44
Views
19
CrossRef citations to date
0
Altmetric
Original Articles

Managing simple re-entrant flow lines: theoretical foundation and experimental results

&
Pages 609-623 | Received 01 Jun 1997, Accepted 01 Oct 2000, Published online: 27 Apr 2007

References

  • Akella , R. , Choong , Y.F. and Gershwin , S.B. ( 1984 ) Performance of hierarchical production scheduling policy. IEEE Transactions all Components, Hybrids, and Manufacturing Technology , CHMTv7( 3 ), 225 – 240
  • Akella , R. and Kumar. P.R. ( 1986 ) Optimal control of production rate in a failure prone manufacturing system. IEEE Transactions on Automatic Control. , AC- 31 ( 2 ). 116 – 126 .
  • Anupindi , R. and Tayur , S. (1998) Managing stochastic multi-product systems: models measures and analysis. Operations Research. , 46(3), S98-S111.
  • Bai , S.X. and Gershwin , S.B. ( 1996 ) Scheduling manufacturing systems with work-in-process inventory control: reentrant systems. OR Spectrum , 18 ( 4 ), 187 – 195 .
  • Bertsekas , D.P. ( 1999 ) Nonlinear Programming , Athena Scientific,Belmont , MA .
  • Bispo , C.F.G. ( 1997 ) Re-entrant flow lines. PhD thesis, Graduate School of Industrial Administration, Carnegie Mellon University, Pittsburgh , PA .
  • Bispo , C.F.G. and Tayur , S. ( 1997 ) Managing simple re-entrant flow lines II: stability. GSIA, CMU, Pittsburgh , PA15213 , USA . Working paper.
  • Glasserman , P. and Tayur , S. (1995) Sensitivity analysis for base-stocklevels in multi-echelon production-inventory systems. Management Science , 41 ( 2 ), 263 – 281 .
  • Glasserman , P. and Tayur , S. ( 1996 ) A simple approximation for a multi-stage capacitated production-inventory system. Naval Research Logistics Quarterly , 43 ( 1 ), 41 – 58 .
  • Glassey , C.R. and Resende , M.G.C. ( 1988 ) Closed-loop job release control for VLSI circuit manufacturing. IEEE Transactions on Semiconductor Manufacturing , 1 ( 1 ),36--46.
  • Harrison , J.M. and Wein , L.M. ( 1990 ) Scheduling networks of queues: heavy traffic analysis of a two-station closed network. Operations Research, , 38 ( 6 ), 1052 – 1064 .
  • Ho , Y.-c. and Cao , X.R. ( 1991 ) Perturbation Analysis ofDiscrete Event Dynamic Systems , Kluwer Academic Publishers, Boston , MA .
  • Kimemia , J.G. and Gershwin , S.B. ( 1983 ) An algorithm for the computer control of a flexible manufacturing system. , lIE Transactions, 15 ( 4 ), 353 – 362 .
  • Kumar , P.R. and Seidman , T. ( 1990 ) Dynamic instabilities and stabilization methods in distributed real-time scheduling of manufacturing systems. IEEE Transactions on Automatic Control , 35 ( 3 ), 289 – 298 .
  • Kumar , S. and Kumar , P.R. ( 1994 ) Performance bounds for queueing networks and scheduling policies. IEEE Transactions on Automatic Control , 39 ( 8 ), 1600 – 1611 .
  • L'Ecuyer, P. ( 1994 ) Efficiency improvement and variance reduction, in Proceedings of the 1994 Winter Simulation Conference , Piscataway , NJ , pp. 122 – 132 .
  • Lernarechal , C. ( 1989 ) NondifTerentiable optimization, in Handbooks in OR and MS , Vol. I, Nemhauser, G.L. , Rinnooy Kan , A.H.G. , Todd , M.J. (eds), Elsevier Science Publishers, Boston , MA , pp. 529 – 572 .
  • Lou , S.X.C. and Kager , P.W. ( 1989 ) A robust production control policy for VLSI wafer fabrication. IEEE Transactions on Semiconductor Manufacturing , 2 ( 4 ), 159 – 164 .
  • Lu , S.C.H. and Kumar , P.R. ( 1991 ) Distributed scheduling based on due-dates and buffer priorities. IEEE Transactions on Automatic Control , 36 ( 12 ), 1406 – 1416 .
  • Lu , S.C.H. , Ramaswamy , D. and Kumar , P.R. ( 1994 ) Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants. IEEE Transactions on Semiconductor Manufacturing , 7 ( 3 ), 374 – 388 .
  • Perkins , J.R. and Kumar , P.R. ( 1989 ) Stable distributed, real-time scheduling of flexible anufacturing/assembly/disassembly systems. IEEE Transactions on Automatic Control , 34 ( 2 ), 139 – 148 .
  • Speck , c.J. and der Wall , V. ( 1991 ) The capacitated multi-echelon inventory system with serial structure: the average cost criterion. Technical Report CaSaR 91 – 39 , Department of Mathematics and Computer Science , Eindhoven Institute of Technology, Eindhoven , The Netherlands .
  • Tayur , S. , Ganeshan , R. and Magazine , M. ( 1999 ) Quantitative Models for Supply Chain Management, Kluwer Academic Publishers , Boston , MA .
  • Uzsoy , R. , Lee , c.-Y. and Martin-Vega , L.A. ( 1994 ) A review of production planning and scheduling models in the semiconductor industry part I: system characteristics, performance evaluation and production planning. lIE Transactions , 24 ( 4 ), 47 – 60 .
  • Uzsoy , R. , Lee , c.-Y. and Martin-Vega , L.A. ( 1994 ) A review of production planning and scheduling models in the semiconductor industry part 11: shop-floor control. lIE Transactions , 26 ( 5 ), 44 – 55 .
  • Van Ryzin , G. , Lou , S.X.c. and Gershwin , S.B. ( 1993 ) Production control for a tandem two-machine system. lIE Transactions , 25 ( 5 ), 5 – 20 .
  • Wein , L.M. ( 1988 ) Scheduling semiconductor wafer fabrication. IEEE Transactions on Semiconductor Manufacturing , 1 ( 3 ), 115 – 130 .
  • Wein , L.M. ( 1990 ) Optimal control of a two-station Brownian network. Mathematics of Operations Research , 15 , 215 – 242 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.