55
Views
15
CrossRef citations to date
0
Altmetric
Original Articles

BATCH SCHEDULING TO MINIMIZE CYCLE TIME, FLOW TIME, AND PROCESSING COST

&
Pages 90-97 | Received 01 Jan 1989, Published online: 31 May 2007

REFERENCES

  • Baker , K. R. , “ Lot Streaming to Reduce Cycle Time in a Flow Shop ,” Working Paper No. 203, Amos Tuck School , Dartmouth College ( 1987 ) .
  • Baker , K. R. , and Pyke , D. F. , “ Solution Procedures for the Lot Streaming Problem ,” Working Paper No. 233, Amos Tuck School , Dartmouth College ( 1989 ) .
  • Dobson , G. , Karmarkar , U. S. , and Rummel , J. L. , “ Batching to Minimize Flow Times on One Machine ,” Management Science , 33 , 784 – 799 ( 1987 ).
  • Goyal , S. K. , “ Determination of Optimum Production Quantity for a Two-Stage Production System ,” Operational Research Quarterly . 28 , 865 – 870 ( 1977 ).
  • Goyal , S. K. , “ Economic Batch Quantity in a Multi-Stage Production System ,” International Journal of Production Research , 16 , 267 – 273 ( 1978 ).
  • Jacobs , F. R. , “ OPT Uncovered Many Production Planning and Scheduling Concepts Can Be Applied With or Without the Software ,” Industrial Engineering . 16 , 32 – 41 ( 1984 ).
  • Lawler , E. L. , Lenstra , J. K. , Rinnooy Kan , A. H. G. , and Shmoys , D. B. , (ed.) The Traveling Salesman Problem , J. Wiley & Sons, Inc. , New York , 100 ( 1985 ) .
  • Potts , C. N. , and Baker , K. R. , “ Flow Shop Scheduling with Lot Streaming ,” Operations Research Letters , 8 , 297 – 303 ( 1989 ).
  • Santos , C. , and Magazine , M. , “ Batching in Single Operation Manufacturing Systems ,” Operations Research Letters , 4 , 99 – 103 ( 1985 ).
  • Szendrovits , A. Z. , “ Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model ,” Management Science , 22 , 298 – 308 ( 1975 ).
  • Szendrovits , A. Z. , “ A Comment on Determination of Optimum Production Quantity for a Two-Stage Production System ,” Journal of the Operational Research Society , 29 , 1017 – 1020 ( 1978 ).
  • Szendrovits , A. Z. , “ Non-Integer Optimal Lot Size Ratios in Two-Stage Production/Inventory Systems ,” International Journal of Production Research , 21 , 323 – 336 ( 1983 ).
  • Szendrovits A. Z. , and Drezner , Z. , “ Optimizing Multi-Stage Production with Constant Lot Size and Varying Numbers of Batches ,” Omega , 8 , 623 – 629 ( 1980 ).
  • Truscott , W. G. , “ Scheduling Production Activities in Multistage Batch Manufacturing Systems ,” International Journal of Production Research , 23 , 315 – 328 ( 1985 ).
  • Truscott , W. G. , “ Production Scheduling with Capacity-Constrained Transportation Activities ,” Journal of Operations Management . 6 , 333 – 348 ( 1986 ).
  • Truscott , W. G. , and Cho , D. I. , “ Scheduling Batch Production with Character Graphics ,” Industrial Engineering , 19 , 17 – 22 ( 1987 ).
  • Handled by the Department of Planning, Scheduling, and Control.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.