985
Views
78
CrossRef citations to date
0
Altmetric
ORIGINAL ARTICLES

Optimally loading tow trains for just-in-time supply of mixed-model assembly lines

, &
Pages 121-135 | Received 01 Sep 2009, Accepted 01 Mar 2011, Published online: 14 Dec 2011

References

  • Apte , U. M. and Viswanathan , S. 2000 . Effective cross docking for improving distribution efficiencies. . International Journal of Logistics , 3 : 91 – 302 .
  • Bartholdi , J. J. and Hackman , S. T. 2008 . Warehouse & distribution science Release 0.89, available from: http://www.warehouse-science.com, accessed July 1, 2009.
  • Beaujon , G. J. and Turnquist , M. A. 1991 . A model for fleet sizing and vehicle allocation. . Transportation Science , 25 : 19 – 45 .
  • Bell , W. J. , Dalberto , L. M. , Fisher , M. L. , Greenfield , A. J. , Jaikumar , R. , Kedia , P. , Mack , R. G. and Prutzman , P. J. 1983 . Improving the distribution of industrial gases with an on-line computerized routing and scheduling optimizer. . Interfaces , 13 : 4 – 23 .
  • Boysen , N. , Fliedner , M. and Scholl , A. 2009a . Level scheduling for batched JIT supply. . Flexible Services and Manufacturing Journal , 21 : 31 – 50 .
  • Boysen , N. , Fliedner , M. and Scholl , A. 2009b . Level scheduling under storage constraints. . International Journal of Production Research , 47 : 2669 – 2684 .
  • Boysen , N. , Fliedner , M. and Scholl , A. 2009c . Sequencing mixed-model assembly lines: survey, classification and model critique. . European Journal of Operational Research , 192 : 349 – 373 .
  • Campbell , A. , Clarke , L. , Kleywegt , A. and Savelsbergh , M. W.P. 1998 . “ The inventory routing problem ” . In Fleet Management and Logistics , Edited by: Crainic , T.G. and Laporte , G. 95 – 113 . Dordrecht, The Netherlands : Kluwer .
  • Cordeau , J.-F. , Laporte , G. , Savelsbergh , M. W.P. and Vigo , D. 2007 . “ Vehicle routing ” . In Handbook in Operations Research & Management Science 14 , Edited by: Barnhart , C. and Laporte , G. 367 – 428 . Amsterdam, The Netherlands : Elsevier .
  • Dahmala , T. N. and Kubiak , W. 2005 . A brief survey of just-in-time sequencing for mixed-model systems. . International Journal of Operations Research , 2 : 38 – 47 .
  • Duplaga , E. A. , Hahn , C. K. and Hur , D. 1996 . Mixed-model assembly line sequencing at Hyundai Motor Company. . Production and Inventory Management Journal , 37 : 20 – 26 .
  • Fisher , M. L. , Greenfield , A. J. , Jaikumar , R. and Lester , J. T. 1982 . A computerized vehicle routing application. . Interfaces , 12 : 42 – 52 .
  • Hodgson , T. J. and Wang , D. 1991 . Optimal hybrid push/pull control strategies for a parallel multistage system: part I. . International Journal of Production Research , 29 : 1279 – 1287 .
  • Holweg , M. 2007 . The genealogy of lean production. . Journal of Operations Management , 25 : 420 – 437 .
  • Kleywegt , A. J. , Nori , V. S. and Savelsbergh , M. W.P. 2002 . The stochastic inventory routing problem with direct deliveries. . Transportation Science , 36 : 94 – 118 .
  • Kleywegt , A. J. , Nori , V. S. and Savelsbergh , M. W.P. 2004 . Dynamic programming approximations for a stochastic inventory routing problem. . Transportation Science , 38 : 42 – 70 .
  • Klose , A. and Drexl , A. 2005 . Facility location models for distribution system design. . European Journal of Operational Research , 162 : 4 – 29 .
  • Kubiak , W. 1993 . Minimizing variation of production rates in just-in-time systems: a survey. . European Journal of Operational Research , 66 : 259 – 271 .
  • Monden , Y. 1998 . Toyota Production System: An Integrated Approach to Just In-Time, third edition , Norcoss, GA : Engineering & Management Press .
  • Rees , L. P. , Huang , P. Y. and Taylor , B. W. 1989 . A comparative analysis of an MRP lot-for-lot system and a kanban system for a multistage production operation. . International Journal of Production Research , 27 : 1427 – 1443 .
  • Spencer , M. 1995 . Production planning in a MRP/JIT repetitive manufacturing environment. . Production Planning & Control , 6 : 176 – 184 .
  • Vatalaro , J. and Taylor , R. 2005 . Implementing a Mixed Model Kanban System: the Lean Replenishment Technique for Pull Production , Portland, OR : Productivity Press .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.