References
- Al-Harkan , I. M. and Al-Fawzan , M. A. 2001 . An integrated simulation-genetic algorithm model for buffer allocation in unreliable production lines . First International Industrial Engineering Conference . September 23–27 2001 , Amman, Jordan. pp. 397 – 405 .
- Buzacott , J. A. and Kostelski , D. 1987 . Matrix- geometric and recursive algorithm solution of a two-stage unreliable flow line . AIIE Trans , 19 : 429 – 438 .
- Castro , H. F.D. and Cavalce , K. L. 2006 . Maintenance resources optimization applied to a manufacturing system . Reliability Engng System Safety , 91 : 413 – 420 .
- Conway , R. W. , Maxwell , W. L. , McClain , J. O. and Thomas , L. J. 1988 . The role of work-in-process inventories in series production lines . Ops Res. , 36 : 229 – 241 .
- Cho , I. D. and Parlar , M. 1991 . A survey of maintenance models for multi-unit systems . Eur. J. Opl Res. , 51 : 1 – 23 .
- Choong , Y. F. and Gershwin , S. B. 1989 . A decomposition method for the approximate evaluation of capacitated transfer lines with unreliable machines and random processing times . IIE Trans , 19 : 150 – 158 .
- Dallery , Y. and Le Bihan , H. 1997 . Homogenization techniques for the analysis of production lines with unreliable machines having different speeds . Eur. J. Control , 3 : 200 – 215 .
- Dekker , R. 1996 . Applications of maintenance optimization models: a review and analysis . Reliability Engng System Safety , 51 : 229 – 240 .
- Dolgui , A. , Eremeev , A. , Kolokolov , A. and Vjacheslav , S. 2000 . A genetic algorithm for buffer allocation in production line with unreliable machines . Proceedings of the International Workshop for Discrete Optimization Methods in Scheduling and Computer-Aided Design , 5 : 26 – 32 .
- Gershwin , S. B. and Schick , I. C. 1983 . Modeling and analysis of three stage transfer lines with unreliable machines and finite buffers . Ops Res. , 31 : 354 – 379 .
- Gershwin , S. B. 1987 . An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking . Ops Res. , 35 : 291 – 305 .
- Gershwin , S. B. and Schor , J. E. 2000 . Efficient algorithms for buffer space allocation . Annls Ops Res. , 93 : 117 – 144 .
- Heavey , C. , Papadopoulos , H. D. and Browne , J. 1993 . The throughput rate of multi-station unreliable production lines . Eur. J. Opl Res. , 68 : 69 – 89 .
- Hillier , F. S. and So , K. C. 1991 . The effect of the coefficient of variation of operation times on the allocation of storage space in production line system . IIE Trans , 23 : 198 – 206 .
- Hillier , F. S. , So , K. C. and Boling , R. W. 1993 . Notes: toward characterizing the optimal allocation of storage space in production line systems with variable processing times . Mgmt Sci. , 39 : 126 – 133 .
- Houshyar , A. 1992 . Determination of optimal intermediate storage capacity . Comput. Ind. Engng , 22 : 9 – 18 .
- Kulturel-Konak , S. , Smith , A. E. and Coit , D. W. 2003 . Efficiently solving the redundancy allocation problem using tabu search . IIE Trans , 35 : 515 – 526 .
- Kyriakidis , E. G. and Dimitrakos , T. D. 2006 . Optimal preventive maintenance of a production system with an intermediate buffer . Eur. J. Opl Res. , 168 : 86 – 99 .
- Levitin , G. and Meizin , L. 2001 . Structure optimization for continuous production systems with buffers under reliability constraints . Int. J. Prod. Econ. , 70 : 77 – 787 .
- Liu , X-G. and Buzacott , J. A. 1990 . Approximate models of assembly systems with finite banks . Eur. J. Opl Res. , 45 : 145 – 154 .
- Mak , K. L. 1986 . The allocation of inter-stage buffer storage capacity in production lines . Comput. Ind. Engng , 10 : 163 – 169 .
- Mohanty , R. P. , Dey , D. and Kulkarni , R. V. 1989 . A computer algorithm for determining optimal buffer size in a serial flow production system . Comput. Ind. Engng , 16 : 75 – 86 .
- Nahas , N. , Nouralfath , M. and Ait-Kadi , D. 2004 . Ant colonies for structure optimization in a failure prone production system . Proceedings of the International Conference on Industrial Engineering and Systems Management, IESM'2005 . May 16–19 2004 , Marrakech, Morocco.
- Papadopoulos , H. T. and Heavey , C. 1996 . Queuing theory in manufacturing systems analysis and design: a classification of models for production and transfer lines . Eur. J. Opl Res. , 92 : 1 – 27 .
- Papadopoulos , H. T. and Vouros , G. A. 1996 . A model management system (MMS) for the design and operation of production lines . Int. J. Prod. Res. , 35 : 2213 – 2236 .
- Powel , S. G. 1994 . Buffer allocation in unbalanced three-station serial lines . Int. J. Prod. Res. , 32 : 2201 – 2217 .
- Powel , S. G. and Pyke , D. F. 1996 . Allocation of buffers to serial production lines with bottlenecks . IIE Trans , 28 : 18 – 29 .
- Savsar , M. and Biles , W. E. 1984 . Two-stage production lines with single repair crew . Int. J. Prod. Res. , 22 : 499 – 514 .
- Savsar , M. 1997 . Simulation analysis of maintenance policies in just-in-time production systems . Int. J. Ops Prod. Mgmt , 17 : 256 – 266 .
- Savsar , M. and Youssef , A. S. 2004 . An integrated simulation-neural network meta model application in designing production flow lines . WSEAS Trans Electronics , 2 : 366 – 371 .
- Savsar , M. 2006 . Effects of maintenance policies on the productivity of flexible manufacturing cells . Omega , 34 : 274 – 282 .
- Sheu , C. and Krajewski , L. J. 1994 . A decision model for corrective maintenance management . Int. J. Prod. Res. , 32 : 1365 – 1382 .
- Vatn , J. , Hokstad , P. and Bodsberg , L. 1996 . An overall model for maintenance optimization . Reliability Engng System Safety , 51 : 241 – 257 .
- Villa , A. , Fassino , B. and Rossetto , S. 1986 . Buffer size planning versus transfer line efficiency . J. Engng Ind. , 108 : 105 – 112 .
- Vouros , G. A. and Papadopoulos , H. T. 1998 . Buffer allocation in unreliable production lines using a knowledge based system . Comput. Ops Res. , 25 : 1055 – 1067 .
- Vouros , G. A. , Vidalis , M. I. and Papadopoulos , H. T. 2000 . A heuristic algorithm for buffer allocation in unreliable production lines . Int. J. Quantitative Methods , 6 : 23 – 43 .
- Waeyenbergh , G. and Pintelon , L. 2004 . Maintenance concept development: a case study . Int. J. Prod. Econ. , 89 : 395 – 405 .
- Yeralan , S. and Muth , E. J. 1987 . A general model of a production line with intermediate buffer and station breakdown . AIIE Trans , 19 : 130 – 139 .