilhelm , W. E. , “ A Model to Evaluate Job Shop Productive Capability ,” AIIE Transactions , 8 , 2 , 176 – 183 ( June 1976 ).