REFERENCES
- Davis , E. W. , “ Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures ,” AIIE Transactions , 5 , 297 – 313 ( 1973 ).
- Davis , E. W. and J. H. Patterson , “ A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling ,” Management Science 21 ( 8 ), 944 – 955 ( 1975 )
- Dincerler , A. , “ Project Scheduling in Project-Oriented Production Systems ,” ORC Report 85-II , Engineering Systems Research Center, University of California , Berkeley ( 1985 ).
- Hackman , S. T. and R. C. Leachman , “ A General Framework for Modeling Production ,” Management science , 35 ( 4 ). 478495 ( 1989 ).
- Hackman , S. T. and R C. Leachman , “ An Agoregate Model of Project-Oriented Production ,” IEEE Transactions on System, Man and Cybernetics 19 ( 2 ), 220 – 231 ( 1989 ).
- Leachman , R C, “ Multiple Resource Leveling in Construction Systems Through Variation of Activity Intensities .” Naval Research Logistics Quarterly 30 ( 3 ), 187 – 198 ( 1983 ).
- Leachman. R, C. and J. Boysen , “ An Aggregate Model for Multi-Project Resource Allocation ,” in Project Management Methods and Studies , B. V. Dean, ed. , North Holland , Amsterdam ( 1985 ),
- Moder , J. J. , C. R Phillips and E. W. Davis , Project Management with CPM and PERT , 3rd Edition , Van Nostrand Reinhold , New York ( 1985 ).
- Patterson , J. H. “ A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem ,” Management Science 30 ( 7 ), 854 – 867 ( 1984 ).
- Talbot , F. B. , “ Resource-Constrained Project Scheduling with Time-Resource Tradeoffs The Nonpreemptive Case ,” Management Science 28 ( 10 ), 1197 – 1210 ( 1982 ).
- Weglarz , J. , “ Time-Optimal Control of Resource Allocation in a Com-plex of Operations Framework ,” IEEE Trans. Systems, Man and Cybernetics 6 , 783 – 788 ( 1976 ).
- Weglarz , J. , “ Project Scheduling with Discrete and Continuous Resources ,” IEEE Trans. System. Man and Cybernetics 9 , 644 – 650 ( 1979 )
- Weglarz , J. , “ Project Scheduling with Continuously-Divisible, Doubly Constrained Resources ,” Management Science 27 ( 9 ), 1040 – 1053 ( 1981 ).
- Wiest , B. D. , “ A Heuristic Model for Scheduling Large Projects with Limited Resources .“ Management Science 13 ( 6 ), 1120 – 1148 ( 1967 ).
- Willis , R.J. , “ Critical Path Analysis and Resource Constrained Project Scheduling—Theory and Practice .” European Journal of Operational Research 21 , 149 – 155 ( 1985 ).