References
- Billington , P. J. , McClain J. O. , and Thomas L. J. ( 1983 ), “ Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction ,” Management Science 29 ( 10 ), 1126 1141 .
- Grasso , E. T. and Taylor B. W. , III ( 1984 ), “ A Simulation-based Experimental Investigation of Supply/Timing Uncertainty in MRP Systems ,” International Journal of Production Research 22 ( 3 ), 485 497 .
- Graves , S. C. (1985), “ A Tactial Planning Model for a Job Shop ,” Sloan School of Management Working Paper 1552–84, Massachusetts Institute of Technology .
- Karmarkar , U. S. , Kekre S. and Kekre S. ( 1985 ), “ Lotsizing in Multi-Item Multi-Machine Job Shops ,” IIE Transactions 17 ( 3 ), 290 298 .
- Karmarkar , U. S. , Kekre S. , Kekre S. , and Freeman S. ( 1985 ), “ Lot Sizing and Lead Time Performance in a Manufacturing Cell ,” Interfaces 15 ( 1 ), 1 9 .
- Kanet , J. and Christy D. P. ( 1984 ), “ Manufacturing Systems with Forbidden Early Order Departure ,” International Journal of Production Research 22 ( 1 ), 41 50 .
- Luenberger , D. G. , Introduction to Linear and Non-Linear Programming. Reading , Massachusetts : Add-Wesley Publishing Company , 1973 .
- Rees , L. P. , Philipoom P. R. , Taylor B. W. , III , and Huang P. Y. ( 1987 ), “ Dynamically Adjusting the Number of Kanbans in a Just-in-Time Production System Using Estimated Values of Leadtime ,” IIE Transactions , 19 ( 2 ), 199 207 .
- Weeks , J. K. ( 1981 ), “ Optimizing Planned Lead Times and Delivery Dates ,” 21st Annual Conference Proceedings , American Production and Inventory Control Society, 177 188 .
- Whybark , D. C. and Williams J. G. ( 1976 ), “ Material Requirements Planning Under Uncertainty ,” Decision Sciences 7 ( 4 ), 595 606 .
- Yano , C. A. ( 1987 ), “ Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs ,” Management Science , 33 ( 1 ), 95 106 .