497
Views
25
CrossRef citations to date
0
Altmetric
ORIGINAL ARTICLES

Quality bottleneck transitions in flexible manufacturing systems with batch productions

, , &
Pages 190-205 | Received 01 Mar 2011, Accepted 01 Feb 2012, Published online: 08 Nov 2012

References

  • Barad , M. and Nof , S. Y. 1997 . CIM flexibility measures: a review and a framework for analysis and applicability assessment . International Journal of Computer Integrated Manufacturing , 10 : 296 – 308 .
  • Beach , R. , Juhlemann , A. P. , Price , D.H. R. , Paterson , A. and Sharp , J. A. 2000 . A review of manufacturing flexibility . European Journal of Operational Research , 122 : 41 – 57 .
  • Ben-Gal , I. , Herer , Y. T. and Raz , T. 2002 . Self-correcting inspection procedure under inspection errors . IIE Transactions , 34 : 529 – 540 .
  • Biller , S. , Li , J. , Marin , S. P. , Meerkov , S. M. and Zhang , L. 2010 . Bottlenecks in production lines with rework: a systems approach . IEEE Transactions on Automation Science and Engineering , 7 : 208 – 217 .
  • Bolat , A. and Yano , C. 1989 . Procedures to analyze the tradeoffs between costs of setup and utility work for automobile assembly lines Ann Arbor , MI Report 89-3, Department of IOE, University of Michigan
  • Buzacott , J. A. and Shantikumar , J.G. 1993 . Stochastic Models of Manufacturing Systems , Englewood Cliffs , NJ : Prentice Hall .
  • Buzacott , J. A. and Yao , D. D. 1986 . Flexible manufacturing systems: a review of analytical models . Management Science , 32 : 890 – 905 .
  • Chen , F. F. and Adams , E. E. 1991 . The impact of flexible manufacturing systems on productivity and quality . IEEE Transactions on Engineering Management , 38 : 33 – 45 .
  • Das , S. R. and Canel , C. 2005 . An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system . International Journal of Production Economics , 97 : 247 – 262 .
  • Chiang , S.-Y. , Kuo , C.-T. , Lim , J.-T. and Meerkov , S. M. 2000 . Improvability in assembly systems II: improvability indicators and case study . Mathematical Problems in Engineering , 6 : 359 – 393 .
  • Chiang , S.-Y. , Kuo , C.-T. and Meerkov , S. M. 2000 . DT-bottlenecks in serial production lines: theory and application . IEEE Transactions on Robotics and Automation , 16 : 567 – 580 .
  • Chiang , S.-Y. , Kuo , C.-T. and Meerkov , S. M. 2001 . c-Bottlenecks in serial production lines: identification and application . Mathematical Problems in Engineering , 7 : 543 – 578 .
  • Ching , S. N. , Meerkov , S. M. and Zhang , L. 2008 . Assembly systems with non-exponential machines: throughput and bottlenecks . Nonlinear Analysis - Theory and Applications , 69 : 911 – 917 .
  • Finkelshtein , A. , Herer , Y. T. , Raz , T. and Ben-Gal , I. 2005 . Economic optimization of off-line inspection in a process subject to failure and recovery . IIE Transactions , 37 : 995 – 1009 .
  • Inman , R. R. , Blumenfeld , D. E. , Huang , N. and Li , J. 2003 . Production system design for quality: research opportunities from automotive industry prospective . International Journal of Production Research , 41 : 1953 – 1971 .
  • Kuo , C.-T. , Lim , J. T. and Meerkov , S. M. 1996 . Bottlenecks in serial production lines . Mathematical Problems in Engineering , 2 : 233 – 276 .
  • Li , J. , Blumenfeld , D. E. and Marin , S. P. 2008 . Production system design for quality robustness . IIE Transactions , 40 : 162 – 176 .
  • Li , J. and Huang , N. 2007 . Quality evaluation in flexible manufacturing systems: a Markovian approach . Mathematical Problems in Engineering , Article 57128
  • Li , J. and Meerkov , S. M. 2000 . Bottlenecks with respect to due-time performance in pull serial production lines . Mathematical Problems in Engineering , 5 : 479 – 498 .
  • Li , J. and Meerkov , S.M. 2009 . Production Systems Engineering , New York , NY : Springer .
  • Montgomery , D.C. 2009 . Introduction to Statistical Quality Control, sixth edition , New York , NY : J. Wiley .
  • Payne , J. and Cariapa , V. 2000 . A fixture repeatability and reproducibility measure to predict the quality of machined parts . International Journal of Production Research , 38 : 4763 – 4781 .
  • Quadt , D. and Kuhn , H. 2007 . Batch scheduling of jobs with identical process times on flexible flow lines . International Journal of Production Economics , 105 : 385 – 401 .
  • Sethi , A. K. and Sethi , P. S. 1990 . Flexibility in manufacturing: a survey . International Journal of Flexible Manufacturing Systems , 2 : 289 – 328 .
  • Shi , J. 2007 . Stream of Variation Modeling and Analysis for Multistage Manufacturing Processes , Boca Raton , FL : CRC Press .
  • Shi , J. and Zhou , S. 2009 . Quality control and improvement for multistage systems: a survey . IIE Transactions , 41 : 744 – 753 .
  • Tsung , F. , Li , Y. and Jin , M. 2008 . Statistical process control for multistage manufacturing and service operations: a review and some extensions . International Journal of Services Operations and Informatics , 3 : 191 – 204 .
  • Viswanadham , N. and Narahari , Y. 1992 . Performance Modeling of Automated Manufacturing System , Englewood Cliffs , NJ : Prentice Hall .
  • Von Hop , N. and Ruengsak , K. 2005 . Fuzzy estimation for manufacturing flexibility . International Journal of Production Research , 43 : 3605 – 3617 .
  • Wang , J. , Li , J. , Arinez , J. and Biller , S. 2010 . Product sequencing with respect to quality in flexible manufacturing systems with batch operations . IEEE Transactions on Automation Science and Engineering , 7 : 776 – 790 .
  • Wang , J. , Li , J. , Arinez , J. , Biller , S. and Huang , N. 2010 . Quality analysis in flexible manufacturing systems with batch productions: performance evaluation and non-monotonic properties . IEEE Transactions on Automation Science and Engineering , 7 : 671 – 676 .
  • Zhou , M. and Venkatesh , K. 1999 . Modeling, Simulation and Control of Flexible Manufacturing Systems: A Petri Net Approach , Singapore : World Scientific Publishing Company .
  • Zoia , D.E. 2005 . Harbour outlines who’s winning and why Available at: http://www.WardsAuto.com/news-amp-analysis/harbour-outlines-whos-winning-and-why (accessed September 27, 2005)

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.