References
- Asmussen, S. (2000) Matrix-analytic models and their analysis. Scandinavian Journal of Statistics, 27, 193–226.
- Assaf, D. and Shanthikumar, J.G. (1987) Optimal group maintenance policies with continuous and periodic inspection. Management Science, 33, 1440–1452.
- Barron, Y., Frostig, E. and Levikson, B. (2004) Analysis of R-out-of-N repairable systems: the case of phase-type distribution. Advances in Applied Probability, 36, 116–138.
- Barron, Y., Frostig, E. and Levikson, B. (2006) Analysis of R out of N systems with several repairmen, exponential life times and phase type repair times: an algorithmic approach. European Journal of Operational Research, 169, 202–225.
- Bjarnason, E.T.S., Taghipour, S. and Banjevic, D. (2014) Joint optimal inspection and inventory for a k-out-of-n system. Reliability Engineering and System Safety, 131, 203–215.
- Bobbio, A. and Cumani, A. (1983) A Markov approach to wear-out modelling. Microelectronics and Reliability, 23, 113–119.
- Connor, M.A. (2008) Wastewater treatment in Antarctica. Journal of the Scott Polar Research Institute, 44, 165–171.
- Das, K., Lashkari, R.S. and Sengupta, S. (2007) Machine reliability and preventive maintenance planning for cellular manufacturing systems. European Journal of Operational Research, 183, 162–180.
- Johnson, M.A. (1993) Selecting parameters of phase distributions: combining nonlinear programming, heuristics, and Erlang distributions. ORSA Journal of Computing, 5, 69–80.
- Latouche, G. and Ramaswami, V. (1999) Introduction to Matrix Analytic Methods in Stochastic Modelling, ASA-SIAM, Philadelphia, PA.
- Levitin, G., Xing, L. and Dai, Y. (2014) Optimal component loading in 1-out-of-N cold standby systems. Reliability Engineering and System Safety, 127, 58–64.
- Malhotra, M. and Reibman, A. (1993) Selecting and implementing phase approximations for semi-Markov models. Communications in Statistics. Stochastic Models, 9, 473–506.
- Neuts, M.F. (1981) Matrix-Geometric Solutions in Stochastic Models: An Algorithmic Approach, Johns Hopkins University Press, Baltimore, MD.
- Neuts, M.F., Pérez-Ocón, R. and Torres-Castro, I. (2000) Repairable models with operating and repair times governed by phase type distributions. Advances in Applied Probability, 32, 468–479.
- Park, K.S. and Yoo, Y.K. (2004) Comparison of group replacement policies under minimal repair. International Journal of System Science, 35, 179–184.
- Pérez-Ocón, R. and Montro-Cazorla, D. (2004) A multiple system governed by a quasi-birth-and-death process. Reliability Engineering and System Safety, 84, 187–196.
- Pham, H. and Wang, H. (2000) Optimal (τ; T) opportunistic maintenance of a k-out-of-n: G system with imperfect PM and partial failure. Naval Research Logistics, 47, 223–239.
- Popova, E. and Wilson, J.G. (1996) Selecting and implementing the best group replacement policy for a non-Markovian system, in Proceedings of the International Conference on Probabilistic Safety Assessment and Management, Springer, London, pp. 58–63.
- Popova, E. and Wilson, J.G. (1999) Group replacement policies for parallel system whose components have phase distributed failure times. Annals of Operations Research, 91, 163–189.
- Ritchken, P. and Wilson, J.G. (1990) (m, T) group maintenance policies. Management Science, 36, 632–639.
- Smith, M.A.J. and Dekker, R. (1997) Preventive maintenance in a 1 out of n system: the uptime, downtime and costs. European Journal of Operational Research, 99, 565–583.
- Sung, C.K., Sheu, S.H., Hsu, T.S. and Chen, Y.C. (2013) Extended optimal replacement policy for a two-unit system with failure rate interaction and external shocks. International Journal of Systems Science, 44, 877–888.
- Taghipour, S. (2014) Optima inspection model for a load-sharing redundant system, in Proceedings of the Annual Reliability and Maintainability Symposium, IEEE, pp. 1–5.
- Taghipour, S. and Banjevic, D. (2012) Optimal inspection interval for a system under periodic and opportunistic inspections. IIE Transactions, 77, 932–948.
- Van Noortwijk, J.M. (2009) A survey of the application of gamma processes in maintenance. Reliability Engineering and System Safety, 94, 2–21.
- Wu, Q. (2012) Reliability analysis of a cold standby system attacked by shocks. Applied Mathematics and Computation, 218, 11654–11673.
- Yoo, Y.K. (2011) Operating characteristics of a failure counting group replacement policy. International Journal of System Science, 42, 499–506.