25
Views
15
CrossRef citations to date
0
Altmetric
ORIGINAL ARTICLES

A greedy algorithm to determine the number of transporters in a cyclic electroplating process

, &
Pages 347-355 | Received 01 Aug 1992, Accepted 01 Jun 1995, Published online: 30 May 2007

References

  • Ahuja , R. , Magananti , T.L. and Orlin , J.B. ( 1993 ) Network Flows Theory, Algorithms, and Application , Prentice Hall , Englewood Cliffs , NJ .
  • Armstrong , R. D. , Lei , L. and Gu , S. ( 1994 ) A bounding scheme for deriving the minimal cycle time of a single transporter n-stage process with time-window constraints . European Journal of Operations Research , 78 , 130 – 140 .
  • Bodin , L. , Golden , B. , Assad , A. and Ball , M. ( 1983 ) Routing and scheduling of vehicles and crews - the state of the art . Computers and Operations Research , 10 , 62 – 212 .
  • Desrosiers , J. , Sauve , M. and Soumis , F. ( 1988 ) Lagrangian relaxation methods for solving the minimum fleet size multiple traveling salesman problem with time windows . Management Science , 34 ( 8 ), 1005 – 1023 .
  • Rolen , A. , Rinnooy Kan , A. and Trienekens , H. ( 1987 ) Vehicle routing with time windows. Operations Research , 35 , 266 – 273 .
  • Lei , L. ( 1992 ) Adaptive control of feasible cycle times in a processing line with multiple transporters , in Proceedings of International Conference of Pacific Region Management .
  • Lei , L. Determining the optimal starting times in a cyclic schedule with a given routine . Computers and Operations Research , 20 ( 8 ), 807 – 816 .
  • Lei , L. and Wang , T. J. ( 1991 ) The minimum common-cycle algorithm for cyclic scheduling of two hoists with tune window constraints. Management Science , 37 ( 12 ), 1629 – 1639 .
  • Lei , L. , Armstrong , R.D. and Gu , S. ( 1993 ) Minimizing the fleet size with dependent time-window and single-track constraints. Operations Research Letters , 14 ( 2 ), 91 – 98 .
  • Lin , H.C. , Egbelu , P. J. and Wu , C. T. ( 1995 ) A two-robot printed circuit board assembly system . Journal of Computer Integrated Manufacturing , ( in the press ).
  • Matsuo , H. , Shang , S.-C. , Sullivan , R. S. ( 1991 ) Crane scheduling and machine layout problem in a computer-integrated manufacturing environment. Management Science , 37 ( 5 ), 587 – 606 .
  • Ramudhin , A. and Ratliff , H. D. ( 1991 ) Scheduling in process industries . Working Paper , Georgia Institute of Technology .
  • Shapiro , G. W. ( 1985 ) Hoist Scheduling for a PCB Electroplating Facility . M.S. thesis . North Carolina State University .
  • Shapiro , G. W. and Nuttle , H. L. W. ( 1988 ) Hoist scheduling for a PCB electroplating facility. HE Transactions , 20 ( 2 ), 157 – 167 .
  • Solomon , M. M. ( 1987 ) Algorithms for the vehicle routing and scheduling problem with time window constraints. Operations Research , 32 ( 2 ), 254 – 265 .
  • Solomon , M. M. and Desrosiers , J. ( 1988 ) Time window constrained routing and scheduling problems . Transportation Science . 22 ( 1 ), 1 – 13 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.