REFERENCES
- De Koning, H., De Mast, J. (2007). The CTQ flowdown as a conceptual model of project objectives. Quality Management Journal, 14(2):19–28.
- De Mast, J., Does, R. J. M. M., De Koning, H., Lokkerbol, J. (2012). Lean Six Sigma for Services and Healthcare. Alphen aan den Rijn, The Netherlands: Beaumont Quality Publications.
- Does, R. J. M. M., Roes, K. C. B., Trip, A. (1999). Statistical Process Control in Industry. Dordrecht, The Netherlands: Kluwer Academic.
- Goldratt, E. M. (1984). The Goal: A Process of Ongoing Improvement. Great Barrington, MA: North River Press.
- Nakajima, S. (1988). Introduction to TPM: Total Productive Maintenance. Cambridge, MA: Productivity Press.
- Ohno, T. (1988). Toyota Production System: Beyond Large-Scale Production. Portland, OR: Productivity Press.
- Slack, N., Chambers, S., Johnston, R. (2010). Operations Management. Essex, UK: Prentice Hall.
- Womack, J. (2011). Gemba Walks. Cambridge, MA: Lean Enterprise Institute.