Some Comparative and Design Aspects of Series Production Systems

Pages 229-239 | Received 01 Mar 1983, Published online: 06 Jul 2007

References

  • Altiok , T. M. and Stidham , S. , Jr. , “ A Note on Transfer Lines without Unreliable Machine Random Processing Times and Finite Buffers ,” IIE TRANSACTIONS 14 , 2 , 125 – 127 ( 1982 ).
  • Anderson , D. R. and Moodie , C. L. , “ Optimal Buffer Storage Capacity in Production Line Systems ,” International Joumal of Production Research 7 , 3 , 233 – 240 ( 1969 ).
  • Barten , K. A. , “ A Queueing Simulator for Determining Optimum Inventory Levels in a Sequential Process ,” Journal of Industrial Engineering 13 , 4 , 245 – 252 ( 1962 ).
  • Basu , R. N. , “ The Interstage Buffer Storage Capacity of Nonpowered Assembly Lines: A Simple Mathematical Approach ,” International Journal of Production Researuch 15 , 4 , 365 – 385 ( 1977 ).
  • Buxey , G. M. and Sadjadi , D. , “ Simulated Studies of Conveyor Paced Assembly Lines with Buffer Capacity ,” International Journal of Production Research 14 , 5 , 607 – 624 ( 1976 ).
  • Buxey , G. M. , Slack , N. D. , and Wild , R. , “ Production Flow Line System Design: A Review ,” AIIE TRANSACTIONS 5 , 1 ( 1973 ).
  • Buzacott , J. A. , “ Prediction of the Efficiency of Production Systems Without Internal Storage ,” International Journal of Production Research 6 , 3 , 173 – 188 ( 1968 ).
  • Buzacott , J. A. , “ The Role of Inventory Banks in Flow Line Production Systems ,” International Journal of Production Research 9 , 4 , 425 – 436 ( 1971 ).
  • Buzacott , J. A. , “ Automatic Transfer Lines with Buffer Stocks ,” International Journal of Production Research 5 , 3 ( 1967 ).
  • Buzacott , John A. , “ The Effect of Station Breakdowns and Random Processing Times on the Capacity of Flow Lines with In-process Storage ,” AIIE TRANSACTIONS 4 , 4 , 309 – 312 ( 1972 ).
  • Buzacott , J. A. , “ The Production Capacity of Job Shops with Limited Storage Space, ” International Journal of Production Research ( 1971 ) 14 , 5 , 597 – 605 .
  • Buzacott , J. A. and Hanifin , L. E. , “ Models of Automatic Transfer Lines with Inventory Banks - A Review and Com-parison. ” AIIE TRANSACTIONS 10 , 2 , 197 – 207 ( 1978 ).
  • Disney , R. L. , “ Analytical Studies of Stochastic Networks Using Methods of Networks Decomposition ,” Journal of Industrial Engineering 18 , 1 , 140 – 145 ( 1967 ).
  • Freeman , M. C. , “ The Effects of Breakdown and Interstage Storage on Production Line Capacity ,” Journal of Industrial Engineering 15 , 194 ( 1964 ).
  • Gershwin , S. B. and Berman , O. , “ Analysis of Transfer Lines Consisting of Two Unreliable Machines with Random Processing Times and Finite Storage Buffers ,” AIIE TRANSACTIONS 13 , 1 , 2 – 11 ( 1981 ).
  • Gershwin , S. B. and Schick , I. C. , “ Modeling and Analysis of Three-Stage Transfer Lines with Unreliable Machines and Finite Buffers ,” Operations Research 31 , 2 , 354 – 380 ( 1983 ).
  • Hanafin , L. E. , “ Increased Transfer Lines Productivity Utilizing System Simulation ,” D. Engineering thesis (unpublished), University of Detroit ( 1975 ).
  • Hanifin , L. E. , Buzacott , J. A. , and Taraman , K. S. , “ A Comparison of Analytical and Simulation Models of Transfer Lines ,” SME Technical paper EM75–374 ( 1975 ).
  • Hatcher , J. M. , “ The Effect of Internal Storages on the Production Rate of a Series of Stages Having Exponential Service Times ,” AIIE TRANSACTIONS 1 , 150 – 156 ( 1969 ).
  • Hillier , F. S. and Boling , R. N. , “ The Effect of Some Design Factors on the Efficiency of Production Lines with Variable Operations Times ,” Journal of Industrial Engineering 17 , 12 , 651 – 658 ( 1966 ).
  • Hilliei , F. S. and Boling , R. N. “ Finite Queues in Series with Exponential or Erlang Service Time - A Numerical Approach ,” Operations Research 15 , 286 – 303 ( 1967 ).
  • Hollier , R. H. and Satir , A. T. , “ Inter-Stage Stock Control in Series Production Systems with Different Number of Parallel Machines at Each Stage ,” International Journal of Production Research 20 , 6 , 483 – 492 ( 1982 ).
  • Hunt , G. C. , “ Sequential Arrays of Waiting Lines ,” Operations Research 4 , 6 , 674 – 683 ( 1957 ).
  • Ignall , E. and Silver , A. , “ The Output of a Two-stage System with Unreliable Machines and Limited Storage ,” AIIE TRANSACTIONS 9 , 2 , 183 – 188 ( 1977 ).
  • Kala , R. and Hitchings , G. G. , “ The Effect of Performance Time Variance on a Balanced Four-Station Manual Assembly Line ,” International Journal of Production Research 11 , 2 , 341 ( 1973 ).
  • Knott , A. D. , “ The Inefficiency of a Series of Work Stations: A Simple Formula ,” International Journal of Production Research 8 , 2 , 109 – 119 ( 1970 ).
  • Koenigsberg , E. , “ Cyclic Queues ,” Operations Research Quarterly 9 , 2 ( 1959 ).
  • Koenigsberg , E. and Mamer , J. , “ The Analysis of Production System ,” International Journal of Production Research 20 , 1 , 1 – 16 ( 1982 ).
  • Koenigsberg , E. , “ Production Lines and Internal Storage ,” Management Science 5 , 3 , 410 – 433 ( 1959 ).
  • Lev , B. and Toof , D. I. , “ The Role of Internal Storage Capacity in Fixed-cycle Production Systems ,” Naval Research Logistics Quarterly 27 , 4 , 477 – 487 ( 1980 ).
  • Murphy , R. A. , “ The Effect of Surge on System Availability ,” AIIE TRANSACTIONS 7 , 4 , 439 – 443 ( 1975 ).
  • Murphy , R. A. , “ Estimating the Output of a Series Production System ,” AIIE TRANSACTIONS 10 , 2 , 139 – 148 ( 1978 ).
  • Muth , E. J. , “ The Production Rate of a Series of Work Stations with Variable Service Times ,” International Journal of Production Research 11 , 12 , 155 – 169 ( 1973 ).
  • Nof , S. Y. , Barash , M. M. , and Solberg , J. J. , “ Operational Control of Item Flow in Versatile Manufacturing System ,” International Journal of Production Research 17 , 5 , 479 – 489 ( 1979 ).
  • Okamura . R. and Yamashina , H. , “ Justification for Installing Buffer Stocks in Unbalanced Automatic Transfer Lines ,” AIIE TRANSACTIONS 11 , 4 , 308 – 312 ( 1979 ).
  • Ovuworie , G. C. , “ An Unreliable Series Production Line: Keeping it Running with Buffer Stocks, ” International Journal of Production Research 20 , 5 , 607 – 618 ( 1982 );
  • “ Some Simulation Results of a Model of an Unreliable Series Production System ,” International Journal of Production Research ( 1982 ) 20 , 5 , 619 – 628 .
  • Payne , S. , Slack , N. , and Wild , R. , “ A Note on the Operating Characteristics of Balanced and Unbalanced Production Flow Lines ,” International Journal of Production Research 10 , 1 , 93 – 98 ( 1972 ).
  • Rao , N. P. , “ Two-stage Production Systems with Intermediate Storage ,” AIIE TRANSACTIONS 7 , 4 , 414 – 421 ( 1975 ).
  • Rao , N. P. , “ A Viable Alternative to the Method of Stages Solution of Series Production Systems with Erlang Service Times ,” International Journal of Production Research 14 , 6 , 699 – 702 ( 1976 ).
  • Rao , N. P. , “ On the Mean Production Rate of a Two-stage Production System of the Tandem Type ,” International Journal of Production Research 13 , 2 , 207 – 217 ( 1975 ).
  • Rao , N. P. , “ A Generalization of the Bowl Phenomenon in Series Production Systems ,” International Journal of Production Research 14 , 4 , 437 – 443 ( 1976 ).
  • Sadowski , R. P. and Medeiros , D. J. , “ The Effect of Viability on the Unbalanced Production Lines ,” International Journal of Production Research 17 , 6 , 527 – 540 ( 1979 ).
  • Shanthikumar , J. G. and Tien , C. C. , “ An Algorithmic Solution to Two-Stage Transfer Lines with Possible Scrapping of Units ,” Management Science 29 , 9 , 1069 – 1086 ( 1983 ).
  • Shanthikumar , J. G. , “ Technical Note: On the Production Capacity of Automatic Transfer Lines with Unlimited Buffer Space ,” AIIE TRANSACTIONS 12 , 3 , 273 – 274 ( 1980 ).
  • Sheskin , T. J. , “ Allocation of Interstage Storage Along an Automatic Production Line ,” AIIE TRANSACTIONS 8 , 1 , 146 – 152 ( 1976 ).
  • Slack , N. D. and Wild , Ray , “ Production Flow Line and Collective Working: A Comparison ,” International Journal of Production Research 13 3, 411 – 418 ( 1975 ).
  • Soyster , A. L. and Toof , D. I. , “ Some Comparative Study and Design Aspects of Fixed Cycle Production Systems ,” Naval Research Logistics Quarterly 23 , 437 – 454 ( 1976 ).
  • Wild , R. , “ Mass Production Management: The Design & Operation of Production Flow-Line Systems ,” John Wiley & Sons , London ( 1972 ).
  • Yamashina , H. and Okamura , K. , “ Analyzing In-Process Buffer for Multiple Transfer Line Systems ,” International Journal of Production Research 21 , 2 , 183 – 195 ( 1983 ).
  • Young , H. H. , “ Optimization Models for Production Lines, ” Journal of Industrial Engineering ( 1967 ) 16 , 1 , 70 – 78 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.