The Tigris hydropower system operations: the need for an integrated approach

&
Pages 110-125 | Received 24 Mar 2017, Accepted 12 Aug 2017, Published online: 11 Oct 2017

References

  • Aksa (Aksa Energy Generation Incorporated Company). (2004). Kor Barajı ve HES fizibilite raporu [Kor Dam and HEPP feasibility report]. Istanbul: Aksa Energy Generation Incorporated Company.
  • DMI (General Directorate of State Meteorological Works). (2009). Monthly total precipitation, monthly mean temperature and monthly total evaporation records. Ankara: General Directorate of State Meteorological Works.
  • DSI (Department of Investigation and Planning of State Hydraulic Works). (1986). Bitlis-Güzeldere Projesi ön fizibilite raporu [The Bitlis-Guzeldere project pre-feasibility report]. Ankara: Department of Investigation and Planning of State Hydraulic Works.
  • DSI (General Directorate of State Hydraulic Works). (2007). Akım gözlem istasyonları, aylık toplam akımlar (1954–2000) [Flow gauging stations, monthly total flows (1954–2000)]. Ankara: General Directorate of State Hydraulic Works.
  • DSI (General Directorate of State Hydraulic Works). (2009). Turkey water report. Ankara: General Directorate of State Hydraulic Works.
  • DSI (General Directorate of State Hydraulic Works). (2014). Retrieved May 25, 2014 from https://www.dsi.gov.tr/
  • DSI (Xth Regional Directorate of State Hydraulic Works). (1999). Dicle Havzası, Ergani Projesi planlama raporu [The Tigris Basin, the Ergani project planning report]. Diyarbakir: Xth Regional Directorate of State Hydraulic Works.
  • DSI (XVIIth Regional Directorate of State Hydraulic Works). (1987). Bitlis-Garzan Projesi, Ayşehatun Barajı ve HES planlama raporu [The Bitlis-Garzan Project, Aysehatun dam and HEPP planning report]. Van: XVIIth Regional Directorate of State Hydraulic Works.
  • EIE (General Directorate of Electrical Power Resources Survey and Development Administration). (1986). Dicle Nehri, Botan Çayı istikşaf raporu, yayın no: 86–53 [The Tigris River, Botan Creek reconnaissance report, publication no: 86–53]. Ankara: General Directorate of Electrical Power Resources Survey and Development Administration.
  • EIE (General Directorate of Electrical Power Resources Survey and Development Administration). (1990). Bitlis Çayı istikşaf raporu, yayın no: 90–62 [Bitlis Creek reconnaissance report, publication no: 90–62]. Ankara: General Directorate of Electrical Power Resources Survey and Development Administration.
  • EIE (General Directorate of Electrical Power Resources Survey and Development Administration). (2000). Türkiye akarsularında sediment gözlemleri ve sediment taşınım miktarları, yayın no: 20–17 [Suspended sediment data and sediment transport amounts for surface waters in Turkey, publication no: 20–17]. Ankara: General Directorate of Electrical Power Resources Survey and Development Administration.
  • EIE (General Directorate of Electrical Power Resources Survey and Development Administration). (2003). Aylık ortalama akımlar (1935–2000) [Monthly mean discharges (1935–2000)]. Ankara: General Directorate of Electrical Power Resources Survey and Development Administration.
  • Enersu (Enersu Engineering Consultancy Construction Industry and Trade Limited Company). (2008). Garzan Barajı ve HES revize fizibilite raporu [Garzan dam and HEPP revised feasibility report]. Ankara: Enersu Engineering Consultancy Construction Industry and Trade Limited Company.
  • Enersu (Enersu Engineering Consultancy Construction Industry and Trade Limited Company). (2009). Sirvan Barajı ve HES revize fizibilite raporu [Sirvan dam and HEPP revised feasibility report]. Ankara: Enersu Engineering Consultancy Construction Industry and Trade Limited Company.
  • En-Su (En-Su Engineering Consultancy Limited Company). (2008). Dipni Barajı ve HES Projesi fizibilite raporu [The Dipni Dam and HEPP Project feasibility report]. Ankara: En-Su Engineering Consultancy Limited Company.
  • FPGA (Euphrates Planning Group Authority) (1968). Dicle Havzası istikşaf raporu [The Tigris Basin reconnaissance report]. Diyarbakir: Euphrates Planning Group Authority.
  • Guven, B. (2014). Çözümün ve işsizliğin anahtarı GAP oldu [GAP has been the key of solution and unemployment]. Retrieved October 12, 2014, from https://www.turkiyegazetesi.com.tr/gundem/191122.aspx
  • Hidrokon (Hidrokon Engineering Consultancy Incorporated Company). (2009). Çetin Barajı ve HES fizibilite raporu [Cetin Dam and HEPP feasibility report]. Ankara: Hidrokon Engineering Consultancy Incorporated Company.
  • Ilisu Dam and HEPP Engineering and Consultancy Services Consortium. (2008). Ilisu Dam and HEPP, flood hydrology and sediment transport. Ankara: Ilisu Dam and HEPP Engineering and Consultancy Services Consortium: Colenko Power Engineering Limited, IM Maggia Engineering, Dolsar Engineering and Rast Engineering Services Limited.
  • Ilisu Environment Group. (2005). Ilisu Dam and HEPP environment impact assessment report with enclosures. Ilisu Environment Group: Hydro Concepts Engineering, Hydro Quebec International and Archeotec Incorporated.
  • Ilisu Hydropower Consultants. (1983). The Cizre Dam and HEPP Project feasibility report. Ilisu Hydropower Consultants: Binnie & Partners, Gizbili Consultancy Engineering, James Williamson & Partners, Kennedy & Donkin and COBA.
  • Jemas-Su (Jemas-Su Groundwater Survey and Engineering Limited Company). (2001). Bitlis-Garzan Projesi, 1987 yılında hazırlanan Ayşehatun Barajı ve HES planlama raporunun revize bölümleri [The Bitlis-Garzan Project, revised sections of Aysehatun Dam and HEPP planning report prepared in 1987]. Ankara: Jemas-Su Groundwater Survey and Engineering Limited Company.
  • Kaplan, N. (2012). Susuz GAP [Waterless GAP]. Retrieved May 15, 2014, from https://www.ntv.com.tr/arsiv/id/25344895
  • Limak (Limak Hydropower Plant Investments Incorporated Company). (2006). Alkumru Barajı ve HES Projesi fizibilite raporu [The Alkumru Dam and HEPP project feasibility report]. Ankara: Limak Hydropower Plant Investments Incorporated Company.
  • Met (Met Project Engineering Consultancy Construction Industry and Trade Limited Company). (2006). Eruh Barajı ve HES fizibilite raporu [Eruh Dam and HEPP feasibility report]. Ankara: Met Project Engineering Consultancy Construction Industry and Trade Limited Company.
  • Murtagh, B. A., Saunders, M. A., Murray, W., & Gill, W. E. (2014). MINOS solver manual. Retrieved October 12, 2014, from https://www.gams.com/dd/docs/solvers/minos.pdf
  • Pro-sem (Pro-sem Engineering Architecture Consultancy Limited Company). (2008). Pülümür Barajı ve HES fizibilite raporu [Pulumur Dam and HEPP feasibility report]. Ankara: Pro-sem Engineering Architecture Consultancy Limited Company.
  • Su Yapi (Su Yapi Engineering and Consultancy Incorporated Company). (2007). Dicle Nehri, Botan Çayı, Pervari Barajı ve HES tesisleri ön fizibilite raporu (Ek 3A) [The Tigris River, Botan Creek, Pervari Dam and HEPP establishments pre-feasibility report (Appendix 3A)]. Ankara: Su Yapi Engineering and Consultancy Incorporated Company.
  • Suis and Sial (Suis Project Engineering and Consultancy Limited Company & Sial Geosciences Survey and Consultancy Limited Company Joint Venture). (2001). GAP, Batman-Silvan Projesi planlama raporu [GAP, the Batman-Silvan Project planning report]. Ankara: Suis Project Engineering and Consultancy Limited Company & Sial Geosciences Survey and Consultancy Limited Company Joint Venture.
  • Tigrek, S., & Aras, T. (2011). Reservoir sediment management. Leiden: CRC Press/Balkema.
  • Unver, I. H. O. (1997). South-eastern Anatolia integrated development project (GAP), Turkey: An overview of issues of sustainability. International Journal of Water Resources Development, 13, 187–208. doi:10.1080/07900629749827
  • Yalcin, E. (2015). Optimisation of the Tigris river hydropower system operations (Doctoral thesis). Middle East Technical University, Ankara.
  • Yalcin, E., & Tigrek, S. (2015). Hydropower production without sacrificing environment: A case study of Ilisu Dam and Hasankeyf. International Journal of Water Resources Development, 32(2), 247–266. doi:10.1080/07900627.2015.1031210
  • Yolsu (Yolsu Engineering Services Limited Company). (2009). Başören HES fizibilite raporu [Basoren HEPP feasibility report]. Ankara: Yolsu Engineering Services Limited Company.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.