1,071
Views
25
CrossRef citations to date
0
Altmetric
Original Articles

Modeling, analysis, and improvement of integrated productivity and quality system in battery manufacturing

, , , &
Pages 1313-1328 | Received 01 Jun 2013, Accepted 01 Sep 2014, Published online: 19 Jun 2015

References

  • Arinez, J., Biller, S., Meerkov, S.M. and Zhang, L. (2010) Quality/quantity improvement in an automotive paint shop: a case study. IEEE Transactions on Automation Science and Engineering, 7(4), 755–761.
  • Biller, S., Li, J., Marin, S.P., Meerkov, S.M. and Zhang, L. (2010) Bottlenecks in Bernoulli serial lines with rework. IEEE Transactions on Automation Science and Engineering, 7(2), 208–217.
  • Buzacott, J.A. and Shanthikumar, J.G. (1993) Stochastic Models of Manufacturing Systems, Wiley, Englewood Cliffs, NJ.
  • Chiang, S.Y. (2006) Bernoulli serial production lines with quality control devices: theory and application. Mathematical Problems in Engineering, 2006, article 81950.
  • Chiang, S.Y., Kuo, C.T. and Meerkov, S.M. (2001) c-Bottlenecks in serial production lines: identification and application. Mathematical Problems in Engineering, 7(6), 543–578.
  • Colledani, M., Gandolaa, F., Matta, A. and Tolio, T. (2008) Performance evaluation of linear and non-linear multi-product multi-stage lines with unreliable machines and finite homogeneous buffers. IIE Transactions, 40(6), 612–626.
  • Colledani, M. and Tolio, T. (2009) Performance evaluation of production systems monitored by statistical process control and off-line inspections. International Journal of Production Economics, 120(2), 348–367.
  • Colledani, M. and Tolio, T. (2011) Integrated analysis of quality and production logistics performance in manufacturing lines. International Journal of Production Research, 49(2), 485–518.
  • Dallery, Y., David, R. and Xie, X.-L. (1988) An efficient algorithm for analysis of transfer lnes with unreliable machines and finite buffers. IIE Transactions, 20(3), 280–283.
  • Di Mascolo, M., David, R. and Dallery, Y. (1991) Modeling and analysis of assembly systems with unreliable machines and finite buffers. IIE Transactions, 23(4), 315–330.
  • Emmons, H. and Rabinowitz, G. (2002) Inspection allocation for multistage deteriorating production systems. IIE Transactions, 34(12), 1031–1041.
  • Gershwin, S.B. (1987) An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking. Operations Research, 35(2), 291–305.
  • Gershwin, S.B. (1991) Assembly/disassembly systems: an efficient decomposition algorithm for tree-structured networks. IIE Transactions, 23(4), 302–314.
  • Gershwin, S.B. (1994) Manufacturing Systems Engineering, PTR Prentice Hall, Englewood Cliffs, NJ.
  • Guerrero, C.P.A., Wang, J., Li, J., Arinez, J., Biller, S., Huang, N. and Xiao, G. (2011) Production system design to achieve energy savings in automotive paint shop. International Journal of Production Research, 49(22), 6769–6785.
  • Han, M.S., Lim, J.T. and Park, D.J. (1998) Performance analysis of serial production lines with quality inspection machines. International Journal of Systems Science, 29(9), 939–951.
  • Helber, S. (1999) Performance Analysis of Flow Lines with Non-Linear Flow of Material, Springer, New York, NY.
  • Huang, W., Lin, J., Kong, Z. and Ceglarek, D. (2007) Stream-of-variation (SOVA) modeling II: a generic 3D variation model for rigid body assembly in multi station assembly processes. Journal of Manufacturing Science and Engineering, 129(4), 832–842.
  • Inman, R.R., Blumenfeld, D.E., Huang, N. and Li, J. (2003) Designing production system for quality: research opportunities from automotive industry perspective. International Journal of Production Research, 41(9), 1953–1971.
  • Inman, R.R., Blumenfeld, D.E., Huang, N., Li, J. and Li, J. (2013) Survey of recent advances on the interface between production system design and quality. IIE Transactions, 45(6), 557–574.
  • Jacobs, D. and Meerkov, S.M. (1991) Asymptotically reliable serial production lines with a quality-control system. Computers & Mathematics with Applications, 21(11–12), 85–90.
  • Jacobs, D. and Meerkov, S.M. (1995) A system-theoretic property of serial production lines: improvability. International Journal of Systems Science, 26(4), 755–785.
  • Jin, J. and Shi, J. (1999) State space modeling of sheet metal assembly for dimensional control. Journal of Manufacturing Science and Engineering, 121(4), 756–762.
  • Ju, F., Li, J., Xiao, G. and Arinez, J. (2013) Quality flow model in automotive paint shops. International Journal of Production Research, 51(2), 6470–6483.
  • Ju, F., Li, J., Xiao, G., Huang, N. and Biller, S. (2014) A quality flow model in battery manufacturing systems for electric vehicles. IEEE Transactions on Automation Science and Engineering, 11(1), 230–244.
  • Kim, J. and Gershwin, S.B. (2008) Analysis of long flow lines with quality and operational failures. IIE Transactions, 40(3), 284–296.
  • Kuo, C.T., Lim, J.T. and Meerkov, S.M. (1996) Bottlenecks in serial production lines: a system-theoretic approach. Mathematical Problems in Engineering, 2(3), 233–276.
  • Lawless, J.F., Mackay, R.J. and Robinson, J.A. (1999) Analysis of variation transmission in manufacturing processes-part I. Journal of Quality Technology, 31(2), 131–142.
  • Li, J. (2004a) Modeling and analysis of manufacturing systems with parallel lines. IEEE Transactions on Automatic Control, 49(10), 1824–1832.
  • Li, J. (2004b) Performance analysis of production systems with rework loops. IIE Transactions, 36(8), 755–765.
  • Li, J. (2005) Overlapping decomposition: a system-theoretic method for modeling and analysis of complex manufacturing systems. IEEE Transactions on Automation Science and Engineering, 2(1), 40–53.
  • Li, J., Blumenfeld, D.E., Huang, N. and Alden, J.A. (2009) Throughput analysis of production systems: recent advances and future topics. International Journal of Production Research, 47(14), 3823–3851.
  • Li, J., Blumenfeld, D.E. and Marin, S.P. (2007) Manufacturing system design to improve quality buy rate: an automotive paint shop application study. IEEE Transactions on Automation Science and Engineering, 4(1), 75–79.
  • Li, J., Blumenfeld, D.E. and Marin, S.P. (2008) Production system design for quality robustness. IIE Transactions, 40(3), 162–176.
  • Li, J. and Huang, N. (2005) Modeling and analysis of a multiple product manufacturing system with split and merge. International Journal of Production Research, 43(19), 4049–4066.
  • Li, J. and Meerkov, S.M. (2000) Bottlenecks with respect to due-time performance in pull serial production lines. Mathematical Problems in Engineering, 5(6), 479–498.
  • Li, J. and Meerkov, S.M. (2009) Production Systems Engineering, Springer, New York, NY.
  • Li, S., Wang, H., Hu, S.J., Lin, Y.-T. and Abell, J.A. (2010) Automatic generation of assembly system configuration with equipment selection for automotive battery manufacturing. Journal of Manufacturing Systems, 30(4), 188–195.
  • Li, Y., Chang, Q., Biller, S. and Xiao, G. (2013) Event-based modelling of distributed sensor networks in battery manufacturing. International Journal of Production Research, 52(14), 4239–4252.
  • Lim, J.T., Meerkov, S.M. and Top, F. (1990) Homogeneous, asymptotically reliable serial production lines: theory and a case study. IEEE Transactions on Automatic Control, 35(5), 524–534.
  • Liu, X.G. and Buzacott, J.A. (1990) Approximate models of assembly systems with finite inventory banks. European Journal of Operational Research, 45(2–3), 143–154.
  • Liu, Y. and Li, J. (2010) Split and merge production systems: performance analysis and structural properties. IIE Transactions, 42(6), 422–434.
  • Loose, J.P., Zhou, Q., Zhou, S. and Ceglarek, D. (2010) Integrating GD&T into dimensional variation models for multistage machining processes. International Journal of Production Research, 48(11), 3129–3149.
  • Maggio, N., Matta, A., Gershwin, S.B. and Tolio, T. (2009) A decomposition approximation for three-machine closed-loop production systems with unreliable machines, finite buffers and a fixed population. IIE Transactions, 41(6), 562–574.
  • Meerkov, S.M. and Zhang, L. (2010) Product quality inspection in bernoulli lines: analysis, bottlenecks and design. International Journal of Production Research, 48(16), 4745–4766.
  • Meerkov, S.M. and Zhang, L. (2011) Bernoulli production lines with quality-quantity coupling machines: monotonicity properties and bottlenecks. Annals of Operations Research, 182(1), 119–131.
  • Papadopoulos, H.T., Heavey, C. and Browne, J. (1993) Queueing Theory in Manufacturing Systems Analysis and Design, Chapman & Hall, London, UK.
  • Rahim, M.A. (1994) Joint determination of production quantity, inspection schedule and control chart design. IIE Transactions, 26(6), 2–11.
  • Shi, J. and Zhou, S. (2009) Quality control and improvement for multistage systems: a survey. IIE Transactions, 41(9), 744–753.
  • Tolio, T., Matta, A. and Gershwin, S.B. (2002) Analysis of two-machine lines with multiple failure modes. IIE Transactions, 34(1), 51–62.
  • Wang, J., Li, J., Arinez, J. and Biller, S. (2010) Product sequencing with respect to quality in flexible manufacturing systems with batch operations. IEEE Transactions on Automation Science and Engineering, 7(3), 776–790.
  • Wang, J., Li, J., Arinez, J. and Biller, S. (2013) Quality bottleneck transitions in flexible manufacturing systems with batch productions. IIE Transactions, 45(2), 190–205.
  • Wang, J., Li, J. and Huang, N. (2011) Optimal vehicle batching and sequencing to reduce energy consumption and atmospheric emissions in automotive paint shops. International Journal of Sustainable Manufacturing, 2(2/3), 141–160.
  • Wang, J., Li, J. and Huang, N. (2012) Indicators for quality improvability and bottleneck sequence in flexible manufacturing systems with batch productions. International Journal of Production Research, 50(22), 6388–6402.
  • Zeng, L., Jin, N. and Zhou, S. (2008) Multiple fault signature integration and enhancing for variation source identification in manufacturing processes. IIE Transactions, 40(10), 919–930.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.