151
Views
2
CrossRef citations to date
0
Altmetric
ORIGINAL ARTICLES

Sequencing jobs on a non-Markovian machine with random disruptions

&
Pages 671-680 | Received 01 May 2011, Accepted 01 Sep 2011, Published online: 01 Jun 2012

References

  • Adiri , I. , Bruno , J. , Frostig , E. and Kan , A. R. 1989 . Single machine flow-time scheduling with a single breakdown . Acta Informatica , 26 : 679 – 696 .
  • Asmussen , S. , Fiorini , P. , Lipsky , L. , Rolski , T. and Sheahan , R. 2008 . Asymptotic behavior of total times for jobs that must start over if a failure occurs . Mathematics of Operations Research , 33 ( 4 ) : 932 – 944 .
  • Birge , J. , Frenk , J. , Mittenthal , J. and Kan , A. R. 1990 . Single-machine scheduling subject to stochastic breakdowns . Naval Research Logistics , 37 : 661 – 677 .
  • Cai , X. , Sun , X. and Zhou , X. 2003 . Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flow time . Probability in the Engineering and Informational Sciences , 17 ( 4 ) : 467 – 485 .
  • Cai , X. , Sun , X. and Zhou , X. 2004 . Stochastic scheduling subject to machine breakdowns: the preemptive-repeat model with discounted reward and other criteria . Naval Research Logistics , 51 : 800 – 817 .
  • Elmasri , R. and Navathe , S. 1994 . ıFundamentals of Database Systems , Boston , MA : Irwin McGraw-Hill .
  • Feldmann , A. and Whitt , W. 1998 . Finite mixtures of exponentials to long-tail distributions to analyze network perfromance models . Performance Evaluation , 31 : 245 – 279 .
  • Frostig , E. 1991 . A note on stochastic scheduling on a single machine subject to breakdown—the preemptive repeat model . Probability in the Engineering and Informational Sciences , 5 : 349 – 354 .
  • Gleser , L.J. 1989 . The gamma distribution as a mixture of exponential distributions . The American Statistician , 43 ( 2 ) : 115 – 117 .
  • Kasap , N. , Aytug , H. and Paul , A. 2006 . Minimizing makespan on a single machine subject to random breakdowns . Operations Research Letters , 34 ( 1 ) : 29 – 36 .
  • Kasap , N. , Aytug , H. and Paul , A. 2008 . Erratum to “minimizing makespan on a single machine subject to random breakdowns.’ . Operations Research Letters , 36 : 140
  • Walraevens , J. , Steyaert , B. and Bruneel , H. 2006 . A preemptive repeat priority queue with resampling: performance analysis . Annals of Operations Research , 146 ( 1 ) : 189 – 202 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.