27
Views
9
CrossRef citations to date
0
Altmetric
Original Articles

A PREDICTIVE MODEL FOR THE THROUGHPUT OF UNBALANCED, UNBUFFERED THREE-STATION SERIAL LINES

, &
Pages 62-71 | Received 01 Mar 1991, Published online: 31 May 2007

REFERENCES

  • Altiok , T. , “ On the Phase-Type Approximations of General Distributions ,” IIE Transactions , 17 , 2 , 110 – 116 ( 1985 ).
  • Anderson , D. R. , and Moodie , C. L. , “ Optimal Buffer Storage Capacity in Production Line Systems ,” International Journal of Production Research , 7 , 233 – 240 ( 1969 ).
  • Baker , K. R. , Powell, S. G- , and Pyke , D. F. , “ Buffered and Unbuffered Aiisembly Systems with Variable Processing Times ,” Journal of Manufacturing and Operations Management , 3 , 200 – 223 ( 1990 ).
  • Baker , K. R. , Powell , S. G. , and Pyke , D. F. , “ The Performance of Push and Pull Systems A Corrected Analysis ,” International Journal of Production Research , 29 , 1731 – 1736 ( 1990 ).
  • Barten , K. , “ A Queueing Simulator for Determining Optimum Inventory Levels in a Sequential Process ,” The Journal of Industrial Engineering , 13 , 245 – 252 ( 1962 ).
  • Conway , R. W. , Maxwell , W. L. , McClain , J. O. , and Thomas , L. J. , “ The Role of Work-In-Process Inventories in Serial Production Lines ,” Operations Research , 36 , 229 – 241 ( 1988 ).
  • De Kok , A. G. , “ Computationally Efficient Approximations for Balanced Howlines with Finite Intermediate Buffers ,” International Journal of Production Research , 28 , 401 – 419 ( 1990 ).
  • De Kok , A.G. , Personal communication ( 1991 ).
  • Hillier , F. , and Boling , R. , “ Finite Queues in Series with Exponential or Erlang Service Times A Numerical Approach ,” Operations Research , 15 , 286 – 303 ( 1967 ).
  • Hillier , F. , and Boling , R. , “ On the Optimal Allocation of Work in Symmetrically Unbalanced Production Line Systems with Variable Operation Times ,” Management Science , 25 , 721 – 728 ( 1979 ).
  • Hillier , F. , and So , K. C. , “ The Effect of the Coefficient of Variation of Operation Times on the Allocation of Storage Space in Production Line Systems ,” IIE Transactions , 23 , 198 – 206 ( 1991 ).
  • Hunt , G. C. , “ Sequential Arrays of Waiting Lines ,” Operations Research , 4 , 674 – 683 ( 1956 ).
  • Knott , A. D. , “ The Inefficiency of a Series of Work Stations A simple Formula ,” International Journal of Production Research , 8 , 109 – 119 ( 1970 ).
  • Knott , K. , and Sury , R. J. , “ A Study of Work-Time Distributions on Unpaced Tasks ,” IIE Transactions , 19 , 50 – 55 ( 1987 ).
  • Malrino , T. , “ On the Mean Passage Time Concerning Some Queueing Problems of the Tandem Type ,” Journal of the Operations Research Society of Japan , 7 , 17 – 47 ( 1964 ).
  • Mishra , A. , Acharya , D. , Rao , N. P. , andSastry , G. P. , “ Composite Stage Effects in Unbalancing of Series Production Systems ,” International Journal of Production Research , 23 , 1 – 20 ( 1985 ).
  • Muth , E. J. , “ The Production Rate of a Series of Work Stations with Variable Service Times ,” International Journal of Production Research , 11 , 155 – 169 ( 1973 ).
  • Muth , E. J. , “ Numerical Methods Applicable to a Production Line with Stochastic Servers ,” Algorithmic Methods in Probability , M. F. Neuts (Ed.) , Studies in the Management Sciences . 7 , 143 – 159 ( 1977 ).
  • Muth , E. J. , “ The Reversibility Property of Production Lines ,” Management Science , 25 , 152 – 158 ( 1979 ).
  • Muth , E.J. , “ Stochastic Processes and Their Network Representations Associated with a Production Line Queueing Model ,” European Journal of Operations Research , 15 , 63 – 83 ( 1984 ).
  • Muth , E. J. , “ An Update on Analytical Models of Serial Transfer Lines ,” Research Report 87-15, Department of Industrial and Systems Engineering , University of Florida , Gainesville , Florida ( 1987 ).
  • Muth , E. J. , and Alkaff , A. , “ The Throughput of Three-station Production Lines A Unifying Solution ,” International Journal of Production Research , 25 , 1405 – 1413 ( 1987 ).
  • Neuts , M. L. , Matrix-Geometric Solutions in Stochastic Models , Johns Hopkins University Press , Baltimore , MD ( 1981 ).
  • Rao , N. P. , “ On the Mean Production Rate of a Two-Stage Production System of the Tandem Type ,” International Journal of Production Research , 13 , 207 – 217 ( 1975 ).
  • Rao , N. P. , “ A Viable Alternative to the ‘Method of Stages’ Solution of Series Production Systems with Erlang Service Times ,” International Journal of Production Research , 14 , 699 – 702 ( 1976 ).
  • Rao , N. P. , “ A Generalization of the 'Bowl Phenomenon' in Series Production Systems ,” International Journal of Production Research , 14 , 437 – 443 ( 1976 ).

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.