298
Views
14
CrossRef citations to date
0
Altmetric
Articles

Integrated line balancing to attain Shojinka in a multiple straight line facility

, &
Pages 402-411 | Received 03 Jan 2009, Accepted 14 Jan 2010, Published online: 23 Apr 2010

References

  • Aase , G. R. , Olson , J. R. and Schniederjans , M. J. 2004 . U-shaped assembly line layouts and their impact on labor productivity: An experimental study . European Journal of Operational Research , 156 ( 3 ) : 698 – 711 .
  • Baybars , I. 1986 . A survey of exact algorithms for the simple line balancing problem . Management Science , 32 ( 8 ) : 909 – 932 .
  • Becker , C. and Scholl , A. 2006 . A survey on problems and methods in generalised assembly line balancing . European Journal of Operational Research , 168 ( 3 ) : 694 – 715 .
  • Boysen , N. , Fliedner , M. and Scholl , A. 2007 . A classification of assembly line balancing problems . European Journal of Operational Research , 183 ( 2 ) : 674 – 693 .
  • Chiang , W. C. , Kouvelis , P. and Urban , T. L. 2007 . Line balancing in a just-in-time production environment: balancing multiple U-lines . IEEE Transactions , 39 ( 4 ) : 347 – 359 .
  • Erel , E. and Sarin , S. C. 1998 . A survey of the assembly line balancing procedures . Production Planning and Control , 9 ( 5 ) : 414 – 434 .
  • Erel , E. , Sabuncuoğlu , I. and Aksu , B. A. 2001 . Balancing of U-type assembly systems using simulated annealing . International Journal of Production Research , 39 ( 13 ) : 3003 – 3015 .
  • Ghosh , S. and Gagnon , J. 1989 . A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems . International Journal of Production Research , 27 ( 4 ) : 637 – 670 .
  • Gökçen , H. , Ağpak , K. and Benzer , R. 2006 . Balancing of parallel assembly lines . International Journal of Production Economics , 103 ( 2 ) : 600 – 609 .
  • Gökçen , H. and Ağpak , K. 2006 . A goal programming approach to simple U-line balancing problem . European Journal of Operational Research , 171 ( 2 ) : 577 – 585 .
  • Miltenburg , J. and Wijngaard , J. 1994 . The U-line balancing problem . Management Science , 40 ( 10 ) : 1378 – 1388 .
  • Miltenburg , J. 1998 . Balancing U-lines in a multiple U-line facility . European Journal of Operational Research , 109 ( 1 ) : 1 – 23 .
  • Monden , Y. 1993 . Toyota production system , Norcross, GA : Engineering and Management Press .
  • Salveson , M. E. 1955 . The assembly line balancing problem . Journal of Industrial Engineering , 6 ( 3 ) : 18 – 25 .
  • Scholl , A. and Klein , R. 1999 . Ulino: Optimally balancing U-shaped JIT assembly lines . International Journal of Production Research , 37 ( 4 ) : 721 – 736 .
  • Schrage , L. 2002 . LINGO release 8.0. LINGO System Inc
  • Sennott , L. I. , Oyen , M. P.V. and Iravani , S. M.R. 2006 . Optimal dynamic assignment of a flexible worker on an open production line with specialists . European Journal of Operational Research , 170 ( 2 ) : 541 – 566 .
  • Sparling , D. 1998 . Balancing Just-In-Time production units: the N U-line balancing problem . Information Systems and Operational Research , 36 ( 4 ) : 215 – 237 .
  • Urban , T. L. 1998 . Optimal balancing of U-shaped assembly lines . Management Science , 44 ( 5 ) : 738 – 741 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.