69
Views
5
CrossRef citations to date
0
Altmetric
Original Articles

Simulation-based performance measurement and analysis: an industrial application

Pages 402-407 | Published online: 19 Feb 2007

References

References

  • Artiba A Emelyanov VV Iassinovski SI Introduction to Intelligent Simulation: The RAO Language 1998 (Kluwer Academic Publishers)
  • Booch G Rumbaugh J Jacobson I The Unified Modeling Language—User Guide 1999 (Addison Wesley: New York)
  • Brown WJ Malveau RC McCormick HW Mowbray TJ Anti Patterns—Refactoring Software, Architectures and Projects in Crisis 1998 (Wiley Computer Publishing: New York)
  • Carlier J Chrétienne P Problèmes d'ordonnancement, modélisation, complexité, algorithmes 1998 (Masson : Milan)
  • Gamma E Helm R Johnson R Vlissides J Design Patterns CD—Elements of Reusable Object-Oriented Software 1995 (Addison-Wesley: New York). (CDROM)
  • Hansmann , K-W and Hoeck , M . 1997 . Production control of a flexible manufacturing system in a job shop environment . International Transactions in Operational Research , 4 ( 5/6 ) : 341 – 351 .
  • Jain , A and Meeran , S . 1999 . Deterministic job-shop scheduling: past, present and future . European Journal of Operational Research , 13 : 390 – 434 .
  • Pinedo M Scheduling—Theory, Algorithms, and Systems 1995 (Prentice Hall: New York)
  • Pinedo M Chao X Operations Scheduling with Applications in Manufacturing and Services 1999 (Irwin/McGraw-Hill: New York)
  • Smith , ML and Seidmann , A . 1983 . Due date selection procedures for job-shop simulation . Computers and Industrial Engineering Journal , 7 ( 3 ) : 199 – 207 .
  • Vernadat F Techniques de Modélisation en Entreprise : Applications aux Processus Opérationnels 1999 (Economica)
  • Vlissides J Pattern Hatching—Design Patterns Applied 1998 (Addison-Wesley: New York)
  • Waikar , AM , Sarker , BR and Lal , AM . 1995 . A comparative study of some priority dispatching rules under different shop loads . Production Planning Control , 6 ( 4 ) : 301 – 310 .
  • Zobrist GW Leonard JV Object-Oriented Simulation—Reusability, Adaptability, Maintainability 1997 (IEEE Press)

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.